[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141017":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},141017,75,2,"多选题","建设工程质量全方位控制应( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","对建设工程所有工程内容的质量进行控制",true,{"key":16,"text":17,"correct":14},"B","对建设工程质量目标的所有内容进行控制",{"key":19,"text":20,"correct":14},"C","对影响建设工程质量目标的所有因素进行控制",{"key":22,"text":23,"correct":24},"D","确保建设工程质量目标的最优实现",false,{"key":26,"text":27,"correct":24},"E","充分发挥质量控制对投资目标和进度目标的积极作用","ABC","对建设工程的进度目标进行全方位控制主要表现为：①对建设工程所有工程内容的质量进行控制；②对建设工程质量目标的所有内容进行控制；③对影响建设工程质量目标的所有因素进行控制。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]