[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022406":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1022406,751,1,"单选题","某电厂有两台300MW机组，采用发电机变压器组向500kV系统送电。 根据现有控制水平，该电厂考虑()控制接线较合适。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","单元控制室钱电一对一控制接线；",false,{"key":16,"text":17,"correct":14},"B","主控制室弦电一对一控制接线；",{"key":19,"text":20,"correct":21},"C","单元控制室计算机监控接线，在发电机控制屏上保留部分必须的硬手操设备元件；",true,{"key":23,"text":24,"correct":14},"D","全部用计算机监控的接线。","依据《火力发电厂、变电所二次接线设计技术规程》(DL\u002FT 5136—2001)第5.0.1条和7.5.4条。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]