[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022343":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1022343,751,1,"单选题","对于经或不经消弧线圈接地的发电厂、变电站，请根据两种不同情况确定其计算用的接地故障电流I。 不装设消弧钱圈时，接地故障电流取值为（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","等于系统中断开最大一台消弧线困或系统中最长线路被切除时的最大可能残余电流值；",true,{"key":16,"text":17,"correct":18},"B","等于接地装置内短路时流经接地装置流入地中的电流；",false,{"key":20,"text":21,"correct":18},"C","等于接地装置外短路时流经接地装置流入地中的电流；",{"key":23,"text":24,"correct":18},"D","等于接地装置内、外短路时流经接地装里流入地中的电流。","根据 DL\u002FT621—1997P4第5.1.1条b）3）款规定。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]