[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1016945":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1016945,742,1,"单选题","尾矿库排洪构筑物( )必须严格按设计要求及时封堵，并确保施工质量。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","使用前",false,{"key":16,"text":17,"correct":14},"B","使用时",{"key":19,"text":20,"correct":21},"C","停用后",true,{"key":23,"text":24,"correct":14},"D","使用后","《尾矿库安全技术规程》(AQ2006)中第6．4．8款规定，尾矿库排水构筑物停用后，必须严格按设计要求及时封堵，并确保施工质量。严禁在排水井井筒顶部封堵。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-金属非金属矿山安全","建筑工程",0]