[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-75-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":733},{"id":5,"name":6,"category":7,"favorite":8},75,"(高级) 建筑与房地产经济","经济金融",0,8,50,486,[13,38,53,66,81,95,110,125,139,154,169,183,198,213,227,241,255,269,284,299,313,327,342,357,371,385,399,413,427,441,455,469,483,497,512,526,540,554,569,583,597,611,621,635,649,663,677,691,705,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},141002,2,"多选题","下列关于无形资产的初始计量说法正确的有( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","可以调整自行开发的无形资产成本中以前期间已经费用化的支出",false,{"key":24,"text":25,"correct":26},"B","自行开发的无形资产，其成本包括自满足无形资产确认条件后至达到预定用途前所发生的支出总额",true,{"key":28,"text":29,"correct":22},"C","外购无形资产的成本，包括自满足无形资产确认条件后至达到预定用途前所发生的支出总额",{"key":31,"text":32,"correct":26},"D","外购无形资产的成本，包括购买价款、相关税费以及直接归属于使该项资产达到预定用途所发生的其他支出",{"key":34,"text":35,"correct":26},"E","投资者投入无形资产的成本，应当按照投资合同或协议约定的价值确定","BDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},141003,"下列建设工程项目目标控制的措施中，属于被动控制措施的有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"追踪、测试、检查项目实施过程并及时纠偏",{"key":24,"text":45,"correct":26},"明确项目管理组织过程控制人员的职责，发现情况并及时处理",{"key":28,"text":47,"correct":22},"调查并分析项目的外部环境条件，确定影响项目目标和计划实施的各种因素",{"key":31,"text":49,"correct":26},"建立有效的信息反馈系统，发现偏差并及时纠偏",{"key":34,"text":51,"correct":22},"识别风险，为项目风险分析和风险管理提供依据","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":55,"answer":36,"analysis":37},141004,[56,58,60,62,64],{"key":20,"text":57,"correct":22},"有多个终点节点",{"key":24,"text":59,"correct":26},"有多个起点节点",{"key":28,"text":61,"correct":22},"工作代号重复",{"key":31,"text":63,"correct":26},"有多余的虚工作",{"key":34,"text":65,"correct":26},"节点编号有误",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},141005,"由于业主提供的图纸有缺陷，导致工程暂停15天，则承包商可以提出索赔的内容包括( )。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"利润",{"key":24,"text":73,"correct":26},"人员窝工费",{"key":28,"text":75,"correct":26},"机械窝工费",{"key":31,"text":77,"correct":26},"增加的现场管理费",{"key":34,"text":79,"correct":26},"延误的工期","BCDE",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":52,"analysis":37},141006,"从风险控制的角度，风险可分为( )。",[85,87,89,91,93],{"key":20,"text":86,"correct":26},"不可避免又无法弥补损失的风险",{"key":24,"text":88,"correct":26},"可避免或可转移的风险",{"key":28,"text":90,"correct":22},"可避免但不可转移的风险",{"key":31,"text":92,"correct":26},"有利可图的投机风险",{"key":34,"text":94,"correct":22},"不可避免但可设法弥补损失的风险",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":109,"analysis":37},141007,"安装工程保险的保险期限，以下列( )先发生者为准。",[99,101,103,105,107],{"key":20,"text":100,"correct":22},"施工单位进工地之日",{"key":24,"text":102,"correct":26},"破土动工之日",{"key":28,"text":104,"correct":26},"保险项目卸至施工地点时",{"key":31,"text":106,"correct":22},"施工招标完成之日",{"key":34,"text":108,"correct":22},"工地施工准备开始之日","BC",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},141008,"下列有关联合体参加投标的说法中，正确的有( )。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"联合体中资质等级最高的成员须提交符合要求的全套资格预审文件",{"key":24,"text":117,"correct":26},"联合体各方须具备足够的经验和能力来承担各自的工程",{"key":28,"text":119,"correct":22},"联合体各方必须以联合体名义统一参加资格预审",{"key":31,"text":121,"correct":22},"联合体一方具备承担招标工程项目要求的相应资质条件即可",{"key":34,"text":123,"correct":26},"联合体的每一位成员均须提交符合要求的全套资格预审材料","BE",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":80,"analysis":37},141009,"依法必须进行施工招标的项目，招标人应向有关行政监督部门提交招标投标情况的书面报告，其内容至少应包括( )。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"工程标底",{"key":24,"text":132,"correct":26},"招标范围",{"key":28,"text":134,"correct":26},"投标人须知",{"key":31,"text":136,"correct":26},"评标委员会的组成",{"key":34,"text":138,"correct":26},"中标结果",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},141010,"根据法律规定，下列可以质押的权利包括( )。",[143,145,147,149,151],{"key":20,"text":144,"correct":26},"汇票",{"key":24,"text":146,"correct":26},"支票",{"key":28,"text":148,"correct":26},"提单",{"key":31,"text":150,"correct":22},"各种股份、股票",{"key":34,"text":152,"correct":26},"依法可以转让的专利权","ABCE",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},141011,"下列风险管理的工作中，属于风险分析必不可少的工作有( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":26},"采集数据",{"key":24,"text":161,"correct":26},"完成不确定性模型",{"key":28,"text":163,"correct":22},"风险分类",{"key":31,"text":165,"correct":22},"建立风险目录",{"key":34,"text":167,"correct":26},"评定风险影响","ABE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":52,"analysis":37},141012,"编制分部分项工程的投标报价时，分部分项工程预算单价应考虑的因素有( )。",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"人工工资",{"key":24,"text":176,"correct":26},"材料消耗量",{"key":28,"text":178,"correct":22},"各种管理费用",{"key":31,"text":180,"correct":26},"机械台班消耗量",{"key":34,"text":182,"correct":22},"利润和税金",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},141013,"环境影响评价文件，包括环境影响( )。",[187,189,191,193,195],{"key":20,"text":188,"correct":26},"报告书",{"key":24,"text":190,"correct":26},"报告表",{"key":28,"text":192,"correct":26},"登记表",{"key":31,"text":194,"correct":22},"测评报告",{"key":34,"text":196,"correct":22},"鉴定意见","ABC",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},141014,"工程竣工结算办理依据包括( )。",[202,204,206,208,210],{"key":20,"text":203,"correct":26},"建设工程工程量清单计价规范",{"key":24,"text":205,"correct":26},"工程合同",{"key":28,"text":207,"correct":26},"发承包双方实施过程中已确认的工程量及其结算的合同价款",{"key":31,"text":209,"correct":26},"建设工程设计文件及相关资料",{"key":34,"text":211,"correct":22},"初步设计","ABCD",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":109,"analysis":37},141015,"工程网络计划的计划工期的确定方法是( )。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"已规定要求工期时，计划工期总是小于要求工期",{"key":24,"text":220,"correct":26},"未规定要求工期时，计划工期等于计算工期",{"key":28,"text":222,"correct":26},"已规定要求工期时，计划工期不超过要求工期",{"key":31,"text":224,"correct":22},"未规定要求工期时，计划工期小于计算工期",{"key":34,"text":226,"correct":22},"已规定要求工期时，计划工期总是等于要求工期",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":52,"analysis":37},141016,"下列有关网络计划中工作最早完成时间的说法中，正确的有( )。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"工作最早完成时间等于本工作的最早开始时间加上其持续时间",{"key":24,"text":234,"correct":26},"工作最早完成时间可从网络计划的起点向终点方向依次进行计算",{"key":28,"text":236,"correct":22},"工作最早完成时间是指各先行工作完成后，本工作必须完成的时间",{"key":31,"text":238,"correct":26},"工作最早完成时间是指各紧前工作全部完成后，本工作有可能完成的最早时间",{"key":34,"text":240,"correct":22},"工作最早完成时间是指不影响总工期的前提下，工作必须完成的最早时间",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":197,"analysis":37},141017,"建设工程质量全方位控制应( )。",[245,247,249,251,253],{"key":20,"text":246,"correct":26},"对建设工程所有工程内容的质量进行控制",{"key":24,"text":248,"correct":26},"对建设工程质量目标的所有内容进行控制",{"key":28,"text":250,"correct":26},"对影响建设工程质量目标的所有因素进行控制",{"key":31,"text":252,"correct":22},"确保建设工程质量目标的最优实现",{"key":34,"text":254,"correct":22},"充分发挥质量控制对投资目标和进度目标的积极作用",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":212,"analysis":37},141018,"下列属于建设工程施工合同的特点的是( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":26},"合同标的的特殊性",{"key":24,"text":262,"correct":26},"合同履行期限的长期性",{"key":28,"text":264,"correct":26},"合同风险较大",{"key":31,"text":266,"correct":26},"合同内容复杂",{"key":34,"text":268,"correct":22},"建设工程施工合同涉及面有限",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},141019,"某建设项目，当基准收益率为10%时，净现值为2450万元；当基准收益率为18%时，净现值为-268万元。该建设项目的业主要求的收益能力为15%，则该建设项目( )。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"内部收益率为12.35%",{"key":24,"text":276,"correct":26},"内部收益率为17.21%",{"key":28,"text":278,"correct":26},"净现值大于零",{"key":31,"text":280,"correct":26},"可行",{"key":34,"text":282,"correct":22},"不可行","BCD",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},141020,"某建筑施工企业全年的营业收入分为工程价款收入和建筑材料销售收入两部分。该企业当年亏损，则当年需实际缴纳的税种有( )。",[288,290,292,294,296],{"key":20,"text":289,"correct":26},"营业税",{"key":24,"text":291,"correct":26},"增值税",{"key":28,"text":293,"correct":22},"企业所得税",{"key":31,"text":295,"correct":26},"城市维护建设税",{"key":34,"text":297,"correct":26},"教育费附加","ABDE",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":109,"analysis":37},141021,"衡量风险时应考虑的因素有( )。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"风险的种类",{"key":24,"text":306,"correct":26},"损失发生的频率",{"key":28,"text":308,"correct":26},"损失的严重性",{"key":31,"text":310,"correct":22},"风险分布",{"key":34,"text":312,"correct":22},"风险预测图",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":80,"analysis":37},141022,"国民经济评价中的经济参数有( )。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"官方汇率",{"key":24,"text":320,"correct":26},"影子价格",{"key":28,"text":322,"correct":26},"影子汇率",{"key":31,"text":324,"correct":26},"社会折现率",{"key":34,"text":326,"correct":26},"影子工资",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":341,"analysis":37},141023,"在招标人自行组织工程项目招标工作时，招标人必须有( )。",[331,333,335,337,339],{"key":20,"text":332,"correct":26},"编制招标文件的能力",{"key":24,"text":334,"correct":22},"评标专家库",{"key":28,"text":336,"correct":26},"组织评标的能力",{"key":31,"text":338,"correct":26},"从事同类工程建设项目招标的经验",{"key":34,"text":340,"correct":22},"施工组织机构","ACD",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":356,"analysis":37},141024,"构成合同关系的要素包括( )。",[346,348,350,352,354],{"key":20,"text":347,"correct":26},"主体",{"key":24,"text":349,"correct":22},"形式",{"key":28,"text":351,"correct":22},"文本",{"key":31,"text":353,"correct":26},"客体",{"key":34,"text":355,"correct":26},"内容","ADE",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":153,"analysis":37},141025,"项目监理机构在实施监理过程中，发现工程存在安全隐患时，下列说法正确的有( )。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"签发监理通知单并要求施工单位整改",{"key":24,"text":364,"correct":26},"情况严重时，应签发工程暂停令，并应及时报告建设单位",{"key":28,"text":366,"correct":26},"施工单位拒不整改或不停工时，项目监理机构应及时向有关主管部门报送监理报告",{"key":31,"text":368,"correct":22},"在紧急情况下，项目监理机构通过电话、传真或者电子邮件向有关主管报告的，不必形成监理报告",{"key":34,"text":370,"correct":26},"项目监理机构的监理报告的填写是有相应的要求的",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":52,"analysis":37},141026,"下列建设工程实施过程发生的事件中，属于业主或投资者风险的有( )。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"资金筹措无门",{"key":24,"text":378,"correct":26},"投资回收期长",{"key":28,"text":380,"correct":22},"由于承包商技术错误造成的直接损失",{"key":31,"text":382,"correct":26},"工程所在国发生全国性罢工",{"key":34,"text":384,"correct":22},"承包商克扣工人工资，引起公愤导致群体行为",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":298,"analysis":37},141027,"控制损失通常可采用的办法包括( )。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"预防危险源的产生",{"key":24,"text":392,"correct":26},"减少构成危险的数量因素",{"key":28,"text":394,"correct":22},"预防尚未存在的危险的扩散",{"key":31,"text":396,"correct":26},"改变危险的有关基本特征",{"key":34,"text":398,"correct":26},"稳定、更新遭受损害的物体",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":52,"analysis":37},141028,"意外伤害保险的保险责任的条件包括( )。",[403,405,407,409,411],{"key":20,"text":404,"correct":26},"被保险人在保险期限内遭受了意外伤害",{"key":24,"text":406,"correct":26},"被保险人在责任期限内死亡或残疾",{"key":28,"text":408,"correct":22},"被保险人在保险限期内自杀或自残",{"key":31,"text":410,"correct":26},"被保险人所受意外伤害是其死亡或残疾的直接原因或近因",{"key":34,"text":412,"correct":22},"被保险人在保险期内毁坏文件",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":168,"analysis":37},141029,"关于施工合同的履约保证，下列说法正确的有( )。",[417,419,421,423,425],{"key":20,"text":418,"correct":26},"招标文件要求中标人提交履约保证金的，中标人应当提供",{"key":24,"text":420,"correct":26},"履约保函或者保证书是承包人通过银行或者担保公司向发包人开具的保证，在合同执行期间按合同规定履行其义务的经济担保书",{"key":28,"text":422,"correct":22},"履约担保的方式可以是提交一定数额的履约保证金，但不包括第三人的信用担保",{"key":31,"text":424,"correct":22},"承包人破产或倒闭的，发包人无权凭履约保证向银行或者担保公司索取保证金作为赔偿",{"key":34,"text":426,"correct":26},"履约保证的有效期限从提交履约保证起，到项目竣工并验收合格止",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":197,"analysis":37},141030,"在投资估算与概算中，基本预备费的计算基数应包括( )。",[431,433,435,437,439],{"key":20,"text":432,"correct":26},"设备及工器具购置费",{"key":24,"text":434,"correct":26},"建筑安装工程费用",{"key":28,"text":436,"correct":26},"工程建设其他费用",{"key":31,"text":438,"correct":22},"建设期贷款利息",{"key":34,"text":440,"correct":22},"固定资产投资方向调节税",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":212,"analysis":37},141031,"施工企业成本费用核算应遵循的原则有( )。",[445,447,449,451,453],{"key":20,"text":446,"correct":26},"严格遵循成本费用开支范围，正确划分应否计入直接工程费和间接费的界限",{"key":24,"text":448,"correct":26},"正确划分直接工程费和间接费的界限",{"key":28,"text":450,"correct":26},"正确划分各月份的费用界限",{"key":31,"text":452,"correct":26},"正确划分各项工程的费用界限",{"key":34,"text":454,"correct":22},"正确划分施工单位与上级组织的界限",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":212,"analysis":37},141032,"索赔费用的组成要素一般应包括( )。",[459,461,463,465,467],{"key":20,"text":460,"correct":26},"人工费、材料费",{"key":24,"text":462,"correct":26},"施工现场管理费",{"key":28,"text":464,"correct":26},"利息和利润",{"key":31,"text":466,"correct":26},"分包费、总部管理费",{"key":34,"text":468,"correct":22},"不可抗力导致的施工机具损坏费",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":341,"analysis":37},141033,"国内现行价格是指现行商品价格的收费标准，包括( )等价格形式。",[473,475,477,479,481],{"key":20,"text":474,"correct":26},"国家定价",{"key":24,"text":476,"correct":22},"协议价格",{"key":28,"text":478,"correct":26},"市场价格",{"key":31,"text":480,"correct":26},"国家指导价",{"key":34,"text":482,"correct":22},"企业定价",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":298,"analysis":37},141034,"在下列( )情形下，项目从经济资源配置的角度考虑可以接受。",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"经济净现值等于0",{"key":24,"text":490,"correct":26},"经济净现值大于0",{"key":28,"text":492,"correct":22},"经济内部收益率小于社会折现率",{"key":31,"text":494,"correct":26},"经济内部收益率大于社会折现率",{"key":34,"text":496,"correct":26},"经济效益费用比大于1",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":511,"analysis":37},141035,"下列关于预付备料款的说法正确的有( )。",[501,503,505,507,509],{"key":20,"text":502,"correct":26},"备料款要随着工程中所需主要材料储备的逐步减少而逐渐扣回",{"key":24,"text":504,"correct":22},"备料款对施工方而言是预付款",{"key":28,"text":506,"correct":26},"预付备料款限额与主要材料在工程中所占比重成正比",{"key":31,"text":508,"correct":22},"建筑工程一般按年计划施工产值的10%左右拨付",{"key":34,"text":510,"correct":26},"备料款对业主方而言是预付款","ACE",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":356,"analysis":37},141036,"建设工程质量控制应避免不断提高质量目标的倾向，要避免这种倾向，应( )。",[516,518,520,522,524],{"key":20,"text":517,"correct":26},"对目标有理性的认识",{"key":24,"text":519,"correct":22},"追求“最新”、“最高”、“最好”的目标",{"key":28,"text":521,"correct":22},"对投资太大的工程放弃不建",{"key":31,"text":523,"correct":26},"在工程建设早期要有前瞻性的确定质量目标",{"key":34,"text":525,"correct":26},"定量分析提高质量目标后对投资目标和进度目标的影响",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":36,"analysis":37},141037,"当某工程网络计划的计算工期等于计划工期时，关于网络计划的说法，正确的有( )。",[530,532,534,536,538],{"key":20,"text":531,"correct":22},"工作自由时差为零，总时差必定为零",{"key":24,"text":533,"correct":26},"工作总时差为零，自由时差必定为零",{"key":28,"text":535,"correct":22},"在不影响总工期的前提下，工作的机动时间为其自由时差",{"key":31,"text":537,"correct":26},"在不影响总工期的前提下，工作的机动时间为其总时差",{"key":34,"text":539,"correct":26},"关键工作的最早开始时间与最迟开始时间相等",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":212,"analysis":37},141038,"保证合同的内容包括( )。",[544,546,548,550,552],{"key":20,"text":545,"correct":26},"保证的期间",{"key":24,"text":547,"correct":26},"保证的方式",{"key":28,"text":549,"correct":26},"被保证的主债权数额",{"key":31,"text":551,"correct":26},"保证担保的范围",{"key":34,"text":553,"correct":22},"保证人的资历",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":568,"analysis":37},141039,"下列费用应列入施工企业制造费用的有( )。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"直接材料费",{"key":24,"text":561,"correct":22},"直接工资",{"key":28,"text":563,"correct":26},"劳动保护费",{"key":31,"text":565,"correct":26},"固定资产折旧费",{"key":34,"text":567,"correct":22},"营业费用","CD",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":36,"analysis":37},141040,"工程合同管理工作极为复杂，其原因不包括( )。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"工程合同内容极为详细",{"key":24,"text":576,"correct":26},"工程体积庞大、结构复杂",{"key":28,"text":578,"correct":22},"工程合同条件过于单一",{"key":31,"text":580,"correct":26},"技术标准和质量标准要求很高",{"key":34,"text":582,"correct":26},"资金来源渠道多，有许多融资方式和承包方式",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":168,"analysis":37},141041,"在进行费用效果分析时，采用的基本方法包括( )。",[587,589,591,593,595],{"key":20,"text":588,"correct":26},"最小费用法",{"key":24,"text":590,"correct":26},"最大效果法",{"key":28,"text":592,"correct":22},"加权平均法",{"key":31,"text":594,"correct":22},"差额分析法",{"key":34,"text":596,"correct":26},"增量分析法",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":356,"analysis":37},141042,"下列有关工程建设项目招标投标的说法中，正确的是( )。",[601,603,605,607,609],{"key":20,"text":602,"correct":26},"招标投标是工程建设项目发包与承包的一种方式",{"key":24,"text":604,"correct":22},"招标人只能向一定数量的特定承包人发出招标邀请",{"key":28,"text":606,"correct":22},"招标人只能通过发布招标公告发出招标信息",{"key":31,"text":608,"correct":26},"招标的目的是择优选定中标者并与之签订合同",{"key":34,"text":610,"correct":26},"投标人必须以书面形式提交投标文件",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":341,"analysis":37},141043,"计入建筑安装工程费用中的税金包括( )。",[615,616,617,618,619],{"key":20,"text":289,"correct":26},{"key":24,"text":293,"correct":22},{"key":28,"text":295,"correct":26},{"key":31,"text":297,"correct":26},{"key":34,"text":620,"correct":22},"土地增值税",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":36,"analysis":37},141044,"工程造价的有效控制应遵循的原则有( )。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"以投资决策阶段为重点进行全过程造价控制",{"key":24,"text":628,"correct":26},"主动控制",{"key":28,"text":630,"correct":22},"被动控制",{"key":31,"text":632,"correct":26},"令人满意",{"key":34,"text":634,"correct":26},"技术和经济相结合",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":283,"analysis":37},141045,"价值工程实施程序包括( )阶段。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"产品市场价值分析",{"key":24,"text":642,"correct":26},"功能定义",{"key":28,"text":644,"correct":26},"功能评价",{"key":31,"text":646,"correct":26},"制定改进方案",{"key":34,"text":648,"correct":22},"产品质量测试",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":356,"analysis":37},141046,"下列关于资金时间价值产生原因的说法中，正确的有( )。",[653,655,657,659,661],{"key":20,"text":654,"correct":26},"物价膨胀、货币贬值",{"key":24,"text":656,"correct":22},"利润的产生需要时间",{"key":28,"text":658,"correct":22},"时间与利润成正比",{"key":31,"text":660,"correct":26},"资金运动、货币增值",{"key":34,"text":662,"correct":26},"风险的存在",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":197,"analysis":37},141047,"对建设工程监理职业责任保险而言，相对责任免除包括( )。",[667,669,671,673,675],{"key":20,"text":668,"correct":26},"文件、图纸或其他资料的损毁、灭失",{"key":24,"text":670,"correct":26},"由于合法监理分包商的行为导致的向被保险人(总包)的索赔",{"key":28,"text":672,"correct":26},"交叉责任",{"key":31,"text":674,"correct":22},"不可抗力",{"key":34,"text":676,"correct":22},"他人的责任",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":109,"analysis":37},141048,"下列折旧方法中，前期计提折旧额多，而后期计提折旧额少的有( )。",[681,683,685,687,689],{"key":20,"text":682,"correct":22},"平均年限法",{"key":24,"text":684,"correct":26},"双倍余额递减法",{"key":28,"text":686,"correct":26},"年数总和法",{"key":31,"text":688,"correct":22},"工作量法",{"key":34,"text":690,"correct":22},"五五摊销法",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":36,"analysis":37},141049,"监理工程师在施工阶段进度控制的工作有( )。",[695,697,699,701,703],{"key":20,"text":696,"correct":22},"对建设工程进度分目标进行论证",{"key":24,"text":698,"correct":26},"完善建设工程控制性施工进度计划",{"key":28,"text":700,"correct":22},"编制承包方材料和设备采购计划",{"key":31,"text":702,"correct":26},"研究制定预防工期索赔的措施",{"key":34,"text":704,"correct":26},"做好对人力、材料、机具、设备等的投入控制工作",{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":298,"analysis":37},141050,"要约的有效条件包括( )。",[709,711,713,715,717],{"key":20,"text":710,"correct":26},"内容必须具体确定",{"key":24,"text":712,"correct":26},"要约必须送达到受要约人",{"key":28,"text":714,"correct":22},"受要约人应充分表示具有订立合同的意图",{"key":31,"text":716,"correct":26},"由具有订约能力的特定人做出的意思表示",{"key":34,"text":718,"correct":26},"要约必须向要约人希望与之缔结合同的受要约人发出",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":197,"analysis":37},141051,"依据方案之间的相互联系，投资方案的类型有( )。",[723,725,727,729,731],{"key":20,"text":724,"correct":26},"独立方案",{"key":24,"text":726,"correct":26},"互斥方案",{"key":28,"text":728,"correct":26},"混合方案",{"key":31,"text":730,"correct":22},"交叉方案",{"key":34,"text":732,"correct":22},"组合方案",[734,738,741,744,747,749],{"id":735,"name":736,"category":7,"favorite":737},109,"发布证券研究报告业务",1,{"id":739,"name":740,"category":7,"favorite":8},30,"经济师",{"id":742,"name":743,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":745,"name":746,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":748,"category":7,"favorite":8},"(初级)保险专业",{"id":750,"name":751,"category":7,"favorite":8},51,"(初级)财政税收"]