[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140614":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},140614,74,2,"多选题","关于项目组合评估的项目地图法的说法，错误的有（）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","珍珠型项目具有较高的预期收益和成功概率",false,{"key":16,"text":17,"correct":18},"B","牡蛎型项目具有较高的成功概率，但潜在收益较低",true,{"key":20,"text":21,"correct":18},"C","白象型项目具有较高的预期收益，但成功概率较低",{"key":23,"text":24,"correct":18},"D","面包和黄油型项目成功概率低，但预期收益较高",{"key":26,"text":27,"correct":14},"E","对于白象型项目，企业应终止或排除","BCD","本题考查的是：项目地图法中风险-收益气泡图四个区域的特点。 B选项，牡蛎型，具有较高的潜在收益，较低的技术开发成功的可能性，故错误； C选项，白象型，具有较低的预期收益和成功概率，故错误； D选项，面包和黄油型，具有较低的预期收益，较高的成功概率，故错误。",{"id":6,"name":31,"category":32,"favorite":33},"(高级) 工商管理","经济金融",0]