[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1021884":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1021884,751,1,"单选题","穿墙套管的选择。 装在屋内的穿墙套管的环境条件，需要校验的项目包括（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境温度；",true,{"key":16,"text":17,"correct":18},"B","最大风速；",false,{"key":20,"text":21,"correct":18},"C","日温差；",{"key":23,"text":24,"correct":18},"D","污秽。","根据DL\u002FT5222—2005第21.0.2、21.0.3、21.0.4条和《电力工程电气设计手册》（1）第6-7节第一条之规定。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]