[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140818":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},140818,75,2,"多选题","基于BIM技术的施工方案模拟内容有（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","投标方案模拟",true,{"key":16,"text":17,"correct":14},"B","现场布置模拟",{"key":19,"text":20,"correct":14},"C","垂直运输模拟",{"key":22,"text":23,"correct":14},"D","专业分包协调模拟",{"key":25,"text":26,"correct":27},"E","施工工艺模拟",false,"ABCD","本题考查BIM技术的施工方案模拟的内容。 包括投标方案模拟、现场布置模拟、 垂直运输模拟、专业分包协调模拟。 E选项为混淆选项。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]