[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1021799":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1021799,751,1,"单选题","一台15MVA双绕组高压厂用变压器，短路阻抗在制造上的误差为+5%和一10%,短路阻抗电压为10.5%,取基准容量Sj=1OOMVA,已知发电机出口电压为20kV,发电机出口三相短路电流周期分量的起始值为120k A，参加反馈的6kV电动机额定功率为18000kW,电动机的平均反馈电流倍数为6，髙压电动机的平均ηcosψ取0.8。 发电机出口的短路容量为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","4156.9MVA；",false,{"key":16,"text":17,"correct":14},"B","4572.6MVA；",{"key":19,"text":20,"correct":21},"C","4364.8MVA；",true,{"key":23,"text":24,"correct":14},"D","3949.1MVA。","",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]