[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140686":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},140686,75,2,"多选题","建设项目可行性研究可分为( )阶段。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","机会研究",true,{"key":16,"text":17,"correct":14},"B","初步可行性研究",{"key":19,"text":20,"correct":21},"C","项目建议书",false,{"key":23,"text":24,"correct":14},"D","最终可行性研究",{"key":26,"text":27,"correct":14},"E","项目的评估和决策","ABDE","本题考查的是建设项目可行性研究的阶段和内容。 建设项目可行性研究可分为：机会研究、初步可行性研究、最终可行性研究和项目的评估和决策。所以ABDE均正确。 C为混淆选项。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 建筑与房地产经济","经济金融",0]