[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141012":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},141012,75,2,"多选题","编制分部分项工程的投标报价时，分部分项工程预算单价应考虑的因素有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","人工工资",true,{"key":16,"text":17,"correct":14},"B","材料消耗量",{"key":19,"text":20,"correct":21},"C","各种管理费用",false,{"key":23,"text":24,"correct":14},"D","机械台班消耗量",{"key":26,"text":27,"correct":21},"E","利润和税金","ABD","编制分部分项工程的投标报价时，分部分项工程预算单价的确定即直接费的水平决定于基础单价和人工、材料、施工机械台班消耗量等因素。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]