[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-739-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},739,"安全实务-建筑施工安全","建筑工程",0,5,50,791,[13,34,46,58,70,82,92,104,116,128,140,152,164,176,188,200,212,224,236,248,260,268,280,292,304,313,325,334,346,358,370,382,392,404,416,428,440,450,462,474,486,498,510,522,534,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1013101,1,"单选题","下列关于施工安全作业的要求中，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","在挖土机工作范围内，不允许进行其他作业",true,{"key":24,"text":25,"correct":26},"B","除基坑支护设计要求允许外，基坑边10m范围内不得堆土、推料、放置机具",false,{"key":28,"text":29,"correct":26},"C","多台机械开挖．挖土机间距应大于1m",{"key":31,"text":32,"correct":26},"D","逆作法挖土应由下而上，先挖坡脚。逐层进行","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1013103,"土石方开挖宜根据支护形式分为无围护结构的放坡开挖、有围护结构物内支撑的基坑开挖及有围护结构有内支撑的基坑开挖等方式。下列有关开挖方式的说法中正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"深基坑工程中面积较大的基坑宜采用放坡挖土、逆作法挖土",{"key":24,"text":41,"correct":22},"有内支撑结构的深基坑土石方开挖，可以分为明挖法和暗挖法",{"key":28,"text":43,"correct":26},"多道内支撑基坑开挖遵循“分层支撑、分层开挖、限时支撑、先挖后撑”的原则，且分层厚度须满足设计工况要求",{"key":31,"text":45,"correct":26},"分层支撑和开挖的基坑上部可采用大型施工机械开挖，下部宜采用小型施工机械和人工挖土，在内支撑以下挖土时，每层开挖深度不得大于20m",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1013104,"采用放坡开挖的基坑，应验算基坑边坡的稳定性，边坡坡度应根据土层性质、开挖深度确定，各级边坡坡度不宜大于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"1：1．05",{"key":24,"text":53,"correct":26},"1：1．20",{"key":28,"text":55,"correct":26},"1：1．25",{"key":31,"text":57,"correct":22},"1：1．50",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1013105,"采用复合土钉支护的基坑开挖施工，基坑开挖应与土钉施工分层交替进行，应缩短无支护暴露时间。采用分层方法进行土方开挖，每层土方开挖的底标高应低于相应土钉位置，且距离不宜大于200mm，每层分段长度不应大于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"10m",{"key":24,"text":65,"correct":26},"20m",{"key":28,"text":67,"correct":22},"30m",{"key":31,"text":69,"correct":26},"40m",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1013106,"岛式土方开挖时，中部岛状土体的高度不宜大于6m。中部岛状土体高度大于规定值时，应采用二级放坡形式，每级边坡坡度不宜大于1：1．5，总边坡坡度不应大于1：2．0。应采用二级放坡形式的中部岛状土体高度大于（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"2m",{"key":24,"text":77,"correct":22},"4m",{"key":28,"text":79,"correct":26},"5m",{"key":31,"text":81,"correct":26},"6m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1013107,"盆式土方开挖时盆边土体的高度不宜大于6m，盆边上口宽度不宜小于8m。盆边土体的高度大于规定值时，应采用二级放坡形式，坡间放坡平台宽度不应小于3m。应采用二级放坡形式的盆边土体高度大于（ ）。",[86,88,89,91],{"key":20,"text":87,"correct":26},"1m",{"key":24,"text":75,"correct":26},{"key":28,"text":90,"correct":26},"3m",{"key":31,"text":77,"correct":22},{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":28,"analysis":33},1013109,"检查员发现盲炮或怀疑盲炮。应向爆破负责人报告后组织进一步及检查和处理；在上述情况下，不应发出解除警戒信号。电力起爆网路发生盲炮时，应立即切断电源，及时将盲炮电路（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":26},"开路",{"key":24,"text":99,"correct":26},"断路",{"key":28,"text":101,"correct":22},"短路",{"key":31,"text":103,"correct":26},"通电",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},1013110,"某建筑公司在进行土方开挖时，安全检查人员发现基坑变形超过报警值，则应当采取的措施不包括（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":26},"调整分层.分段土方开挖施工方案",{"key":24,"text":111,"correct":26},"加大预留土墩",{"key":28,"text":113,"correct":22},"立即停止作业，并上报监理单位.建设单位和县级以上安全生产监督管理有关部门",{"key":31,"text":115,"correct":26},"坑内堆砂袋.回填土.增设锚杆.支撑",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1013112,"下列关于土石方开挖说法错误的是（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"开挖深度超过2m的基坑周边必须安装防护栏杆，防护栏高度不应低于1.2m",{"key":24,"text":123,"correct":26},"多道内支撑基坑开挖遵循“分层支撑.分层开挖.限时支撑.先撑后挖”的原则",{"key":28,"text":125,"correct":26},"基坑边1m范围内不得堆土.堆料.放置机具",{"key":31,"text":127,"correct":22},"基坑开挖时，两人操作间距应大于1.5m。多台机械开挖，挖土机间距应大于10m",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1013114,"下列关于土石方爆破作业做法错误的是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"深孔爆破起爆后，应至少5min后方可进入爆破区检查",{"key":24,"text":135,"correct":26},"边坡控制爆破宜采用预裂爆破和光面爆破",{"key":28,"text":137,"correct":26},"电力起爆网路发生盲炮时，应立即切断电源，及时将盲炮电路短路",{"key":31,"text":139,"correct":26},"浅孔爆破宜采用台阶爆破法，台阶高度不宜超过5m",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1013117,"基坑支护机构的监测应根据结构类型和地下水控制方法选择基坑监测项目，其中根据支护结构的安全等级监测项目可分为“应测”“宜测”和“选测”三种。下列监测项目中，支护结构安全等级全部为“应测”的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"支护结构顶部水平位移",{"key":24,"text":147,"correct":26},"孔隙水压力",{"key":28,"text":149,"correct":26},"土压力",{"key":31,"text":151,"correct":26},"地下水位",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1013119,"当基坑支护结构监测数据出现异常情况时，必须及时进行危险报警，并对基坑支护结构和周边环境中的保护对象采取应急措施。下列情况中不属于应当采取应急措施的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":26},"监测数据达到检测报警值的累计值",{"key":24,"text":159,"correct":22},"基坑出现渗漏",{"key":28,"text":161,"correct":26},"基坑支护结构的支撑或锚杆体系出现过大变形、压屈、断裂、松弛或拔出的迹象",{"key":31,"text":163,"correct":26},"周边管线出现裂缝、泄漏等",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":28,"analysis":33},1013121,"基坑开挖作业一旦开始。施工过程将面临很多安全问题，下列关于基坑安全措施的说法中，正确的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"开挖深度超过3m的，必须在沿基坑边设置防护栏杆且在危险处设置警示",{"key":24,"text":171,"correct":26},"作业人员在作业施工时应有安全立足点，垂直交叉作业应有防护措施",{"key":28,"text":173,"correct":22},"基坑内及基坑周边应设置良好的排水系统，并满足施工、防汛要求",{"key":31,"text":175,"correct":26},"基坑周边距基坑边10m范围内可堆放土石方、料具等荷载较重的物料",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1013124,"下列关于基坑内的降水技术要求的说法中，错误的是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"降水后基坑内的水位应低于坑底0．5m",{"key":24,"text":183,"correct":26},"当基坑侧壁出现渗水时，应采取有效疏排措施",{"key":28,"text":185,"correct":26},"采用管井时，井口宜高于地面200mm以上，并且应防止物体坠人井内",{"key":31,"text":187,"correct":22},"对坑底渗出的地下水，必须采用明沟排水",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},1013127,"基坑开挖过程中，一旦出现了渗水或漏水，应根据水量大小，采用坑底设沟排水、引流修补、密实混凝土封堵、压密注浆、高压喷射注浆等方法及时进行处理。如果水泥土墙等重力式支护结构位移超过设计估计值，应做好监测，掌握发展趋势。若持续发展，则应采用（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"水泥土墙背后卸载、加快垫层施工及加大垫层厚度和架设支撑等方法及时处理",{"key":24,"text":195,"correct":26},"架设支撑或锚杆、支护墙背卸土等方法及时进行处理",{"key":28,"text":197,"correct":26},"及时浇筑垫层，必要时可以加厚垫层，形成下部水平支撑",{"key":31,"text":199,"correct":26},"设坑外回灌井、进行坑底加固、垫层随挖随浇、加厚垫层或采用配筋垫层、设置坑底支撑等方法及时进行处理",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1013130,"护结构或基坑周边环境出现下列规定的报警情况或其他险情时，应立即停止开挖，并应根据危险产生的原因和进一步可能发展的破坏形式。采取控制或加固措施。下列不属于报警情况的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":26},"开挖面出现隆起现象",{"key":24,"text":207,"correct":22},"支护结构构件的内力接近其设计值",{"key":28,"text":209,"correct":26},"基坑周边建筑物、道路、地面出现裂缝，或其沉降、倾斜达到相关规范的变形允许值",{"key":31,"text":211,"correct":26},"基坑出现局部坍塌",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1013132,"当坑底以下存在连续分布、埋深较浅的隔水层时，应采用落底式帷幕。截水帷幕在平面布置上应沿基坑周边闭合。下列关于高压喷射注浆截水帷幕施工的要求中，错误的是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"采用排桩咬合的高压喷射注浆截水帷幕时，应先进行高压喷射注浆施工，后进行排桩施工",{"key":24,"text":219,"correct":22},"高压喷射注浆的施工作业顺序应采用隔孔分序方式，相临孔喷射注浆的时间不宜小于12h",{"key":28,"text":221,"correct":26},"喷射注浆时，应由下而上均匀喷射，停止喷射的位置宜高于帷幕设计顶面标高1m",{"key":31,"text":223,"correct":26},"当喷射注浆因故障中途停喷后，继续注浆时应与停喷前的注浆体搭接，其搭接长度不应小于500mm",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1013135,"基坑发生坍塌前主要迹象不包括（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"周围地面出现细微裂缝",{"key":24,"text":231,"correct":26},"支撑系统发出挤压等异常响声",{"key":28,"text":233,"correct":26},"相当数量的锚杆螺母松动，甚至有槽钢松脱现象",{"key":31,"text":235,"correct":26},"支护系统出现局部失稳",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1013138,"基坑支护是指为保证地下主体结构施工和基坑周边环境的安全，对基坑采用的临时性支挡、加固、保护与地下水控制的措施。基坑工程按破坏后果严重程度分为三个安全等级，其中破坏后果最严重的安全等级为（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"一级",{"key":24,"text":243,"correct":26},"二级",{"key":28,"text":245,"correct":26},"三级",{"key":31,"text":247,"correct":26},"特级",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1013140,"下列不属于危险性较大的基坑工程的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"开挖深度未超过3m的基坑(槽)的土方开挖工程",{"key":24,"text":255,"correct":26},"开挖深度未超过3m，但地质条件和周边环境复杂的基坑(槽)支护、降水工程",{"key":28,"text":257,"correct":26},"开挖深度超过3m(含)的基坑(槽)的土方开挖工程",{"key":31,"text":259,"correct":26},"开挖深度超过5m(含)的基坑(槽)的土方开挖、支护、降水工程",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":28,"analysis":33},1013143,"基坑的安全等级分为3个级别，开挖深度为8m且周围环境无特别要求的基坑属于（ ）。",[264,265,266,267],{"key":20,"text":247,"correct":26},{"key":24,"text":241,"correct":26},{"key":28,"text":243,"correct":22},{"key":31,"text":245,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1013146,"下列关于土方开挖的要求错误的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":26},"土方开挖应遵循“开槽支撑，先撑后挖，分层开挖，严禁超挖”的原则",{"key":24,"text":275,"correct":26},"当开挖基坑土体含水量大而不稳定或基坑较深时，应采用临时性支撑加固",{"key":28,"text":277,"correct":22},"相邻基坑开挖时，应遵循先浅后深或同时进行的施工顺序",{"key":31,"text":279,"correct":26},"当基坑采用降水时，应在降水后开挖地下水位以下的土方。且地下水位应保持在开挖面50cm以下",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1013149,"在基坑开挖过程中，一旦出现了渗水或漏水，应根据水量大小，采用的措施不包括（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"加设支撑或锚杆",{"key":24,"text":287,"correct":26},"密实混凝土封堵",{"key":28,"text":289,"correct":26},"压密注浆",{"key":31,"text":291,"correct":26},"坑底设沟排水",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1013152,"支护的作业应按支护结构设计规定的施工顺序和开挖深度分层开挖。下列关于支护作业的要求中，说法错误的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"当支护结构构件强度接近开挖阶段设计强度时，方可向下开挖",{"key":24,"text":299,"correct":26},"对土钉墙，应在土钉.喷射混凝土面层的养护时间大于2天后，方可开挖下层土方",{"key":28,"text":301,"correct":26},"开挖至锚杆.土钉施工作业面时，开挖面与锚杆.土钉的高差不宜大于500mm",{"key":31,"text":303,"correct":26},"采用锚杆或支撑的支护结构，在未达到设计规定的拆除条件时，严禁拆除锚杆或支撑",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1013155,"支护结构或基坑周边环境出现下列规定的报警情况或其他险情时，应立即停止开挖，并应根据危险产生的原因和进一步可能发展的破坏形式，采取控制或加固措施。下列不属于报警情况的是（ ）",[308,309,310,312],{"key":20,"text":205,"correct":26},{"key":24,"text":207,"correct":22},{"key":28,"text":311,"correct":26},"基坑周边建筑物.道路.地面出现裂缝，或其沉降.倾斜达到相关规范的变形允许值",{"key":31,"text":211,"correct":26},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1013157,"下列不属于危险性较大的基坑工程的是（）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"开挖深度未超过3m的基坑（槽）的土方开挖工程",{"key":24,"text":320,"correct":26},"开挖深度未超过3m，但地质条件和周边环境复杂的基坑（槽）支护.降水工程",{"key":28,"text":322,"correct":26},"开挖深度超过3m（含）的基坑（槽）的土方开挖工程",{"key":31,"text":324,"correct":26},"开挖深度超过5m（含）的基坑（槽）的土方开挖.支护.降水工程",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1013160,"围护结构或基坑周边环境出现下列规定的报警情况或其他险情时，应立即停止开挖，并应根据危险产生的原因和进一步可能发展的破坏形式，采取控制或加固措施。下列不属于报警情况的是（）。",[329,330,331,333],{"key":20,"text":205,"correct":26},{"key":24,"text":207,"correct":22},{"key":28,"text":332,"correct":26},"基坑周边建筑物.道路.地面出现裂缝或其沉降.倾斜达到相关规范的变形允许值",{"key":31,"text":211,"correct":26},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1013163,"下列基坑工程的监测方案应进行专门论证的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"临近建筑和管线的基坑工程",{"key":24,"text":341,"correct":26},"采用新技术.新工艺.新材料.新设备的三级基坑工程",{"key":28,"text":343,"correct":22},"已发生严重事故，重新组织施工的基坑工程",{"key":31,"text":345,"correct":26},"开挖深度大于等于5m的基坑工程",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1013166,"下列属于浅基坑的支护方法的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"锚拉支撑",{"key":24,"text":353,"correct":26},"排桩支护",{"key":28,"text":355,"correct":26},"逆作拱墙",{"key":31,"text":357,"correct":26},"水泥土桩墙",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1013169,"下列基坑安全等级中，不属于一级基坑的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"重要工程或支护结构作为主体结构的一部分",{"key":24,"text":365,"correct":26},"与邻近建筑物.重要设施的距离在开挖深度以内的基坑",{"key":28,"text":367,"correct":26},"基坑范围内有历史文物.近代优秀建筑.重要管线等需要严加保护的基坑",{"key":31,"text":369,"correct":22},"开挖深度6m，且周围环境无特别要求的基坑",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},1013172,"下列基坑工程安全措施做法错误的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"基坑内及基坑周边应设置良好的排水系统，并满足施工.防汛要求",{"key":24,"text":377,"correct":26},"开挖深度超过2m的，必须在沿基坑边设立防护栏杆且在危险处设置红色警示灯",{"key":28,"text":379,"correct":22},"基坑周边距基坑边2m范围内严禁堆放土石方.料具等荷载较重的物料",{"key":31,"text":381,"correct":26},"基坑内应搭设上下通道，以满足作业人员通行。作业人员在作业施工时应有安全立足点，禁止垂直交叉作业",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1013175,"深基坑土方开挖，采用支护结构进行支挡时，错误的支护方法是（ ）。",[386,387,389,390],{"key":20,"text":353,"correct":26},{"key":24,"text":388,"correct":26},"地下连续墙",{"key":28,"text":357,"correct":26},{"key":31,"text":391,"correct":22},"临时模板支撑",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1013177,"下列关于钢质脚手架材料的说法中，错误的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"钢管的尺寸为50．3mm×6．6mm",{"key":24,"text":399,"correct":26},"扣件式钢管脚手架的扣件，应采用可锻铸铁制作的扣件",{"key":28,"text":401,"correct":26},"扣件的螺杆拧紧扭力矩达到65N?m时不得发生破坏，使用时扭力矩应在40～65N?m之间",{"key":31,"text":403,"correct":26},"冲压钢脚手板的钢板厚度不宜小于1．5mm，板面冲孔内切圆直径应小于25mm",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1013180,"关于杆件、构配件的外观质量的规定，下列说法中错误的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"不得使用带有裂纹、折痕、表面明显凹陷、严重锈蚀的钢管",{"key":24,"text":411,"correct":22},"铸件表面应粗糙，可有少量不影响性能的砂眼、气孔、裂纹、浇冒口残余等缺陷，表面粘砂应清除干净",{"key":28,"text":413,"correct":26},"冲压件不得有毛刺、裂纹、明显形变、氧化皮等缺陷",{"key":31,"text":415,"correct":26},"焊接件的焊缝应饱满，焊渣应清除干净，不得有未焊透、夹渣、咬肉、裂纹等缺陷",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1013182,"脚手架搭设应选择合理的搭设顺序和施工操作程序，这是保证脚手架搭设安全和减少架体搭设积累误差的重要举措，脚手架搭设应按顺序施工。下列不符合规定的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"落地作业脚手架、悬挑脚手架一次搭设高度不应超过最上层连墙件三步，且自由高度不应大于6m",{"key":24,"text":423,"correct":26},"支撑脚手架应逐排、逐层进行搭设",{"key":28,"text":425,"correct":26},"剪刀撑、斜撑杆等加固杆件应随架体同步搭设，不得滞后安装",{"key":31,"text":427,"correct":26},"构建组装类脚手架的搭设应自下而上按步架设，并逐层改变搭设方向",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1013185,"下列关于脚手架的安全使用与管理的说法中，错误的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"设置供操作人员上下使用的安全扶梯、爬梯或斜道",{"key":24,"text":435,"correct":26},"高层脚手架和满堂脚手架应该进行检查验收后才能使用",{"key":28,"text":437,"correct":26},"在脚手架上同时进行多层作业的情况下，各作业层之间应设置可靠的防护棚",{"key":31,"text":439,"correct":22},"脚手架拆除的方案和措施应在脚手架专项施工方案以外编写脚手架专项拆除方案",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1013188,"搭设高度超过规范要求的脚手架应编制专项施工方案，基础、连墙件应经设计计算。专项施工方案必须经专家论证的，必须采取加强措施。专项施工方案必须经专家论证的情况包括搭设高度至少超过（ ）的架体。",[444,445,446,448],{"key":20,"text":63,"correct":26},{"key":24,"text":67,"correct":26},{"key":28,"text":447,"correct":22},"50m",{"key":31,"text":449,"correct":26},"100m",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":31,"analysis":33},1013190,"为建筑施工而搭设的、承受荷载的由扣件和钢管等构成的脚手架与支撑架，统称脚手架。扣件即采用螺栓紧固的扣接连接件。下列关于脚手架的构配件的说法中错误的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"脚手架钢管宜采用φ48．3mm×3．6mm钢管。每根钢管的最大质量不应大于25．8kg",{"key":24,"text":457,"correct":26},"扣件在螺栓拧紧扭矩达到65N?m时，不得发生破坏",{"key":28,"text":459,"correct":26},"木胶板脚手板厚度不应小于50mm",{"key":31,"text":461,"correct":22},"可调托撑螺杆与螺母旋合长度不得小于5扣。螺母厚度不得小于10mm",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},1013194,"常见扣件形式有3种，下列关于扣件形式的说法中，错误的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"扣件按照结构形式分直角扣件、旋转扣件、对接扣件",{"key":24,"text":469,"correct":26},"直角扣件式用于垂直交叉杆间连接的扣件",{"key":28,"text":471,"correct":26},"旋转扣件式用于平行或斜交杆件间连接的扣件",{"key":31,"text":473,"correct":22},"对接扣件是用于杆件对接或斜交杆件间连接的扣件",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1013197,"脚手板可采用钢、木、竹材料制作，单块脚手板的质量不宜大于30kg。木胶板应符合国家标准GB50005中材质的规定。构件的材质等级分为3级，分别是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"A级：B级；C级",{"key":24,"text":481,"correct":26},"1级；2级；3级",{"key":28,"text":483,"correct":26},"Ⅰ级：Ⅱ级；Ⅲ级",{"key":31,"text":485,"correct":22},"Ⅰa级：Ⅱa级；Ⅲa级",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1013200,"脚手架上的荷载分为永久荷载(恒荷)和可变荷载(活荷)。永久荷载分项系数取（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"1．0",{"key":24,"text":493,"correct":22},"1．2",{"key":28,"text":495,"correct":26},"1．4",{"key":31,"text":497,"correct":26},"16",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1013203,"脚手架的施工荷载根据脚手架的不同用途，确定装修、结构两种施工均布荷载(kN／m2)。装修脚手架为（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"1kN／m2",{"key":24,"text":505,"correct":22},"2kN／m2",{"key":28,"text":507,"correct":26},"3kN／m2",{"key":31,"text":509,"correct":26},"4kN／m2",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},1013206,"设计脚手架的承重构件时，应根据使用过程中可能出现的荷载取其最不利组合进行计算。下列关于脚手架所受荷载的说法中，正确的是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":26},"钢管脚手架的荷载由剪刀撑、斜撑和连墙杆承受",{"key":24,"text":517,"correct":26},"水平杆和立杆主要是保证脚手架的整体刚度和稳定性",{"key":28,"text":519,"correct":26},"水平杆和连墙杆则承受全部的风荷载",{"key":31,"text":521,"correct":22},"扣件则是架子组成整体的连接和传力件",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1013208,"脚手架上的荷载归纳为竖向荷载和水平荷载两类，下列关于它们的传递路线说法正确的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过水平杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由立杆通过连墙件传给建筑物",{"key":24,"text":529,"correct":26},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过水平杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础：水平力则由水平杆通过连墙件传给建筑物",{"key":28,"text":531,"correct":26},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过立杆传递的：由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由水平杆通过连墙件传给建筑物",{"key":31,"text":533,"correct":22},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过立杆传递的：由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由立杆通过连墙件传给建筑物",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},1013210,"扣件式钢管脚手架的基本构造形式与木脚手架基本相同，有单排架和双排架两种。下列关于扣件式钢管脚手架的构造，说法正确的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":26},"在立杆、纵向水平杆两杆的交叉点称为主节点",{"key":24,"text":541,"correct":26},"主节点处立杆和纵向水平杆的连接扣件与纵向水平杆与横向水平杆的连接扣件的间距应小于500mm",{"key":28,"text":543,"correct":22},"在脚手架使用期间，主节点处的纵向、横向水平杆及连墙件不能拆除",{"key":31,"text":545,"correct":26},"在脚手架使用期间，纵向扫地杆不能拆除，横向扫地杆可以拆除",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},1013213,"搭设高度超过一定高度，钢管、扣件的周转使用率会降低，脚手架的地基基础处理费用也会增加。下列常用单、双排脚手架设计尺寸要求的说法中，错误的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"单排脚手架搭设高度不应超过50m",{"key":24,"text":553,"correct":26},"双排脚手架搭设高度不宜超过50m",{"key":28,"text":555,"correct":26},"立杆采用单管的落地脚手架一般在50m以下",{"key":31,"text":557,"correct":26},"立杆采用单管的落地脚手架当需要搭设高度大于50m时，宜采用加强措施",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":28,"analysis":33},1013215,"纵向水平杆各接头中心至最近主节点的距离不宜大于纵距的1／3。下列关于纵向水平杆的要求中，说法错误的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":26},"纵向水平杆可用于设置在立杆内侧，其长度不能小于3跨",{"key":24,"text":565,"correct":26},"纵向水平杆的对接扣件应交错布置",{"key":28,"text":567,"correct":22},"两根相邻纵向水平杆的结构应设置在同步同跨内",{"key":31,"text":569,"correct":26},"不同步不同跨两相邻接头在水平方向错开的距离不应小于500mm",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},1013218,"下列关于横向水平杆设置的说法中，错误的是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":26},"主节点处必须设置一根横向水平杆，用直角扣件扣接且严禁拆除",{"key":24,"text":577,"correct":26},"脚手架必须设置纵、横向扫地杆",{"key":28,"text":579,"correct":26},"纵向扫地杆应采用直角扣件固定在距底座上皮不大于200mm处的立杆上",{"key":31,"text":581,"correct":22},"横向扫地杆亦采用直角扣件固定在紧靠纵向扫地杆上方",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":28,"analysis":33},1013220,"当立杆基础不在同一高度上时，必须将高处的纵向扫地杆向低处延长两跨与立杆固定，高低差不应大于（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":26},"0．5m",{"key":24,"text":589,"correct":26},"0．7m",{"key":28,"text":591,"correct":22},"1．0m",{"key":31,"text":593,"correct":26},"1．2m",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1013223,"下列关于脚手板设置时，脚手架的要求中正确的是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":26},"当使用冲压钢脚手板、木脚手板、竹串片脚手板时，双排脚手架的横向水平杆两端均采用直角扣件固定在立杆上",{"key":24,"text":601,"correct":22},"当使用冲压钢脚手板、木脚手板、竹串片脚手板时，单排脚手架的横向水平杆的一端，应用直角扣件固定在纵向水平杆上，另一端插入墙内，插入长度不应小于180mm",{"key":28,"text":603,"correct":26},"使用竹笆脚手板时，双排脚手架的横向水平杆两端，应使用直角扣件固定在纵向水平杆上",{"key":31,"text":605,"correct":26},"使用竹笆脚手板时，单排脚手架的横向水平杆一端，应使用直角扣件固定在立杆上，另一端插人墙内，插入长度不应小于280mm",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]