[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022480":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1022480,751,1,"单选题","35~110kV无人值班变电所的控制要求。 下列电气一次设备，不在远方控制端控制的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","6~110kV线路，主变压器，母线各电容器的断路器，负荷开关；",false,{"key":16,"text":17,"correct":14},"B","主变压器有载调压分接开关；",{"key":19,"text":20,"correct":14},"C","需要远方控制改变运行方式的主变压器中性点接地隔离开关；",{"key":22,"text":23,"correct":24},"D","需改变运行方式的母线切换隔离开关。",true,"根据《35kV~110kV无人值班变电所设计规程KDL\u002FT5103—1999)第6. 5.3条。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]