[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022677":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1022677,751,1,"单选题","电能关口计量点由（ ）确定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","省级电网；",false,{"key":16,"text":17,"correct":14},"B","发电厂、高压用户企业；",{"key":19,"text":20,"correct":14},"C","地区电网；",{"key":22,"text":23,"correct":24},"D","上述四方之间协商。",true,"",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]