[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140917":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},140917,75,1,"单选题","建设工程项目监理机构人员配备应具有合理的结构，主要是指具有合理的( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","组织结构",false,{"key":16,"text":17,"correct":14},"B","管理层次与管理强度",{"key":19,"text":20,"correct":14},"C","部门和岗位职责",{"key":22,"text":23,"correct":24},"D","专业和技术职务、职称结构",true,"项目监理机构应具有合理的人员结构，包括以下两方面的内容：①合理的专业结构。即参与项目监理的各专业人员应配套。②合理的技术职务、职称结构。表现在高级、中级和初级职称与监理工作要求相称的比例。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 建筑与房地产经济","经济金融",0]