[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141014":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},141014,75,2,"多选题","工程竣工结算办理依据包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","建设工程工程量清单计价规范",true,{"key":16,"text":17,"correct":14},"B","工程合同",{"key":19,"text":20,"correct":14},"C","发承包双方实施过程中已确认的工程量及其结算的合同价款",{"key":22,"text":23,"correct":14},"D","建设工程设计文件及相关资料",{"key":25,"text":26,"correct":27},"E","初步设计",false,"ABCD","工程竣工结算办理依据包括：①建设工程工程量清单计价规范；②工程合同；③发承包双方实施过程中已确认的工程量及其结算的合同价款；④发承包双方实施过程中已确认调整后追加(减)的合同价款；⑤建设工程设计文件及相关资料；⑥投标文件；⑦其他依据。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]