[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141129":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},141129,75,1,"单选题","经有关部门批准的总概算，即为控制拟建项目工程造价的( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","最低限额",false,{"key":16,"text":17,"correct":14},"B","最高控制价",{"key":19,"text":20,"correct":14},"C","最低控制价",{"key":22,"text":23,"correct":24},"D","最高限额",true,"在初步设计阶段，根据有关概算定额或概算指标编制建设项目总概算。经有关部门批准的总概算，即为控制拟建项目工程造价的最高限额。对在初步设计阶段实行建设项目招标承包制签订承包合同协议的，其合同价也应在总概算相应的范围以内。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 建筑与房地产经济","经济金融",0]