[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-139807":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},139807,74,1,"单选题","进度控制的第一环节是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投入进度控制",true,{"key":16,"text":17,"correct":18},"B","工序进度控制",false,{"key":20,"text":21,"correct":18},"C","出产进度控制",{"key":23,"text":24,"correct":18},"D","销售进度控制","生产进度控制包括投入进度控制、工序进度控制和出产产出进度控制。其中，投入进度控制是进度控制第一环节，是指在产品生产中对产成品的投入日期、数量，及对原材料、零部件投入提前期的控制。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 工商管理","经济金融",0]