[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-139781":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},139781,74,1,"单选题","在影响企业生产能力的各种因素中，（ ）是计划期内用于生产的全部机器设备的数量、厂房和其他生产用建筑面积。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","固定资产的生产效率",false,{"key":16,"text":17,"correct":14},"B","固定资产的工作时间",{"key":19,"text":20,"correct":21},"C","固定资产数量",true,{"key":23,"text":24,"correct":14},"D","固定资产所能生产的最大数量","固定资产的数量是指计划期内用于生产的全部机器设备的数量、厂房和其他生产性建筑的面积。设备的数量应包括正在运转的和正在检修、安装或准备检修的设备，也包括因暂时没有任务而停用的设备，但不包括已报废的、不配套的、封存待调的设备和企业备用的设备。生产面积中包括企业厂房和其他生产用建筑物的面积。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 工商管理","经济金融",0]