[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-739-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},739,"安全实务-建筑施工安全","建筑工程",0,14,50,791,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,308,320,332,344,356,368,380,391,403,415,427,439,451,463,475,487,499,514,526,538,550,562,574,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1014287,1,"单选题","下列关于脚手架的安全使用与管理的说法中，错误的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","设置供操作人员上下使用的安全扶梯、爬梯或斜道",false,{"key":24,"text":25,"correct":22},"B","高层脚手架和满堂脚手架应该进行检查验收后才能使用",{"key":27,"text":28,"correct":22},"C","在脚手架上同时进行多层作业的情况下，各作业层之间应设置可靠的防护棚",{"key":30,"text":31,"correct":32},"D","脚手架拆除的方案和措施应在脚手架专项施工方案以外编写脚手架专项拆除方案",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1014290,"脚手架上的荷载分为永久荷载（恒荷）和可变荷载（活荷）。永久荷载分项系数取（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1",{"key":24,"text":41,"correct":32},"1.2",{"key":27,"text":43,"correct":22},"1.4",{"key":30,"text":45,"correct":22},"16",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1014293,"为建筑施工而搭设的、承受荷载的由扣件和钢管等构成的脚手架与支撑架，统称脚手架。扣件即采用螺栓紧固的扣接连接件。下列关于脚手架的构配件的说法中错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"脚手架钢管宜采用φ48.3mm×3.6mm钢管。每根钢管的最大质量不应大于25.8kg",{"key":24,"text":53,"correct":22},"扣件在螺栓拧紧扭矩达到65N·m时，不得发生破坏",{"key":27,"text":55,"correct":22},"木胶板脚手板厚度不应小于50mm",{"key":30,"text":57,"correct":32},"可调托撑螺杆与螺母旋合长度不得小于5扣，螺母厚度不得小于10mm",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1014296,"下列关于竹质脚手架材料的说法中，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"竹质立杆、斜撑、顶撑、抛撑、剪刀撑、扫地杆和纵向水平杆的小头一般不小于75mm",{"key":24,"text":65,"correct":22},"竹质纵、横向水平杆的小头不小于90mm",{"key":27,"text":67,"correct":22},"对直径为60?90mm的水平杆杆件，应双杆合并使用",{"key":30,"text":69,"correct":32},"主要受力杆件的使用期限不宜超过3年",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1014299,"落地式操作平台应独立设置，并应与建筑物进行刚性连接，不得与脚手架连接。下列关于落地式操作平台的要求中，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"落地式操作平台的面积不应超过15m2",{"key":24,"text":77,"correct":22},"高度不应超过15m",{"key":27,"text":79,"correct":22},"高宽比不应大于2.5:1",{"key":30,"text":81,"correct":22},"施工平台施工荷载不应超过2.0kN\u002Fm2，接料平台的施工荷载不应超过3.0kN\u002Fm2",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1014305,"拆模时混凝土强度必须符合要求，下列关于模板拆除的说法中，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"不承重的侧模板，应根据与结构同条件养护试块强度达到规定，方可拆除",{"key":24,"text":89,"correct":22},"一般墙体大模板在常温条件下，只要混凝土强度能保证其表面及棱角不因拆除模板而受损坏，即可拆除",{"key":27,"text":91,"correct":22},"承重模板，混凝土强度达到1N\u002Fmm2即可拆除",{"key":30,"text":93,"correct":32},"在拆模过程中，实际结构混凝土强度并未达到要求，应暂停拆模",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1014308,"模板安装应按设计与施工说明书循序拼装。下列关于模板施工的技术要求中，说法错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":32},"竖向模板和支架支承部分安装在基土上时，可不加设垫板",{"key":24,"text":101,"correct":22},"模板安装时，上下应有人接应，随装随运，严禁抛掷",{"key":27,"text":103,"correct":22},"五级风及其以上应停止一切吊运作业",{"key":30,"text":105,"correct":22},"严禁将模板与井字架脚手架或操作平台连成一体",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1014310,"关于杆件、构配件的外观质量的规定，下列说法中错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"不得使用带有裂纹、折痕、表面明显凹陷、严重锈蚀的钢管",{"key":24,"text":113,"correct":32},"铸件表面应粗糙，可有少量不影响性能的砂眼、气孔、裂纹、浇冒口残余等缺陷，表面粘砂应清除干净",{"key":27,"text":115,"correct":22},"冲压件不得有毛刺、裂纹、明显形变、氧化皮等缺陷",{"key":30,"text":117,"correct":22},"焊接件的焊缝应饱满，焊渣应清除干净，不得有未焊透、夹渣、咬肉、裂纹等缺陷",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1014312,"当立杆基础不在同一高度上时，必须将高处的纵向扫地杆向低处延长两跨与立杆固定，高低差不应大于（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"0.5m",{"key":24,"text":125,"correct":22},"0.7m",{"key":27,"text":127,"correct":32},"1.0m",{"key":30,"text":129,"correct":22},"1.2m",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1014315,"脚手架的基础可以用十个字概括“平整、夯实、硬化、垫木、排水（沟槽）\"，下列关于脚手架安全要求的说法中正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"现浇混凝土宽度应超出脚手架宽度两边各10mm以上，待混凝土强度达到70％以上时才可搭设脚手架",{"key":24,"text":137,"correct":32},"底座底面标高以高于自然地坪50mm为宜",{"key":27,"text":139,"correct":22},"地基应里高外低，坡度不少于8％。应沿地基周围设置排水槽",{"key":30,"text":141,"correct":22},"立杆底部垫设垫板时，垫板的长度应不少于5跨",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1014317,"移动式操作平台具有独立的机构，可以搬移。常用于构件施工、装修工程和水电安装等作业。下列关于移动式操作平台的设置要求中，正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"从移动式的特点方面考虑移动式操作平台的面积不应超过30m2",{"key":24,"text":149,"correct":22},"为防止操作平台倾覆，其高度不应超过24m",{"key":27,"text":151,"correct":32},"为保证操作平台整体稳定性其高宽比不应大于3:1",{"key":30,"text":153,"correct":22},"为保证操作平台整体安全其所承受的施工荷载不应超过150kN\u002Fm2",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1014319,"下列关于脚手板的设置说法中，错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"作业层脚手板应铺满、铺稳",{"key":24,"text":161,"correct":22},"冲压钢脚手板、木脚手板、竹串片脚手板等，应设置在三根横向水平杆上",{"key":27,"text":163,"correct":22},"当脚手板长度小于2m时可采用两根横向水平杆支撑，但应将脚手板两端与其可靠固定，严防倾翻",{"key":30,"text":165,"correct":32},"脚手板对接平铺时，接头处必须设一根小横杆",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1014321,"悬挑式脚手架是指架体结构卸荷在附着于建筑结构的刚性悬挑梁（架）上的脚手架，用于建筑施工中的主体或装修工程的作业及其安全防护需要。悬挑式脚手架搭设符合超过一定规模的危险性较大的分部分项工程的高度为大于等于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"10m",{"key":24,"text":173,"correct":32},"20m",{"key":27,"text":175,"correct":22},"24m",{"key":30,"text":177,"correct":22},"50m",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1014323,"下列关于剪刀撑设置的说法中，错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"剪刀撑斜杆的接长应采用搭接或对接，应用旋转扣件固定，旋转扣件中心线至主节点的距离不应大于150mm",{"key":24,"text":185,"correct":22},"高度在24m及以上的双排脚手架应在外侧全立面连续设置剪刀撑",{"key":27,"text":187,"correct":22},"高度在24m以下的双排脚手架，均必须在外侧两端、转角及中间间隔不超过15m的立面上，各设置一道剪刀撑，并应由底至顶连续设置",{"key":30,"text":189,"correct":32},"高度在24m以下的单排脚手架，可只在外侧两端设置一道剪刀撑",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1014325,"搭设高度超过一定高度，钢管、扣件的周转使用率会降低，脚手架的地基基础处理费用也会增加。下列常用单、双排脚手架设计尺寸要求的说法中，错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":32},"单排脚手架搭设高度不应超过50m",{"key":24,"text":197,"correct":22},"双排脚手架搭设高度不宜超过50m",{"key":27,"text":199,"correct":22},"立杆采用单管的落地脚手架一般在50m以下",{"key":30,"text":201,"correct":22},"立杆采用单管的落地脚手架当需要搭设高度大于50m时，宜采用加强措施",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},1014326,"脚手架上的荷载归纳为竖向荷载和水平荷载两类，下列关于它们的传递路线说法正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过水平杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由立杆通过连墙件传给建筑物",{"key":24,"text":209,"correct":22},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过水平杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由水平杆通过连墙件传给建筑物",{"key":27,"text":211,"correct":22},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过立杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由水平杆通过连墙件传给建筑物",{"key":30,"text":213,"correct":32},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过立杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由立杆通过连墙件传给建筑物",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":30,"analysis":33},1014328,"设计脚手架的承重构件时，应根据使用过程中可能出现的荷载取其最不利组合进行计算。下列关于脚手架所受荷载的说法中，正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"钢管脚手架的荷载由剪刀撑、斜撑和连墙杆承受",{"key":24,"text":221,"correct":22},"水平杆和立杆主要是保证脚手架的整体刚度和稳定性",{"key":27,"text":223,"correct":22},"水平杆和连墙杆则承受全部的风荷载",{"key":30,"text":225,"correct":32},"扣件则是架子组成整体的连接和传力件",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1014330,"斜道可用于人行并兼作材料运输的通道，下列关于斜道的要求中，说法错误的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"高度为3m的脚手架，宜采用一字形斜道",{"key":24,"text":233,"correct":32},"高度为3m的脚手架，宜采用之字形斜道",{"key":27,"text":235,"correct":22},"运料斜道宽度不应小于1.5m，坡度不应大于1:6",{"key":30,"text":237,"correct":22},"人行斜道宽度不应小于1m，坡度不应大于1:3",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1014332,"脚手架拆除时，交替的拆除应从上而下逐层进行，严禁上下同时作业。下列关于脚手架拆除的要求中，错误的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"拆除的杆件、构配件应采用机械或人工运至地面，严禁抛掷",{"key":24,"text":245,"correct":32},"同层杆件和构配件必须按先内后外的顺序拆除",{"key":27,"text":247,"correct":22},"剪刀撑、斜撑杆等加固杆件必须在拆卸至该杆件所在部位时再拆除",{"key":30,"text":249,"correct":22},"拆除作业过程中，当架体的自由端高度超过2个步距时，必须采取临时拉结措施",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1014334,"关于模板的面板材料下列说法错误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":32},"模板的面板只可用钢、木、复合纤维板",{"key":24,"text":257,"correct":22},"覆面木胶合板厚度应采用12一18mm的板材",{"key":27,"text":259,"correct":22},"覆面竹胶合板厚度不小于15mm",{"key":30,"text":261,"correct":22},"复合纤维板厚度应采用12mm及以上板材",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1014337,"模板工程的劳动用工约占混凝土工程总用工的1\u002F3。模板通常由3部分组成，分别是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":32},"模板面、支承结构、连接配件",{"key":24,"text":269,"correct":22},"钢支柱、扣件、脚手板",{"key":27,"text":271,"correct":22},"覆面木胶合板、覆面竹胶合板、复合纤维板",{"key":30,"text":273,"correct":22},"钢材、木材、铝合金",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1014340,"作业人员在使用操作平台进行施工时，为了防止平台移动宜将立柱与地坪间垫实，因此立柱底部离地面不得超过80mm或行走轮和导向轮应配有制动器或刹车闸等固定措施。下列关于移动式操作平台的要求中，说法错误的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"操作平台采用中φ48mm×3.6mm钢管扣件连接，亦可采用门架式部件",{"key":24,"text":281,"correct":22},"操作平台四周必须设置防护栏杆",{"key":27,"text":283,"correct":32},"移动式操作平台在移动时，操作平台上的人员应放低重心，且佩戴安全防护装置",{"key":30,"text":285,"correct":22},"单独设置的操作平台应设置供人上下、踏步间距不大于400mm的扶梯",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1014342,"一般现浇楼盖及框架结构的拆模顺序是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":32},"拆柱模斜撑与柱箍→拆柱侧模→拆楼板底模→拆梁侧模→拆梁底模",{"key":24,"text":293,"correct":22},"拆梁底模→拆梁侧模→拆楼板底模→拆柱侧模→拆柱模斜撑与柱箍",{"key":27,"text":295,"correct":22},"拆柱侧模→拆柱模斜撑与柱箍→拆梁底模→拆梁侧模→拆楼板底模",{"key":30,"text":297,"correct":22},"拆楼板底模→拆梁底模→拆柱模斜撑与柱箍→拆梁侧模→拆柱侧模",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1014344,"搭设高度超过规范要求的脚手架应编制专项施工方案，基础、连墙件应经设计计算。专项施工方案必须经专家论证的，必须采取加强措施。专项施工方案必须经专家论证的情况包括搭设高度至少超过（ ）的架体。",[302,303,305,306],{"key":20,"text":171,"correct":22},{"key":24,"text":304,"correct":22},"30m",{"key":27,"text":177,"correct":32},{"key":30,"text":307,"correct":22},"100m",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":30,"analysis":33},1014347,"常见扣件形式有3种，下列关于扣件形式的说法中，错误的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"扣件按照结构形式分直角扣件、旋转扣件、对接扣件",{"key":24,"text":315,"correct":22},"直角扣件式用于垂直交叉杆间连接的扣件",{"key":27,"text":317,"correct":22},"旋转扣件式用于平行或斜交杆件间连接的扣件",{"key":30,"text":319,"correct":32},"对接扣件是用于杆件对接或斜交杆件间连接的扣件",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1014350,"下列关于钢质脚手架材料的说法中，错误的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":32},"钢管的尺寸为50.3mm×6.6mm",{"key":24,"text":327,"correct":22},"扣件式钢管脚手架的扣件，应采用可锻铸铁制作的扣件",{"key":27,"text":329,"correct":22},"扣件的螺杆拧紧扭力矩达到65N·m时不得发生破坏，使用时扭力矩应在40~65N·m之间",{"key":30,"text":331,"correct":22},"冲压钢脚手板的钢板厚度不宜小于1.5mm，板面冲孔内切圆直径应小于25mm",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":30,"analysis":33},1014353,"下列关于绑扎材料的说法中，错误的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"钢丝绑扎木脚手架一般采用8号或10号镀锌钢丝。不得有锈蚀或机械损伤",{"key":24,"text":339,"correct":22},"竹脚手架一般来说应采用竹蔑绑扎。竹蔑三个月要更换一次",{"key":27,"text":341,"correct":22},"竹竿的绑扎材料严禁重复使用",{"key":30,"text":343,"correct":32},"竹竿的绑扎材料可接长使用",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":30,"analysis":33},1014356,"脚手板可采用钢、木、竹材料制作，单块脚手板的质量不宜大于30kg。木胶板应符合国家标准GB 50005中材质的规定。构件的材质等级分为3级，分别是（）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"A级；B级；C级",{"key":24,"text":351,"correct":22},"1级；2级；3级",{"key":27,"text":353,"correct":22},"Ⅰ级：Ⅱ级;Ⅲ级",{"key":30,"text":355,"correct":32},"Ⅰa级；Ⅱa级；Ⅲa级",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1014358,"脚手架的施工荷载根据脚手架的不同用途，确定装修、结构两种施工均布荷载（kN\u002Fm 2 ）。装修脚手架为（）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"1kN\u002Fm 2",{"key":24,"text":363,"correct":32},"2kN\u002Fm 2",{"key":27,"text":365,"correct":22},"3kN\u002Fm 2",{"key":30,"text":367,"correct":22},"4kN\u002Fm 2",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},1014360,"木质脚手架立杆和斜杆（包括斜撑、抛撑、剪刀撑等）的小头直径一般不小于（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"50mm",{"key":24,"text":375,"correct":22},"60mm",{"key":27,"text":377,"correct":32},"70mm",{"key":30,"text":379,"correct":22},"90mm",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1014362,"竹质脚手架主要受力杆件的使用期限不宜超过（ ）年。",[384,386,387,389],{"key":20,"text":385,"correct":22},"半",{"key":24,"text":39,"correct":32},{"key":27,"text":388,"correct":22},"2",{"key":30,"text":390,"correct":22},"3",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1014363,"复合纤维板表面应平整光滑不变形，厚度应采用（ ）mm及以上板材。",[395,397,399,401],{"key":20,"text":396,"correct":32},"12",{"key":24,"text":398,"correct":22},"18",{"key":27,"text":400,"correct":22},"24",{"key":30,"text":402,"correct":22},"32",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":30,"analysis":33},1014365,"双排脚手架应设置剪刀撑与横向斜撑，单排脚手架应设置剪刀撑。每道剪刀撑跨越立杆的根数为5～6根，斜杆与地面的倾角应在45°～60°之间。当剪刀撑斜杆与地面的倾角为45°时，剪刀撑跨越立杆的最多根数为（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"4",{"key":24,"text":410,"correct":22},"5",{"key":27,"text":412,"correct":22},"6",{"key":30,"text":414,"correct":32},"7",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},1014367,"下列关于钢管柱施工相关要求的说法中，错误的是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"为便于起吊，钢管柱出厂前应在管顶焊接耳片，位置约在管顶下50mm",{"key":24,"text":422,"correct":22},"耳片侧面须加焊肋板，确保在最不利位置起吊时不致侧翻破坏",{"key":27,"text":424,"correct":32},"当钢管柱底部轴线对齐后，对其进行调直时，大的偏差靠兰花口调整，由吊臂进行细致调整",{"key":30,"text":426,"correct":22},"对比较长的钢管柱做有效临时支护，尽快脱钩后再继续进行焊接工序，加快吊装速度",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":30,"analysis":33},1014369,"暗挖车站常用施工方法包括PBA法、CRD法、双侧壁导坑法、中洞法、侧洞法、柱洞法等施工方法。施工中先开挖两侧部分，在侧洞内施作梁、柱结构，然后再开挖中间部分，并逐渐将中洞顶部荷载通过初期支护转移到梁、柱结构上的施工方法，属于（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"PBA法",{"key":24,"text":434,"correct":22},"CRD法",{"key":27,"text":436,"correct":22},"中洞法",{"key":30,"text":438,"correct":32},"侧洞法",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":30,"analysis":33},1014370,"下列不属于城市轨道交通地下工程施工风险管理实施的主要阶段的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"施工准备期",{"key":24,"text":446,"correct":22},"施工期",{"key":27,"text":448,"correct":22},"车辆及机电系统安装与调试",{"key":30,"text":450,"correct":32},"验收完成正式投产",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1014371,"城市轨道交通地下工程建设应采取经济、可行、主动的处置措施来减少或降低风险，风险控制必须坚持（ ）的原则。",[455,457,459,461],{"key":20,"text":456,"correct":32},"“安全第一、保护环境、预防为主”",{"key":24,"text":458,"correct":22},"“安全第一、预防为主、综合治理”",{"key":27,"text":460,"correct":22},"“同时设计、同时施工、同时投产使用”",{"key":30,"text":462,"correct":22},"“法人是企业安全生产第一责任人”",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},1014372,"刀盘内更换刀具也是盾构法隧道施工过程中一项相对危险的作业工序，所以在更换刀具前工具、设备及应急物品应准备齐全。下列关于更换刀具时的安全注意事项中，说法正确的是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":32},"对土舱内的气体进行检测，在保证无有毒气体的情况下才可进行刀具更换",{"key":24,"text":470,"correct":22},"电动工具需选用42V以下的安全电压",{"key":27,"text":472,"correct":22},"在地质条件比较稳定的情况下，一般采取气压换刀",{"key":30,"text":474,"correct":22},"在盾构机前方或上方的土体不能自稳的情况下，需进行常压换刀",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":27,"analysis":33},1014374,"《城市轨道交通工程质量安全检查指南》（以下简称《指南》）评定划分为优良、合格、不合格三个等级。依据《指南》评分的最终得分为68分，则属于（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"优良",{"key":24,"text":482,"correct":22},"合格",{"key":27,"text":484,"correct":32},"不合格",{"key":30,"text":486,"correct":22},"差",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":30,"analysis":33},1014376,"我国地铁施工方法由最初单一的明挖法发展到现在的多种方法并存的施工方法。下列施工方法中，不属于地铁常用施工方法的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"明挖",{"key":24,"text":494,"correct":22},"暗挖",{"key":27,"text":496,"correct":22},"盾构法",{"key":30,"text":498,"correct":32},"人工法",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1014378,"盾构法隧道施工的一般用电是临时用电，电缆线必须使用三相五线电缆。盾构机采用的高压用电应符合要求。下列关于盾构机高压用电系统的要求中，说法正确的是（ ）。",[503,505,507,509,511],{"key":20,"text":504,"correct":32},"盾构机动力系统掘进用电一般是采用双回路专供的电缆路专供的电缆",{"key":24,"text":506,"correct":22},"电缆从变电站接到盾构机上面一般采用架空架设",{"key":27,"text":508,"correct":22},"高压电缆采用埋地敷设时，埋地深度不小于0.2m，电缆周围需铺50mm厚的细砂",{"key":30,"text":510,"correct":22},"随着盾构向前不断推进，高压电缆应预留足够长度，严禁使用接驳器接连",{"key":512,"text":513,"correct":22},"E","在隧道内轨道运输车辆必须高于电缆固定式悬挂的高度",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1014380,"暗挖地铁车站的结构形式、工程环境条件及暗挖工法三者密切相关。下列暗挖地铁车站结构形式选择原则的说法中，错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"在满足功能的前提下，车站的结构形式应尽量紧凑，压缩土建规模，节省造价",{"key":24,"text":521,"correct":32},"在车站客流量较大，地质条件较好，地下水可以疏干的情况下，可采用单拱单层结构形式",{"key":27,"text":523,"correct":22},"当车站客流量不大，水文地质条件好时，可采用多拱（或单拱多跨）单层结构形式",{"key":30,"text":525,"correct":22},"当车站受环境条件限制，线间距不能拉开，岛式站台宽度小于12m时，可采用双拱或单拱结构",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},1014382,"下列不属于暗挖车站工法选择原则的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"安全可行性原则",{"key":24,"text":533,"correct":22},"工期可控性原则",{"key":27,"text":535,"correct":32},"整体可靠性原则",{"key":30,"text":537,"correct":22},"经济合理性原则",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1014384,"顶纵梁即钢管混凝土柱上的纵梁，也是车站主体结构的主要承载结构。纵梁底部钢板通过钢管柱顶部的预埋锚固螺栓与钢管柱连接。中洞法暗挖地铁站顶梁施工顺序为（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"芯梁部位钢筋绑扎一模板支架施工一芯梁底板预制。芯梁底板安装一顶部防水层铺设一混凝土浇筑",{"key":24,"text":545,"correct":32},"芯梁底板预制一芯梁底板安装一顶部防水层铺设、芯梁部位钢筋绑扎一模板支架施工一混凝土浇筑",{"key":27,"text":547,"correct":22},"芯梁部位钢筋绑扎一模板支架施工。芯梁底板安装。顶部防水层铺设。芯梁底板预制。混凝土浇筑",{"key":30,"text":549,"correct":22},"芯梁底板预制一顶部防水层铺设一芯梁部位钢筋绑扎一芯梁底板安装一模板支架施工一混凝土浇筑",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":30,"analysis":33},1014386,"PBA工法就是在边导洞内施工车站的边桩，在中岛洞内施工梁柱，然后在桩柱体系间进行初支和二衬扣拱，形成车站的顶部结构，并在顶部结构的保护下由上至下逆筑车站结构。PBA法具体施工流程为（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"边桩施工、柱孔开挖→导洞开挖→桩、柱顶梁施工→钢管柱吊装及灌注混凝土→底梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"key":24,"text":557,"correct":22},"边桩施工、柱孔开挖→底梁施工→导洞开挖→钢管柱吊装及灌注混凝土→桩、柱顶梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"key":27,"text":559,"correct":22},"导洞开挖→边桩施工、柱孔开挖→桩、柱顶梁施工→顶部初支及二衬扣拱→底梁施工→钢管柱吊装及灌注混凝土→站厅层施工→站台层施工",{"key":30,"text":561,"correct":32},"导洞开挖→边桩施工、柱孔开挖→底梁施工、钢管柱吊装及灌注混凝土→桩、柱顶梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},1014389,"盾构法隧道施工中除一般机械设备用电和生活用电等常规用电外，盾构掘进动力系统的供电电压为（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"380V",{"key":24,"text":569,"correct":22},"1kV",{"key":27,"text":571,"correct":32},"10kV",{"key":30,"text":573,"correct":22},"35kV",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1014391,"目前地铁车站施工的主要工法有明挖法、暗挖法、盖挖法及盾构法。充分利用围岩的自承作用，要求初期支护具有一定刚度，以改造地质条件为前提，以控制地表沉降为重点，以格栅和喷锚作为初期支护手段，按照十八字原则进行设计和施工的施工方法，属于（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"明挖法",{"key":24,"text":581,"correct":32},"暗挖法",{"key":27,"text":583,"correct":22},"盖挖法",{"key":30,"text":496,"correct":22},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},1014394,"以下关于地铁车站施工主要工法的适用条件，说法错误的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"适合多种不同类别的地质条件",{"key":24,"text":592,"correct":22},"适用于浅埋车站",{"key":27,"text":594,"correct":22},"可使用的空间比较大",{"key":30,"text":596,"correct":32},"适用于地面不能长期占用或交通不能长期中断的情况",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":30,"analysis":33},1014397,"以下关于浅埋暗挖法的表述，错误的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"浅埋暗挖法是针对埋置深度较浅、松散不稳定的土层和软弱破碎岩层施工",{"key":24,"text":604,"correct":22},"浅埋暗挖法并没有充分考虑利用围岩的自承作用",{"key":27,"text":606,"correct":22},"浅埋暗挖法与明挖法、盖挖法相比，对地面建、构筑物等影响最小，在环境复杂区域应用广泛",{"key":30,"text":608,"correct":32},"浅埋暗挖法适用于降水有困难的地层",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":27,"analysis":33},1014400,"PBA工法的施工流程：①桩、柱顶梁施工；②钢管柱吊装及灌注混凝土；③导洞开挖；④顶部初支及二衬扣拱；⑤边桩施工、柱孔开挖；⑥站厅层施工；⑦底梁施工；⑧站台层施工，正确的顺序是（ ）。",[613,615,617,619],{"key":20,"text":614,"correct":22},"①④⑥⑧③⑤⑦②",{"key":24,"text":616,"correct":22},"⑦②①③⑤④⑥⑧",{"key":27,"text":618,"correct":32},"③⑤⑦②①④⑥⑧",{"key":30,"text":620,"correct":22},"⑥⑧③⑤⑦②①④",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]