[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-739-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},739,"安全实务-建筑施工安全","建筑工程",0,7,50,791,[13,34,46,58,66,77,85,97,109,121,129,141,153,165,177,189,201,213,223,232,244,256,268,280,292,304,316,328,338,350,362,374,386,398,410,422,434,446,458,470,482,494,503,515,527,539,551,563,572,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1013354,1,"单选题","下列关于模板设计计算的要求中，正确的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","钢模板及其支撑其界面塑性发展系数取2．0",false,{"key":24,"text":25,"correct":22},"B","受压立杆梢径不得小于20mm",{"key":27,"text":28,"correct":22},"C","钢杆件受拉构件长细比不应大于250",{"key":30,"text":31,"correct":32},"D","木杆件受拉构件长细比不应大于250",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1013355,"不属于城市轨道交通特点的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"安全性好",{"key":24,"text":41,"correct":22},"防空好",{"key":27,"text":43,"correct":32},"运量小",{"key":30,"text":45,"correct":22},"速度快",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1013357,"目前地铁车站施工的主要工法有明挖法、暗挖法、盖挖法及这几种方法的组合与变化形式，如遇到浅埋车站，征占地较容易，可使用的空间比较大，周边环境简单的环境时，可采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"明挖法",{"key":24,"text":53,"correct":22},"盖挖法",{"key":27,"text":55,"correct":22},"暗挖法",{"key":30,"text":57,"correct":22},"盾构法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1013359,"目前地铁车站施工的主要工法有明挖法、暗挖法、盖挖法及盾构法。充分利用围岩的自承作用，要求初期支护具有一定刚度，以改造地质条件为前提，以控制地表沉降为重点，以格栅和喷锚作为初期支护手段，按照十八字原则进行设计和施工的施工方法，属于（ ）。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":55,"correct":32},{"key":27,"text":53,"correct":22},{"key":30,"text":57,"correct":22},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":30,"analysis":33},1013361,"我国地铁施工方法由最初单一的明挖法发展到现在的多种方法并存的施工方法。下列施工方法中，不属于地铁常用施工方法的是（ ）。",[70,72,74,75],{"key":20,"text":71,"correct":22},"明挖",{"key":24,"text":73,"correct":22},"暗挖",{"key":27,"text":57,"correct":22},{"key":30,"text":76,"correct":32},"人工法",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":27,"analysis":33},1013363,"某城市轨道工程地面建筑物密集、交通运输繁忙、地下管线密布，则其区间隧道适用的工法是（）。",[81,82,83,84],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":86,"libraryId":5,"type":15,"typeLabel":16,"stem":87,"options":88,"answer":30,"analysis":33},1013365,"下列关于盾构法施工说法错误的是（）。",[89,91,93,95],{"key":20,"text":90,"correct":22},"机械化施工程度高，进度快",{"key":24,"text":92,"correct":22},"准备困难且费用高，只有长距离掘进时才较经济",{"key":27,"text":94,"correct":22},"对环境影响较小，地下水位可保持",{"key":30,"text":96,"correct":32},"工作人员作业危险性较大，劳动强度较高",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":27,"analysis":33},1013366,"下列不属于暗挖车站工法选择原则的是（ ）。",[101,103,105,107],{"key":20,"text":102,"correct":22},"安全可行性原则",{"key":24,"text":104,"correct":22},"工期可控性原则",{"key":27,"text":106,"correct":32},"整体可靠性原则",{"key":30,"text":108,"correct":22},"经济合理性原则",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":27,"analysis":33},1013368,"暗挖车站常用施工方法包括PBA法、CRD法、双侧壁导坑法、中洞法、侧洞法、柱洞法等施工方法。施工中先开挖中间部分，在中洞内施作梁、柱结构，然后再开挖两侧部分，并逐渐将侧洞顶部荷载通过中洞初期支护转移到梁、柱结构上的施工方法，属于（ ）。",[113,115,117,119],{"key":20,"text":114,"correct":22},"PBA法",{"key":24,"text":116,"correct":22},"CRD法",{"key":27,"text":118,"correct":32},"中洞法",{"key":30,"text":120,"correct":22},"侧洞法",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":30,"analysis":33},1013370,"暗挖车站常用施工方法包括PBA法、CRD法、双侧壁导坑法、中洞法、侧洞法、柱洞法等施工方法。施工中先开挖两侧部分，在侧洞内施作梁、柱结构，然后再开挖中间部分，并逐渐将中洞顶部荷载通过初期支护转移到梁、柱结构上的施工方法．属于（ ）。",[125,126,127,128],{"key":20,"text":114,"correct":22},{"key":24,"text":116,"correct":22},{"key":27,"text":118,"correct":22},{"key":30,"text":120,"correct":32},{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},1013372,"PBA工法就是在边导洞内施工车站的边桩，在中岛洞内施工梁柱，然后在桩柱体系间进行初支和二衬扣拱，形成车站的顶部结构，并在顶部结构的保护下由上至下逆筑车站结构。PBA法具体施工流程为（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"边桩施工、柱孔开挖→导洞开挖→桩、柱顶梁施工→钢管柱吊装及灌注混凝土→底梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"key":24,"text":136,"correct":22},"边桩施工、柱孔开挖→底梁施工→导洞开挖→钢管柱吊装及灌注混凝土→桩、柱顶梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"key":27,"text":138,"correct":22},"导洞开挖→边桩施工、柱孔开挖→桩、柱顶梁施工→顶部初支及二衬扣拱→底梁施工→钢管柱吊装及灌注混凝土→站厅层施工→站台层施工",{"key":30,"text":140,"correct":32},"导洞开挖→边桩施工、柱孔开挖→底梁施工→钢管柱吊装及灌注混凝土→桩、柱顶梁施工→顶部初支及二衬扣拱→站厅层施工v站台层施工",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},1013374,"下列关于钢管柱施工相关要求的说法中，错误的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"为便于起吊，钢管柱出厂前应在管顶焊接耳片，位置约在管顶下50mm",{"key":24,"text":148,"correct":22},"耳片侧面须加焊肋板，确保在最不利位置起吊时不致侧翻破坏",{"key":27,"text":150,"correct":32},"当钢管柱底部轴线对齐后，对其进行调直时，大的偏差靠兰花口调整，由吊臂进行细致调整",{"key":30,"text":152,"correct":22},"对比较长的钢管柱做有效临时支护，尽快脱钩后再继续进行焊接工序，加快吊装速度",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1013376,"顶纵梁即钢管混凝土柱上的纵梁，也是车站主体结构的主要承载结构。纵梁底部钢板通过钢管柱顶部的预埋锚固螺栓与钢管柱连接。中洞法暗挖地铁站顶梁施工顺序为（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"芯梁部位钢筋绑扎→模板支架施工→芯梁底板预制→芯梁底板安装→顶部防水层铺设→混凝土浇筑",{"key":24,"text":160,"correct":32},"芯梁底板预制→芯梁底板安装→顶部防水层铺设→芯梁部位钢筋绑扎→模板支架施工→混凝土浇筑",{"key":27,"text":162,"correct":22},"芯梁部位钢筋绑扎→模板支架施工→芯梁底板安装→顶部防水层铺设→芯梁底板预制→混凝土浇筑",{"key":30,"text":164,"correct":22},"芯梁底板预制→顶部防水层铺设→芯梁部位钢筋绑扎→芯梁底板安装→模板支架施工→混凝土浇筑",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},1013378,"盾构法隧道施工中除一般机械设备用电和生活用电等常规用电外，盾构掘进动力系统的供电电压为（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"380V",{"key":24,"text":172,"correct":22},"1kV",{"key":27,"text":174,"correct":32},"10kV",{"key":30,"text":176,"correct":22},"35kV",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1013379,"刀盘内更换刀具也是盾构法隧道施工过程中一项相对危险的作业工序，所以在更换刀具前工具、设备及应急物品应准备齐全。下列关于更换刀具时的安全注意事项中，说法正确的是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":32},"对土舱内的气体进行检测，在保证无有毒气体的情况下才可进行刀具更换",{"key":24,"text":184,"correct":22},"电动工具需选用42V以下的安全电压",{"key":27,"text":186,"correct":22},"在地质条件比较稳定的情况下，一般采取气压换刀",{"key":30,"text":188,"correct":22},"在盾构机前方或上方的土体不能自稳的情况下，需进行常压换刀",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1013381,"盾构法隧道施工的一般用电是临时用电，电缆线必须使用三相五线电缆。盾构机采用的高压用电应符合要求。下列关于盾构机高压用电系统的要求中，说法正确的是（ ） A.盾构机动力系统掘进用电一般是采用双回路专供的电缆路专供的电缆",[193,195,197,199],{"key":20,"text":194,"correct":32},"电缆从变电站接到盾构机上面一般采用架空架设",{"key":24,"text":196,"correct":22},"高压电缆采用埋地敷设时，埋地深度不小于0．2m，电缆周围需铺50mm厚的细砂",{"key":27,"text":198,"correct":22},"随着盾构向前不断推进，高压电缆应预留足够长度，严禁使用接驳器接连",{"key":30,"text":200,"correct":22},"在隧道内轨道运输车辆必须高于电缆固定式悬挂的高度",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1013383,"暗挖地铁车站的结构形式、工程环境条件及暗挖工法三者密切相关。下列暗挖地铁车站结构形式选择原则的说法中，错误的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"在满足功能的前提下，车站的结构形式应尽量紧凑，压缩土建规模，节省造价",{"key":24,"text":208,"correct":32},"在车站客流量较大，地质条件较好，地下水可以疏干的情况下，可采用单拱单层结构形式",{"key":27,"text":210,"correct":22},"当车站客流量不大，水文地质条件好时，可采用多拱(或单拱多跨)单层结构形式",{"key":30,"text":212,"correct":22},"当车站受环境条件限制，线间距不能拉开，岛式站台宽度小于12m时，可采用双拱或单拱结构",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1013385,"下列关于盾构机高压用电系统的要求中，说法正确的是（）。",[217,219,220,222],{"key":20,"text":218,"correct":32},"盾构机动力系统掘进用电一般是采用双回路专供的电缆路专供的电缆",{"key":24,"text":194,"correct":22},{"key":27,"text":221,"correct":22},"高压电缆采用埋地敷设时，埋地深度不小于0.2m，电缆周围需铺50mm厚的细砂",{"key":30,"text":198,"correct":22},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1013387,"单拱双层式车站适用的暗挖工法是（）。",[227,229,230,231],{"key":20,"text":228,"correct":22},"柱洞法",{"key":24,"text":118,"correct":32},{"key":27,"text":114,"correct":22},{"key":30,"text":116,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},1013389,"当车站客流量不大，水文地质条件好时，暗挖地铁车站的结构形式可采用（）结构形式。",[236,238,240,242],{"key":20,"text":237,"correct":32},"多拱（或单拱多跨）单层",{"key":24,"text":239,"correct":22},"多拱双层",{"key":27,"text":241,"correct":22},"双洞分离",{"key":30,"text":243,"correct":22},"局部暗挖",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":33},1013390,"《城市轨道交通工程质量安全检查指南》（以下简称《指南》）评定划分为优良、合格、不合格三个等级。依据《指南》评分的最终得分为68分，则属于（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"优良",{"key":24,"text":251,"correct":22},"合格",{"key":27,"text":253,"correct":32},"不合格",{"key":30,"text":255,"correct":22},"差",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},1013392,"在进行城市轨道交通工程安全检查时，属于施工单位对安全防护检查内容的是（）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"基坑支护",{"key":24,"text":263,"correct":32},"安全帽",{"key":27,"text":265,"correct":22},"接零保护",{"key":30,"text":267,"correct":22},"安全技术交底",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":30,"analysis":33},1013394,"下列不属于城市轨道交通地下工程施工风险管理实施的主要阶段的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"施工准备期",{"key":24,"text":275,"correct":22},"施工期",{"key":27,"text":277,"correct":22},"车辆及机电系统安装与调试",{"key":30,"text":279,"correct":32},"验收完成正式投产",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":30,"analysis":33},1013396,"A 公司承建某市轨道交通工程，该公司依法将部分专业工程分包给具有相应资质的B 单位，并购买了建设工程一切险，该公司的做法是风险处置中的（）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"风险降低",{"key":24,"text":287,"correct":22},"风险消除",{"key":27,"text":289,"correct":22},"风险自留",{"key":30,"text":291,"correct":32},"风险转移",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},1013399,"下列属于超过一定规模的危险性较大的分部分项工程的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"开挖深度超过3 m(含3 m)的基(槽)坑的土方开挖、支护、降水工程",{"key":24,"text":299,"correct":22},"搭设高度5 m及以上的混凝土模板支撑工程",{"key":27,"text":301,"correct":32},"搭设高度24 m及以上的落地式钢管脚手架工程",{"key":30,"text":303,"correct":22},"分段架体搭设高度8 m及以上的悬挑式脚手架工程",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1013401,"论证报告是专项方案修改完善的指导意见。施工单位应当根据论证报告修改完善专项方案，并经签字后，方可组织实施。签字的人员不包括（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":32},"建设单位负责人",{"key":24,"text":311,"correct":22},"建设单位项目负责人",{"key":27,"text":313,"correct":22},"项目总监理工程师",{"key":30,"text":315,"correct":22},"施工单位技术负责人",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":30,"analysis":33},1013403,"危险性较大的分部分项工程在施工前需要编制安全专项施工方案，超过一定规模的危险性较大的分部分项工程，还需组织专家论证。下列分部分项工程中，需要专家论证的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"开挖深度为4m的基坑工程",{"key":24,"text":323,"correct":22},"搭设架体高度为20m的落地式脚手架工程",{"key":27,"text":325,"correct":22},"开挖深度为14m的人工挖孔桩工程",{"key":30,"text":327,"correct":32},"起重量350kN的起重设备安装工程",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},1013405,"超过一定规模的危险性较大分部分项工程专项方案在实施前需要签字的人不包括（ ）。",[332,333,335,337],{"key":20,"text":315,"correct":22},{"key":24,"text":334,"correct":32},"设计单位技术负责人",{"key":27,"text":336,"correct":22},"总监理工程师",{"key":30,"text":311,"correct":22},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1013407,"对于超过一定规模的危大工程，施工单位应当组织召开专家论证会对专项施工方案进行论证。专家论证的主要内容不包括（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":32},"项目可行性及环境评估报告",{"key":24,"text":345,"correct":22},"专项方案内容是否完整.可行",{"key":27,"text":347,"correct":22},"专项方案计算书和验算依据是否符合有关标准规范",{"key":30,"text":349,"correct":22},"安全施工的基本条件是否满足现场实际情况",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},1013409,"下列不属于县级以上地方人民政府住房城乡建设主管部门监督管理职责的是（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"对危大工程进行抽查",{"key":24,"text":357,"correct":32},"颁发和管理建筑施工企业安全生产许可证",{"key":27,"text":359,"correct":22},"发现危大工程存在安全隐患的，应当责令施工单位整改",{"key":30,"text":361,"correct":22},"依法给予行政处罚",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},1013410,"进行钢结构构件连接作业时，应使用梯子或其他登高设施。当钢柱或钢结构接高时，应设置操作平台。下列注意事项中，错误的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"钢结构吊装，构件宜在地面组装，安全设施应一并设置",{"key":24,"text":369,"correct":32},"吊装时，应在作业层下方设置一道密目式安全立网",{"key":27,"text":371,"correct":22},"钢结构安装施工宜在施工层搭设水平通道，水平通道两侧应设置防护栏杆，当利用钢梁作为水平通道时，应在钢梁一侧设置连续的安全绳，安全绳宜采用钢丝绳",{"key":30,"text":373,"correct":22},"当遇有6级以上强风、浓雾、沙尘暴等恶劣天气时，不得进行露天攀登或悬空高处作业",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":30,"analysis":33},1013412,"下列关于钢结构构件连接施工防触电的技术要求，说法错误的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"现场使用的电焊机，应设有机棚，并应装设相应的消防器材",{"key":24,"text":381,"correct":22},"电焊机导线应具有良好的绝缘性能，绝缘电阻不得小于0．5 mΩ，接地线接地电阻不得大于4Ω",{"key":27,"text":383,"correct":22},"电焊机的二次线应采用防水橡皮护套铜芯软电缆，电缆长度不宜大于30 m，一次线长度不宜大于5 m，应配装二次侧空载降压器",{"key":30,"text":385,"correct":32},"吊装作业使用行灯照明时，电压不得超过42 V",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1013414,"起重吊装作业前．必须编制吊装作业专项施工方案，并应进行安全技术措施交底；作业中，未经技术负责人批准，不得随意更改。起重机特种作业人员必须持特种作业资格证书上岗，严禁非起重机驾驶人员驾驶、操作起重机。下列不需取得特种作业资格证书的作业人员包括（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"司索工",{"key":24,"text":393,"correct":32},"起重机作业现场负责人",{"key":27,"text":395,"correct":22},"司机",{"key":30,"text":397,"correct":22},"信号工",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":30,"analysis":33},1013416,"吊装时根据构件的外形、中心及工艺要求选择吊点。下列不属于“十不吊”情形的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"斜拉斜吊",{"key":24,"text":405,"correct":22},"埋置在地下的电杆",{"key":27,"text":407,"correct":22},"夜间施工光线不明",{"key":30,"text":409,"correct":32},"物体棱角处有垫片",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},1013418,"下列关于钢结构构件的制作加工触电伤害事故预防安全技术的说法中，错误的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"确保三级配电，两级保护",{"key":24,"text":417,"correct":32},"每两台用电设备必须有一个专用的开关箱",{"key":27,"text":419,"correct":22},"配电箱、开关箱外形结构应能防雨、防尘",{"key":30,"text":421,"correct":22},"电缆线路应采用埋地或架空敷设．严禁沿地面明设",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1013420,"下列关于电气焊作业安全技术的说法中，错误的是（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"电焊工必须持证上岗",{"key":24,"text":429,"correct":32},"动火作业需备案",{"key":27,"text":431,"correct":22},"动火作业时，看火人必须持有效合格的灭火器材，在焊渣掉落的最下方安全距离外履职",{"key":30,"text":433,"correct":22},"合理安排施工工序，防止上方动火作业时下放可燃材料未隔离",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},1013421,"下列不属于起重吊装“十不吊”的是（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"吊物上有人不准吊",{"key":24,"text":441,"correct":22},"斜牵斜挂不准吊",{"key":27,"text":443,"correct":32},"不合格的材料不准吊",{"key":30,"text":445,"correct":22},"六级以上强风不准吊",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1013423,"钢结构构件的连接施工是钢结构施工的主要工序，施工难度大，危险种类多，容易造成的事故不包括（)",[450,452,454,456],{"key":20,"text":451,"correct":22},"高处坠落",{"key":24,"text":453,"correct":32},"坍塌",{"key":27,"text":455,"correct":22},"起重伤害",{"key":30,"text":457,"correct":22},"触电",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":27,"analysis":33},1013425,"建筑幕墙安装工程施工时，吊篮脚手架工程施工单位必须在施工前编制安全专项施工方案。下列关于吊篮施工技术要求的说法中错误的是（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"吊篮内的作业人员不应超过2人",{"key":24,"text":465,"correct":22},"吊篮内的作业人员应佩戴安全帽，系安全带",{"key":27,"text":467,"correct":32},"安全绳应固定在吊篮上的可靠位置上，安全绳不得有松散、断股、打结现象",{"key":30,"text":469,"correct":22},"下班后不得将吊篮停留在半空中，应将吊篮放至地面",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1013427,"建筑幕墙安装工程属于危险性较大的分部分项工程，且施工人员在施工过程中经常处于高空作业状态，安全风险大，在施工过程中有很多干扰安全的因素。下列关于建筑幕墙安装工程物体打击事故预防安全技术中，说法错误的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"幕墙施工时。下方均应设置警戒隔离区，防止高空坠物",{"key":24,"text":477,"correct":32},"高处作业所使用的工具和零配件等，应放在操作平台内，并严禁抛掷",{"key":27,"text":479,"correct":22},"所用材料不得随意抛掷，当有交叉作业可能时，应搭设防护棚或通道，否则不得进行交叉作业",{"key":30,"text":481,"correct":22},"幕墙材料存放应单独设置存放区，材料存放高度应满足安全要求，保证自稳角度。吊装或抬运物料时，应确保自身安全",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1013429,"脚手架作业层脚手板应铺满、铺稳、铺实，并应用安全网双层兜底，施工层以下每隔（ ）m 应用安全网封闭。",[486,488,490,492],{"key":20,"text":487,"correct":22},"5",{"key":24,"text":489,"correct":32},"10",{"key":27,"text":491,"correct":22},"15",{"key":30,"text":493,"correct":22},"20",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1013430,"下列关于建筑幕墙安装工程物体打击事故预防安全技术中，说法错误的是（）。",[498,500,501,502],{"key":20,"text":499,"correct":22},"幕墙施工时，下方均应设置警戒隔离区，防止高空坠物",{"key":24,"text":477,"correct":32},{"key":27,"text":479,"correct":22},{"key":30,"text":481,"correct":22},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1013432,"下列关于建筑幕墙安装工程高处坠落事故预防安全技术，说法错误的是（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"搭设高度24 m及以上的落地式钢管脚手架工程、附着式整体和分片提升脚手架工程、悬挑式脚手架工程、移动式操作平台工程及新型、异形脚手架工程．施工单位必须在施工前编制安全专项施工方案",{"key":24,"text":510,"correct":22},"搭设高度50 m及以上落地式钢管脚手架、提升高度l50 m及以上附着式整体和分片提升脚手架工程、架体高度20 m及以上悬挑式脚手架工程，施工单位必须组织专家对专项方案进行论证",{"key":27,"text":512,"correct":32},"作业层脚手板应铺满、铺稳、铺实，并应用安全网单层兜底，施工层以下每隔10 m应用安全网全封闭",{"key":30,"text":514,"correct":22},"脚手架沿架体外围应用密目式安全网全封闭，密目式安全网宜设置在脚手架外立杆内侧，并应与架体绑扎牢固",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":27,"analysis":33},1013434,"下列关于手持电动工具的使用过程，说法错误的是（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":22},"启动后，先空载运转，检查工具联动是否灵活",{"key":24,"text":522,"correct":22},"手持电动工具应有防护罩，操作时加力要平稳，不得用力过猛",{"key":27,"text":524,"correct":32},"作业中，发现刀具、模具损坏的，可用手触摸确定是否更换",{"key":30,"text":526,"correct":22},"机具运转时不得撒手",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":30,"analysis":33},1013436,"建筑工程施工过程中，机电设备的安装工程是高危险、事故多发的阶段，必须要有防范和杜绝安全事故发生相应的解决措施。下列关于机电安装阶段的技术要求中，说法错误的是（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"电动机械和电气照明设备拆除后，如果电线必须保留，应该将电源切断，并且将线头绝缘",{"key":24,"text":534,"correct":22},"安装吊顶内线照明线路时，不得直接在板条天棚或隔声板上行走或堆放材料",{"key":27,"text":536,"correct":22},"有触电危险的照明设施应采用36 V及以下安全电压",{"key":30,"text":538,"correct":32},"电焊工作物和金属工作台同大地相隔的时候，仅需工作台装接保护性接地",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1013438,"建筑工程施工过程中，机电安装工程占有很大的比重，而随着建筑行业的不断发展，对其技术要求也不断提高，安全风险也随之加大。下列关于机电安装工程有关消防要求的说法中，错误的是（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":22},"未经批准严禁携带易燃易爆物品进入施工现场，因施工需要购进的易燃、易爆物品必须按安全规程妥善保管",{"key":24,"text":546,"correct":32},"在施工现场吸烟，燃火作业附近有易燃、易爆物品时，应注意防火",{"key":27,"text":548,"correct":22},"电气设备的开关安全罩、火花罩、安全保护器、避雷器、接地装备等必须完好无损，电器材料连接地点之间的接触必须良好，避免产生电火花而引起燃烧",{"key":30,"text":550,"correct":22},"施工现场的安全通道不得阻塞，必须保持畅通无阻",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},1013440,"机电安装工程的机电调试阶段，应注意施工安全。下列关于机电调试阶段的要求中，错误的是（ ）",[555,557,559,561],{"key":20,"text":556,"correct":22},"试验接线应一人接线，另一人核对检查，防止误接，损坏仪器设备及损伤人员",{"key":24,"text":558,"correct":32},"如果试验时确实需要带电接线的，应做好防护措施",{"key":27,"text":560,"correct":22},"用万用表检查时，应先打好挡位，方可进行",{"key":30,"text":562,"correct":22},"所有调试人员应持证上岗，严禁无证操作",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":30,"analysis":33},1013442,"下列关于机电安装阶段的技术要求中，说法错误的是（）。",[567,568,569,571],{"key":20,"text":532,"correct":22},{"key":24,"text":534,"correct":22},{"key":27,"text":570,"correct":22},"有触电危险的照明设施应采用36V及以下安全电压",{"key":30,"text":538,"correct":32},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1013443,"下列关于机电安装工程有关消防要求的说法中，错误的是（）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"未经批准严禁携带易燃易爆物品进入施工现场，因施工需要购进的易燃易爆物品必须按安全规程妥善保管",{"key":24,"text":579,"correct":32},"在施工现场吸烟，燃火作业附近有易燃.易爆物品时，应注意防火",{"key":27,"text":581,"correct":22},"电气设备的开关安全罩.火花罩.安全保护器.避雷器.接地装备等必须完好无损",{"key":30,"text":550,"correct":22},{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":30,"analysis":33},1013445,"下列关于门式脚手架做法错误的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"在门式脚手架的顶层门架上部.连墙件设置层.防护棚设置处必须设置水平架",{"key":24,"text":590,"correct":22},"门式脚手架立杆离墙面净距不宜大于150mm",{"key":27,"text":592,"correct":22},"水平架可由挂扣式脚手板或门架两侧设置的水平加固杆代替",{"key":30,"text":594,"correct":32},"当门架搭设高度50m时，水平架应每两步一设",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]