[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1017273":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1017273,742,1,"单选题","尾矿库使用到最终设计高程前（ ）年，应进行闭库设计，当需要扩建或新建尾矿库接续生产时，应根据建设周期提前制定扩建或新建尾矿库的规划设计工作，确保新老库使用的衔接。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",true,{"key":16,"text":17,"correct":18},"B","2",false,{"key":20,"text":21,"correct":18},"C","3",{"key":23,"text":24,"correct":18},"D","4","《尾矿库安全监督管理规定》第二十九条，尾矿库运行到设计最终标高的前12个月内，生产经营单位应当进行闭库前的安全现状评价和闭库设计，闭库设计应当包括安全设施设计。闭库安全设施设计应当经有关安全生产监督管理部门审查批准。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-金属非金属矿山安全","建筑工程",0]