[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140817":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},140817,75,2,"多选题","基于BIM技术应用总体流程有（ ）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","设计阶段",true,{"key":16,"text":17,"correct":14},"B","招投标阶段",{"key":19,"text":20,"correct":14},"C","施工阶段",{"key":22,"text":23,"correct":14},"D","竣工阶段",{"key":25,"text":26,"correct":27},"E","运维阶段",false,"ABCD","本题考查的是BIM技术应用总体流程。 基于BIM技术应用总体流程有设计阶段、招投标阶段、施工阶段、竣工阶段。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]