[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141089":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},141089,75,2,"多选题","",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工作B",true,{"key":16,"text":17,"correct":18},"B","工作C",false,{"key":20,"text":21,"correct":14},"C","工作D",{"key":23,"text":24,"correct":14},"D","工作E",{"key":26,"text":27,"correct":18},"E","工作G","ACD","在单代号网络计划中，工作总时差最小的工作是关键工作。从起点节点开始到终点节点均为关键工作，且所有工作之间的时间间隔均为零的线路为关键线路。经计算可知工作A、B、C、D、E、F、G的总时差分别为0、0、2、0、0、1、0，因此总时差最小的工作A、B、D、E、F为关键工作，且关键工作之间的时间间隔均为零，因此，A-B-D-E-F为一条关键线路，位于其上的节点工作均为关键工作。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]