[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1021930":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1021930,751,1,"单选题","某热电厂扩建2台机组，发电机单机额定容量Se=50MW,额定功率因数为0.85,额定电压Ue=10.5kV，2台发电机以扩大单元接线接入已建的11OkV升压站。经计算，发电机电压回路及主变压器低压绕组的电容电流总计为4.5A。 2台机组的中性点接地方式一般是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","中性点不接地；",false,{"key":16,"text":17,"correct":14},"B","中性点直接接地；",{"key":19,"text":20,"correct":14},"C","中性点经消弧线圈接地（过补偿）；",{"key":22,"text":23,"correct":24},"D","中性点经消弧线国接地（欠补偿）。",true,"根据《电力工程电气设计手册》（1）第2-7节第三条之规定，对容量为50MW及以下的发电机，接地电流超过4A且采用单元接线时，中性点宜经消弧线圈接地（欠补偿）。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]