[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141065":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},141065,75,2,"多选题","编制工程量清单的主要依据包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程量清单计价规范",true,{"key":16,"text":17,"correct":14},"B","招标文件",{"key":19,"text":20,"correct":14},"C","建设工程设计文件",{"key":22,"text":23,"correct":14},"D","常规施工方案",{"key":25,"text":26,"correct":27},"E","监理单位建议",false,"ABCD","编制工程量清单的主要依据如下：①工程量清单计价规范；②国家或省级、行业建设主管部门颁发的计价依据和办法；③建设工程设计文件；④与建设工程项目有关的标准、规范、技术资料；⑤招标文件及其补充通知、答疑纪要；⑥施工现场情况、工程特点及常规施工方案；⑦其他相关材料。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]