[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-140323":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},140323,74,1,"单选题","某公司正考虑建设一个新项目。根据市场调查和财务部门测算，项目周期为5年，项目现金流量已估算完毕，公司选择的贴现率为10%，具体数据参见项目现金流量表及现值系数表。 表9-5 项目现金流量表 万元 表9-6 现值系数表 该项目的净现值是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","185.85",false,{"key":16,"text":17,"correct":18},"B","254.30",true,{"key":20,"text":21,"correct":14},"C","265.50",{"key":23,"text":24,"correct":14},"D","282.25","净现值（NPV）是指投资项目投入使用后的净现金流量，按资本成本或企业要求达到的报酬率折算为现值，加总后减去初始投资以后的余额。则该项目的净现值＝400×3.17＋300×0.621－1200＝254.30（万元）。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 工商管理","经济金融",0]