[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-739-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},739,"安全实务-建筑施工安全","建筑工程",0,13,50,791,[13,34,46,58,68,80,92,104,116,128,140,152,164,176,188,196,208,220,232,244,255,267,279,291,303,315,327,339,350,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1014154,1,"单选题","深基坑土方开挖，采用支护结构进行支挡时，错误的支护方法是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","排桩支护",false,{"key":24,"text":25,"correct":22},"B","地下连续墙",{"key":27,"text":28,"correct":22},"C","水泥土桩墙",{"key":30,"text":31,"correct":32},"D","临时模板支撑",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1014157,"下列关于基坑内的降水技术要求的说法中，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"降水后基坑内的水位应低于坑底0.5m",{"key":24,"text":41,"correct":22},"当基坑侧壁出现渗水时，应采取有效疏排措施",{"key":27,"text":43,"correct":22},"采用管井时，井口宜高于地面200mm以上，并且应防止物体坠入井内",{"key":30,"text":45,"correct":32},"对坑底渗出的地下水，必须采用明沟排水",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1014159,"下列不属于危险性较大的基坑工程的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"开挖深度未超过3m的基坑（槽）的土方开挖工程",{"key":24,"text":53,"correct":22},"开挖深度未超过3m，但地质条件和周边环境复杂的基坑（槽）支护、降水工程",{"key":27,"text":55,"correct":22},"开挖深度超过3m（含）的基坑（槽）的土方开挖工程",{"key":30,"text":57,"correct":22},"开挖深度超过3m（含）的基坑（槽）的土方开挖、支护、降水工程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1014162,"下列属于浅基坑的支护方法的是（ ）。",[62,64,65,67],{"key":20,"text":63,"correct":32},"锚拉支撑",{"key":24,"text":21,"correct":22},{"key":27,"text":66,"correct":22},"逆作拱墙",{"key":30,"text":28,"correct":22},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":27,"analysis":33},1014165,"检查员发现盲炮或怀疑盲炮，应向爆破负责人报告后组织进一步及检查和处理；在上述情况下，不应发出解除警戒信号。电力起爆网路发生盲炮时，应立即切断电源，及时将盲炮电路（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"开路",{"key":24,"text":75,"correct":22},"断路",{"key":27,"text":77,"correct":32},"短路",{"key":30,"text":79,"correct":22},"通电",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":20,"analysis":33},1014168,"下列关于土石方开挖的安全防护措施的说法中，错误的是（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":32},"开挖深度超过3m的基坑周边必须安装防护栏杆，防护栏杆高度不应低于lm",{"key":24,"text":87,"correct":22},"基坑内的专用梯道应设扶手栏杆，专用梯道宽度不应小于lm",{"key":27,"text":89,"correct":22},"同一垂直作业面需要同时作业时，上下层之间应采取隔离防护措施",{"key":30,"text":91,"correct":22},"采用井点降水时，井口设置防护盖板或围栏，警示标志应明显",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1014171,"基坑发生坍塌前主要迹象不包括（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":32},"周围地面出现细微裂缝",{"key":24,"text":99,"correct":22},"支撑系统发出挤压等异常响声",{"key":27,"text":101,"correct":22},"相当数量的锚杆螺母松动，甚至有槽钢松脱现象",{"key":30,"text":103,"correct":22},"支护系统出现局部失稳",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1014174,"土按其不同粒组的相对含量可划分为三类。当砾粒组质量大于总质量的50％的粗粒土称为砾类土，砾类土属于（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"巨粒土",{"key":24,"text":111,"correct":32},"粗粒土",{"key":27,"text":113,"correct":22},"砂粒土",{"key":30,"text":115,"correct":22},"细粒土",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},1014177,"采用复合土钉支护的基坑开挖施工，基坑开挖应与土钉施工分层交替进行，应缩短无支护暴露时间。采用分层方法进行土方开挖，每层土方开挖的底标高应低于相应土钉位置，且距离不宜大于200mm，每层分段长度不应大于（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"10m",{"key":24,"text":123,"correct":22},"20m",{"key":27,"text":125,"correct":32},"30m",{"key":30,"text":127,"correct":22},"40m",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":30,"analysis":33},1014180,"采用放坡开挖的基坑，应验算基坑边坡的稳定性，边坡坡度应根据土层性质、开挖深度确定，各级边坡坡度不宜大于（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"1：1.05",{"key":24,"text":135,"correct":22},"1：1.20",{"key":27,"text":137,"correct":22},"1：1.25",{"key":30,"text":139,"correct":32},"1：1.50",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1014183,"基坑支护是指为保证地下主体结构施工和基坑周边环境的安全，对基坑采用的临时性支挡、加固、保护与地下水控制的措施。基坑工程按破坏后果严重程度分为三个安全等级，其中破坏后果最严重的安全等级为（）。",[144,146,148,150],{"key":20,"text":145,"correct":32},"一级",{"key":24,"text":147,"correct":22},"二级",{"key":27,"text":149,"correct":22},"三级",{"key":30,"text":151,"correct":22},"特级",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1014186,"基坑支护机构的监测应根据结构类型和地下水控制方法选择基坑监测项目，其中根据支护结构的安全等级监测项目可分为“应测”“宜测”和“选测”三种。下列监测项目中，支护结构安全等级全部为“应测”的是（）。",[156,158,160,162],{"key":20,"text":157,"correct":32},"支护结构顶部水平位移",{"key":24,"text":159,"correct":22},"孔隙水压力",{"key":27,"text":161,"correct":22},"土压力",{"key":30,"text":163,"correct":22},"地下水位",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1014189,"护结构或基坑周边环境出现下列规定的报警情况或其他险情时，应立即停止开挖，并应根据危险产生的原因和进一步可能发展的破坏形式，采取控制或加固措施。下列不属于报警情况的是（）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"开挖面出现隆起现象",{"key":24,"text":171,"correct":32},"支护结构构件的内力接近其设计值",{"key":27,"text":173,"correct":22},"基坑周边建筑物、道路、地面出现裂缝或其沉降、倾斜达到相关规范的变形允许值",{"key":30,"text":175,"correct":22},"基坑出现局部坍塌",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1014192,"在土石方工程中，根据土的开挖难易程度，将土分为松软土、普通土、坚土、砂砾坚土、软石、次坚石、坚石、特坚石，前四类为一般土，后四类为岩石。在现场能用锹、锄头挖掘，少许用脚蹬的土类属于（）。",[180,182,184,186],{"key":20,"text":181,"correct":32},"—类土（松软土）",{"key":24,"text":183,"correct":22},"二类土（普通土）",{"key":27,"text":185,"correct":22},"三类土（坚土）",{"key":30,"text":187,"correct":22},"四类土（砂砾坚土）",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},1014193,"基坑的安全等级分为3个级别，开挖深度为8m且周围环境无特别要求的基坑属于（）。",[192,193,194,195],{"key":20,"text":151,"correct":22},{"key":24,"text":145,"correct":22},{"key":27,"text":147,"correct":32},{"key":30,"text":149,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},1014196,"浅孔爆破起爆后，应至少（ ）min后方可进入爆破区检查。",[200,202,204,206],{"key":20,"text":201,"correct":22},"15",{"key":24,"text":203,"correct":22},"3",{"key":27,"text":205,"correct":32},"5",{"key":30,"text":207,"correct":22},"10",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":27,"analysis":33},1014199,"土被固体颗粒所充实的程度，反映土的紧密程度的指标称为（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":22},"土的天然密度",{"key":24,"text":215,"correct":22},"土的干密度",{"key":27,"text":217,"correct":32},"土的密实度",{"key":30,"text":219,"correct":22},"土的可松性",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":27,"analysis":33},1014202,"土石方开挖时，分层支撑和开挖的基坑上部可采用大型施工机械开挖，下部宜采用小型施工机械和人工挖土，在内支撑以下挖土时，每层开挖深度不得大于（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"0.5m",{"key":24,"text":227,"correct":22},"1m",{"key":27,"text":229,"correct":32},"2m",{"key":30,"text":231,"correct":22},"2.5m",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},1014205,"关于土石方开挖的施工安全作业要求，以下说法错误的是（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"基坑开挖时，两人操作间距应大于2.5m",{"key":24,"text":239,"correct":32},"多台机械开挖，挖土机间距应大于20m",{"key":27,"text":241,"correct":22},"基坑开挖期间，支护结构达到设计强度要求前，严禁在设计预计的滑裂面范围内堆载",{"key":30,"text":243,"correct":22},"采用放坡开挖的基坑，应验算基坑边坡的稳定性，边坡坡度应根据土层性质、开挖深度确定，各级边坡坡度不宜大于1：1.5",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":33},1014208,"岛式土方开挖时，中部岛状土体的开挖应均衡对称进行，高度大于（ ）时，应采用分层开挖的方法。",[248,249,251,253],{"key":20,"text":229,"correct":22},{"key":24,"text":250,"correct":22},"3m",{"key":27,"text":252,"correct":32},"4m",{"key":30,"text":254,"correct":22},"5m",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},1014211,"岛式土方开挖时，当高度大于4m时，应采用（ ）形式，坡间放坡平台宽度不应小于4m。",[259,261,263,265],{"key":20,"text":260,"correct":22},"单级放坡",{"key":24,"text":262,"correct":32},"二级放坡",{"key":27,"text":264,"correct":22},"三级放坡",{"key":30,"text":266,"correct":22},"四级放坡",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1014213,"开挖深度超过（ ）的基坑周边必须安装防护栏杆，防护栏高度不应低于（ ），安装牢固，材料应有足够的强度。",[271,273,275,277],{"key":20,"text":272,"correct":22},"1.2m，2m",{"key":24,"text":274,"correct":32},"2m，1.2m",{"key":27,"text":276,"correct":22},"1.2m，1.2m",{"key":30,"text":278,"correct":22},"2m，2m",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1014216,"在爆破作业区内有两个及以上爆破施工单位同时实施爆破作业时，必须由（ ）负责统一协调指挥。",[283,285,287,289],{"key":20,"text":284,"correct":22},"施工单位",{"key":24,"text":286,"correct":32},"建设单位",{"key":27,"text":288,"correct":22},"监理单位",{"key":30,"text":290,"correct":22},"安全监管单位",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1014219,"基坑支护设计应规定其设计使用期限。基坑支护的设计使用期限不应小于（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":32},"一年",{"key":24,"text":298,"correct":22},"二年",{"key":27,"text":300,"correct":22},"三年",{"key":30,"text":302,"correct":22},"五年",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},1014221,"关于深基坑的排桩支护，以下说法错误的是（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"排桩支护通常由支护桩、支撑（或土层锚杆）及防渗帷幕等组成",{"key":24,"text":310,"correct":32},"仅适用于基坑侧壁安全等级为一级、二级的情况",{"key":27,"text":312,"correct":22},"适用于可采取降水或止水帷幕的基坑",{"key":30,"text":314,"correct":22},"排桩可根据工程情况分为悬臂式支护结构、拉锚式支护结构、内撑式支护结构和锚杆式支护结构",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":30,"analysis":33},1014224,"关于深基坑的水泥土桩墙支护，以下说法错误的是（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"依靠其本身自重和刚度保护坑壁，一般不设支撑",{"key":24,"text":322,"correct":22},"基坑侧壁安全等级宜为二、三级",{"key":27,"text":324,"correct":22},"水泥土桩施工范围内地基土承载力宜≤150kPa",{"key":30,"text":326,"correct":32},"基坑深度宜≤5m",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":30,"analysis":33},1014227,"根据《建筑地基基础工程施工质量验收规范》（GB50202）的划分方法，将基坑安全等级划分为三个等级，以下属于三级的是（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"开挖深度大于10m",{"key":24,"text":334,"correct":22},"重要工程或支护结构作为主体结构的一部分",{"key":27,"text":336,"correct":22},"与邻近建筑物、重要设脏的距离在开挖深度以内的基坑",{"key":30,"text":338,"correct":32},"开挖深度小于7m，且周围环境无特别要求的基坑",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1014229,"开挖深度大于等于（ ）或开挖深度小于（ ）但现场地质情况和周围环境较复杂的基坑工程及其他需要检测的基坑工程应实施基坑工程监测。",[343,344,346,348],{"key":20,"text":278,"correct":22},{"key":24,"text":345,"correct":22},"3m，3m",{"key":27,"text":347,"correct":32},"5m，5m",{"key":30,"text":349,"correct":22},"8m，8m",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},1014232,"基坑周边距基坑边（ ）范围内严禁堆放土石方、料具等荷载较重的物料。",[354,355,356,357],{"key":20,"text":227,"correct":32},{"key":24,"text":229,"correct":22},{"key":27,"text":250,"correct":22},{"key":30,"text":254,"correct":22},{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1014235,"喷射注浆时，当孔口的返浆量大于注浆量的（ ）时，可采用提高喷射压力、增加提升速度等措施。",[362,364,366,368],{"key":20,"text":363,"correct":22},"10%",{"key":24,"text":365,"correct":32},"20%",{"key":27,"text":367,"correct":22},"25%",{"key":30,"text":369,"correct":22},"30%",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1014238,"脚手架搭设应选择合理的搭设顺序和施工操作程序，这是保证脚手架搭设安全和减少架体搭设积累误差的重要举措，脚手架搭设应按顺序施工。下列不符合规定的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"落地作业脚手架、悬挑脚手架一次搭设高度不应超过最上层连墙件三步，且自由高度不应大于6m",{"key":24,"text":377,"correct":22},"支撑脚手架应逐排、逐层进行搭设",{"key":27,"text":379,"correct":22},"剪刀撑、斜撑杆等加固杆件应随架体同步搭设，不得滞后安装",{"key":30,"text":381,"correct":22},"构建组装类脚手架的搭设应自下而上按步架设，并逐层改变搭设方向",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":30,"analysis":33},1014241,"下列关于脚手架的设计、搭设、使用和维护的表述正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"结构应稳定，不得发生变形",{"key":24,"text":389,"correct":22},"应满足使用要求，通过其他附加设施实现安全防护功能",{"key":27,"text":391,"correct":22},"在使用中，脚手架结构性能可发生明显改变",{"key":30,"text":393,"correct":32},"当遇意外作用或偶然超载时，不得发生整体破坏",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},1014244,"纵向水平杆各接头中心至最近主节点的距离不宜大于纵距的1\u002F3。下列关于纵向水平杆的要求中，说法错误的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"纵向水平杆可用于设置在立杆内侧，其长度不能小于3跨",{"key":24,"text":401,"correct":22},"纵向水平杆的对接扣件应交错布置",{"key":27,"text":403,"correct":32},"两根相邻纵向水平杆的结构应设置在同步同跨内",{"key":30,"text":405,"correct":22},"不同步不同跨两相邻接头在水平方向错开的距离不应小于500mm",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":30,"analysis":33},1014247,"下列关于木质脚手架材料的说法中，错误的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"木杆常用剥皮杉杆或落叶松",{"key":24,"text":413,"correct":22},"木杆立杆和斜杆（包括斜撑、抛撑、剪刀撑等）的小头直径一般不小于70mm",{"key":27,"text":415,"correct":22},"木杆纵向水平杆、横向水平杆的小头一般不小于80mm",{"key":30,"text":417,"correct":32},"木质脚手板的厚度一般不小于30mm",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":30,"analysis":33},1014250,"下列关于横向水平杆设置的说法中，错误的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"主节点处必须设置一根横向水平杆，用直角扣件扣接且严禁拆除",{"key":24,"text":425,"correct":22},"脚手架必须设置纵、横向扫地杆",{"key":27,"text":427,"correct":22},"纵向扫地杆应采用直角扣件固定在距底座上皮不大于200mm处的立杆上",{"key":30,"text":429,"correct":32},"横向扫地杆亦采用直角扣件固定在紧靠纵向扫地杆上方",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":30,"analysis":33},1014252,"模板工程的施工安全的重要性尤为突出，下列不属于模板分类的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"定型组合模板",{"key":24,"text":437,"correct":22},"墙体大模板",{"key":27,"text":439,"correct":22},"飞模",{"key":30,"text":441,"correct":32},"自提升式钢模板",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},1014254,"操作平台的构造、荷载要求及搭设与拆除，与脚手架相近，为方便施工现场的使用与管理，要求操作平台符合相关脚手架规范和要求。下列不属于施工现场操作平台常见分类的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"移动式操作平台",{"key":24,"text":449,"correct":22},"落地式操作平台",{"key":27,"text":451,"correct":22},"悬挑式操作平台",{"key":30,"text":453,"correct":32},"液压式操作平台",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1014256,"下列关于立杆设置的说法中，错误的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"每根立杆底部应设置底座，座下再设垫板",{"key":24,"text":461,"correct":32},"脚手架底层步距不应大于3m",{"key":27,"text":463,"correct":22},"立杆必须用连墙件与建筑物可靠连接",{"key":30,"text":465,"correct":22},"立杆接长除顶层顶部可采用搭接外，其余各层必须采用对接扣件连接",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},1014257,"下列关于连墙杆的设置中，说法错误的是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"宜靠近主节点设置，偏离主节点的距离不应大于300mm",{"key":24,"text":473,"correct":22},"连墙件应从底层第一步处开始设置，当该处设置有困难时，应采用其他可靠措施固定",{"key":27,"text":475,"correct":32},"连墙件中的连墙杆应向脚手架一端下斜连接",{"key":30,"text":477,"correct":22},"对高度24m以上的双排脚手架，应采用刚性连墙件与建筑物连接",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1014259,"下列关于脚手板设置时，脚手架的要求中正确的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"当使用冲压钢脚手板、木脚手板、竹串片脚手板时，双排脚手架的横向水平杆两端均采用直角扣件固定在立杆上",{"key":24,"text":485,"correct":32},"当使用冲压钢脚手板、木脚手板、竹串片脚手板时，单排脚手架的横向水平杆的一端，应用直角扣件固定在纵向水平杆上，另一端插入墙内，插入长度不应小于180mm",{"key":27,"text":487,"correct":22},"使用竹笆脚手板时，双排脚手架的横向水平杆两端，应使用直角扣件固定在纵向水平杆上",{"key":30,"text":489,"correct":22},"使用竹笆脚手板时，单排脚手架的横向水平杆一端，应使用直角扣件固定在立杆上，另一端插入墙内，插入长度不应小于280mm",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1014261,"下列关于横向斜撑设置的说法中错误的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"横向斜撑应在同一节间由底至顶呈之字形连续设置",{"key":24,"text":497,"correct":22},"高度在24m以下的封闭型双排脚手架可不设横向斜撑",{"key":27,"text":499,"correct":32},"高度在24m以上的封闭型双排脚手架，可只在拐角处设置横向斜撑",{"key":30,"text":501,"correct":22},"开口型双排脚手架的两端均必须设置横向斜撑",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},1014263,"扣件式钢管脚手架的基本构造形式与木脚手架基本相同，有单排架和双排架两种。下列关于扣件式钢管脚手架的构造，说法正确的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"在立杆、纵向水平杆两杆的交叉点称为主节点",{"key":24,"text":509,"correct":22},"主节点处立杆和纵向水平杆的连接扣件与纵向水平杆与横向水平杆的连接扣件的间距应小于500mm",{"key":27,"text":511,"correct":32},"在脚手架使用期间，主节点处的纵向、横向水平杆及连墙件不能拆除",{"key":30,"text":513,"correct":22},"在脚手架使用期间，纵向扫地杆不能拆除，横向扫地杆可以拆除",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1014265,"脚手架工程必须有完善的施工方案，并经企业技术负责人审批。并且有完善的安全防护措施，要按规定设置安全网、防护栏、挡脚板。下列关于脚手架工程的安全技术要求中，说法错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"操作人员上下架子，要有保证安全的扶梯、爬梯或斜道",{"key":24,"text":521,"correct":22},"必须有良好的防电、避雷装置，钢脚手架等均应可靠接地，高于四周建筑物的脚手架应设避雷装置",{"key":27,"text":523,"correct":32},"脚手板要铺满、铺稳，应保留探头板，并要保证有3个支撑点，并绑扎牢固",{"key":30,"text":525,"correct":22},"遇6级以上大风或大雾、大雨，应暂停高处作业，雨雪后上架操作要有防滑措施",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1014267,"下列关于模板设计计算的要求中，正确的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"钢模板及其支撑其界面塑性发展系数取2",{"key":24,"text":533,"correct":22},"受压立杆梢径不得小于20mm",{"key":27,"text":535,"correct":22},"钢杆件受拉构件长细比不应大于250",{"key":30,"text":537,"correct":32},"木杆件受拉构件长细比不应大于250",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},1014270,"荷载设计值应符合相关规定。荷载分项系数分为永久荷载和活荷载，永久荷载和活荷载的取值分别为（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"0.8；1",{"key":24,"text":545,"correct":22},"1.0；1.2",{"key":27,"text":547,"correct":32},"1.2；1.4",{"key":30,"text":549,"correct":22},"1.4；1.6",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1014273,"下列关于悬挑式脚手架选择和制作的要求中，说法错误的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"型钢悬挑梁悬挑端应设置能使脚手架立杆与钢梁可靠固定的定位点，定位点离悬挑梁端部不应小于100mm",{"key":24,"text":557,"correct":32},"悬挑架的支撑结构应为型钢制作的悬挑梁或悬析架等，也可采用钢管",{"key":27,"text":559,"correct":22},"悬挑架应水平设置在梁上，锚固位置必须设置主梁或主梁以内的楼板上，不得设置在外伸阳台上或悬挑板上",{"key":30,"text":561,"correct":22},"节点的制作必须采用焊接或螺栓连接的结构，不得采用扣件连接",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":30,"analysis":33},1014276,"下列关于悬挑式脚手架选择和制作的要求中，说法正确的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"当型钢悬挑梁与建筑结构采用螺栓钢压板连接固定时，钢压板尺寸不应小于100mm×10mm",{"key":24,"text":569,"correct":22},"当型钢悬挑梁与建筑结构采用螺栓角钢压板连接时，角钢的规格不应小于100mm×100mm×6mm",{"key":27,"text":571,"correct":22},"悬挑梁型号及锚固件应按设计确定，钢梁截面高度不应小于100mm",{"key":30,"text":573,"correct":32},"钢丝绳与建筑结构拉结的吊环应使用HPB235级钢筋，其直径不宜小于20mm",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},1014278,"悬挑式操作平台可分为斜拉方式的悬挑式操作平台和下支承方式的悬挑式操作平台两种方式。下列关于悬挑式操作平台规定的说法中，错误的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"悬挑式操作平台的搁置点、拉结点、支撑点应设置在主体结构上",{"key":24,"text":581,"correct":22},"悬挑式操作平台的悬挑长度不宜大于5m",{"key":27,"text":583,"correct":32},"悬挑式操作平台的外侧应略低于内侧，外侧应安装固定的防护栏杆并应设置防护挡板完全封闭",{"key":30,"text":585,"correct":22},"不得在悬挑式操作平台吊运、安装时上人",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":27,"analysis":33},1014281,"对模板施工单位进行全面的安全技术交底，施工单位应是具有资质的单位。下列关于模板施工的规定中，错误的是（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"现浇钢筋混凝土梁、板，当跨度大于4m时，模板应起拱",{"key":24,"text":593,"correct":22},"当层间高度大于5m时，宜选用桁架支模或多层支架支模",{"key":27,"text":595,"correct":32},"模板安装作业高度超过5m时，才须搭设脚手架或平台",{"key":30,"text":597,"correct":22},"拼装高度为2m以上的竖向模板，不得站在下层模板上拼装上层模板",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":30,"analysis":33},1014284,"现浇柱模板拆除顺序是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"拆除斜撑或拉杆（或钢拉条）→拆除竖楞→自上而下拆除柱箍或横楞",{"key":24,"text":605,"correct":22},"自上而下拆除柱箍或横楞→拆除斜撑或拉杆（或钢拉条）→拆除竖楞",{"key":27,"text":607,"correct":22},"自上而下拆除柱箍或横楞→拆除竖楞→拆除斜撑或拉杆（或钢拉条）",{"key":30,"text":609,"correct":32},"拆除斜撑或拉杆（或钢拉条）→自上而下拆除柱箍或横楞→拆除竖楞",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]