[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140929":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},140929,75,1,"单选题","能够解决工程项目传统控制过程中存在的时滞影响，并降低偏差发生的概率及其严重程度，这类控制称为( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","反馈控制",false,{"key":16,"text":17,"correct":14},"B","事中控制",{"key":19,"text":20,"correct":21},"C","主动控制",true,{"key":23,"text":24,"correct":14},"D","被动控制","主动控制是一种面对未来的控制，它可以解决传统控制过程中存在的时滞影响，尽最大可能避免偏差已经成为现实的被动局面，降低偏差发生的概率及其严重程度，从而使控制更为有效。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 建筑与房地产经济","经济金融",0]