[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022592":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1022592,751,1,"单选题","对发电机定子绕组及引出线的相间故障应装设专门保护作为发电机主保护。 对发电机变压器组，当发电机变压器之间没有断路器时，100MW及以下发电机应装设（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","电流速断；",false,{"key":16,"text":17,"correct":14},"B","低电压闭锁过流；",{"key":19,"text":20,"correct":14},"C","发电机纵联差动；",{"key":22,"text":23,"correct":24},"D","发电机变压器组共用纵联差动。",true,"按照4.2.3.3及4.2.3.4条要求，第（2)题答案为D。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]