[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1016911":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1016911,742,1,"单选题","尾矿库的调洪库容是指某坝顶标高时，最高沉积滩面、库底、正常水位三者以上，( )以下的空间。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","库顶面",false,{"key":16,"text":17,"correct":18},"B","最高洪水位",true,{"key":20,"text":21,"correct":14},"C","沉积体表层",{"key":23,"text":24,"correct":14},"D","设计洪水位","调洪库容指某坝顶标高时，最高沉积滩面、库底、正常水位三者 以上，最高洪水位以下的空间。它是在暴雨期间用以调节洪水的库容，是设计 确保最高洪水位不致超过设计洪水位水平面所需的库容。因此该库容在非雨季 可占用，而雨季绝对不允许占用。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-金属非金属矿山安全","建筑工程",0]