[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022679":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1022679,751,1,"单选题","要求装设两套主、副电能表的关口计量点是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","执行辛谷电价的计量点；",false,{"key":16,"text":17,"correct":18},"B","发电厂、省级电网或计量需要所指定的电量计量点；",true,{"key":20,"text":21,"correct":14},"C","省级电网内的重要联络线；",{"key":23,"text":24,"correct":14},"D","发电厂和变电所的出线.","",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]