[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022668":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1022668,751,1,"单选题","一个具备64个厂站电网规模的SCADA系统处理能力，其实时信息与数据容量规模为（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","YX：24576，YC：16384，YT：2048，计算量：8192；",false,{"key":16,"text":17,"correct":14},"B","YX：32768，YC：16384，YT：4096，计算量：6144；",{"key":19,"text":20,"correct":14},"C","YX：16384,YC：12288，YT：3072，计算量：4096；",{"key":22,"text":23,"correct":24},"D","YX：32768，YC：16384，YT：4096，计算量：8192,",true,"",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]