[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022344":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1022344,751,1,"单选题","对于经或不经消弧线圈接地的发电厂、变电站，请根据两种不同情况确定其计算用的接地故障电流I。 装设消弧线圈时，接地故障电流取值为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","等于接在同一接地装置中同一系统各消弧线圈額定电流总和；",false,{"key":16,"text":17,"correct":14},"B","等于系统中断开最大一台消弧线圈或系统中最长线路被切除时的最大可能残余电流值；",{"key":19,"text":20,"correct":21},"C","等于接在同一接地装置中同一系统各消弧线围额定电流总和的1.25倍；",true,{"key":23,"text":24,"correct":14},"D","等于接在同一系统各消弧线圈额定电流总和。","根据 DL\u002FT621—1997P4第5.1.1条b）3）款规定。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]