[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-739-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},739,"安全实务-建筑施工安全","建筑工程",0,11,50,791,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,403,412,420,432,444,456,468,480,492,504,513,525,537,549,557,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1013883,1,"单选题","当施工现场与周边架空线路不能保证最小安全距离时，为了确保施工安全，则必须采取设置防护性遮栏、栅栏以及悬挂警告标志牌等防护措施。下列搭设防护屏障的措施中错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","防护遮栏、栅栏的搭设应使用钢管脚手架杆",true,{"key":24,"text":25,"correct":26},"B","搭设防护遮栏、栅栏应有足够的机构强度",false,{"key":28,"text":29,"correct":26},"C","搭设和拆除时应停电作业",{"key":31,"text":32,"correct":26},"D","无法设置遮栏时则应采取停电、迁移外电线路或改变工程位置等","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1013886,"塔式起重机应按规定要求做重复接地和防雷接地。下列关于轨道式塔式起重机接地装置的设置应不符合要求的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"较短轨道可在其轨道一端设一组接地装置",{"key":24,"text":41,"correct":26},"轨道的接头处作电气连接，两条轨道端部作环形电气连接",{"key":28,"text":43,"correct":26},"较长轨道每隔不大于30m加一组接地装置",{"key":31,"text":45,"correct":26},"在强电磁波源附近工作的塔式起重机，操作人员应戴绝缘手套和穿绝缘鞋，并应在吊钩吊装地面物体时，在吊钩上挂接临时接地装置",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1013888,"下列关于配电箱与开关箱的设置要求的说法中，说法错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"总配电箱应设在靠近电源的区域，分配电箱应设在用电设备或负荷相对集中的区域",{"key":24,"text":53,"correct":26},"分配电箱与开关箱的距离不得超过30m，开关箱与其控制的固定用电设备的水平距离不宜超过3m",{"key":28,"text":55,"correct":22},"配电箱、开关箱不得装设在有严重损伤作用的瓦斯、烟气、潮气及其他有害介质中，设置在热源烘烤的场所必须装设通风设备",{"key":31,"text":57,"correct":26},"配电箱、开关箱周围应由足够2人同时工作的空间和通道",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1013890,"关于分配电箱与开关箱之间，开关箱与用电设备之间的压缩配电间距中，说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"分配电箱应设在用电设备或负荷相对分散的场所",{"key":24,"text":65,"correct":26},"分配电箱与开关电箱的距离一般不超过10m",{"key":28,"text":67,"correct":22},"开关箱实行“一机一闸”制",{"key":31,"text":69,"correct":26},"开关箱与其供电的固定式用电设备的水平距离不应超过10m",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1013892,"下列关于配电箱和开关箱电器选择的说法中，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"总配电箱应装设电压表、总电流表、电度表等",{"key":24,"text":77,"correct":26},"总开关器的额定值、动作整定值应与分路开关电器的额定值、动作整定值相适应",{"key":28,"text":79,"correct":26},"隔离开关采用分断时具有可见分断点的断路器，可不另设隔离开关",{"key":31,"text":81,"correct":22},"隔离开关应设置于电源出线端，且采用分断时具有可见分断点，并能同时断开电源所有极的隔离电器",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1013894,"施工现场临时用电工程专用的电源中性点直接接地的220V\u002F380V三相四线制低压电力系统，必须遵守以下三项基本用电原则：①采用三级配电系统；②采用二级漏电保护系统；③采用TN-S接零保护系统。下列关于二级漏电保护系统的说法中，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"总配电箱和分配电箱二级配电装置",{"key":24,"text":89,"correct":26},"分配电箱和开关箱二级配电装置",{"key":28,"text":91,"correct":22},"总配电箱和开关箱二级配电装置",{"key":31,"text":93,"correct":26},"总配电箱中的漏电保护器只可设置在总路",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1013896,"架空线路由导线、架空地线、绝缘子串、塔杆、接地装置等组成。施工现场的架空线路主要是低压架空线路。架空线必须采用绝缘导线。架空线导线截面的要求，下列说法错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"导线中的计算负荷电流不大于其长期连续负荷允许载流量",{"key":24,"text":101,"correct":26},"线路末端电压偏移不大于其额定电压的5%",{"key":28,"text":103,"correct":22},"线路的N线和PE线截面不小于相线截面的80%",{"key":31,"text":105,"correct":26},"单相线路的零线截面与相线截面相同",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1013898,"架空线路由导线、架空地线、绝缘子串、塔杆、接地装置等组成。施工现场的架空线路主要是低压架空线路。下列关于架空线路要求的说法中，错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"架空线必须架设在专用电杆或树木上，严禁架设在脚手架及其他设施上",{"key":24,"text":113,"correct":26},"电杆埋深宜为杆长的1\u002Fl0加0.6m。在松软土质处宜加大埋入深度或采用卡盘等加固",{"key":28,"text":115,"correct":26},"动力、照明线在同一横担上架设时，导线相序排列是，面向负荷从左侧起依次为L1、N、L2、L3、PE",{"key":31,"text":117,"correct":26},"动力、照明线在二层横担上分别架设时，导线相序排列是，上层横担面向负荷从左侧起依次为L1、L2、L3，下层横担面向负荷从左侧起依次为L1（L2、L3）、N、PE",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1013900,"施工现场的电气系统应满足用电设备对供电可靠性、供电质量及供电安全的要求，接线方式应力求简单可靠，操作方便及安全。城市中高压输电的电压一般为10kv，通常用电设备的额定电压一般为220w380v。利用附近高压电网，增设变压器等配套设备进行220v\u002F380V供电的形式属于（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"独立变配电所供电",{"key":24,"text":125,"correct":22},"自备变压器供电",{"key":28,"text":127,"correct":26},"电压220V\u002F380V供电",{"key":31,"text":129,"correct":26},"借用电源",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1013902,"下列关于架空线导线截面的要求说法中，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"按机械强度要求，绝缘铜线截面最小10mm2",{"key":24,"text":137,"correct":26},"按机械强度要求，绝缘铝线截面最小16mm2",{"key":28,"text":139,"correct":26},"在跨越铁路、公路、河流、电力线路档距内，绝缘铜线截面最小16mm2",{"key":31,"text":141,"correct":22},"在跨越铁路、公路、河流、电力线路档距内，绝缘铝线截面最小35mm2",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1013907,"工作接地是指将电力系统的某点（如中性点）直接与大地相连，中性点接地电阻应符合规范的要求，下列关于接地电阻的要求中，正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"单台容量不超过100kVA或使用同一接地装置并联运行且总容量不超过100kVA的电力变压器或发电机的工作接地电阻值不得大于4Ω",{"key":24,"text":149,"correct":26},"单台容量超过100kVA或使用同一接地装置并联运行且总容量超过100kVA的电力变压器或发电机的工作接地电阻值不得大于30Ω",{"key":28,"text":151,"correct":22},"在土壤电阻率大于1000Ω·m的地区，当达到上述接地电阻值有困难时，工作接地电阻值可提高到30Ω",{"key":31,"text":153,"correct":26},"在土壤电阻率大于1000Ω·m的地区，当达到上述接地电阻值有困难时，工作接地电阻值可提高到100Ω",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1013910,"三级配电系统是指施工现场从电源进线开始到用电设备之间，经过三级配电装置配送电力。在实施三级配电系统时，应遵循分级分路、动照分设、压缩配电间距的原则。下列关于三级配电系统的说法中正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"总配电箱（配电柜）可以分若干分路向若干分配电箱配电；每一分路也可分支支接若干分配电箱",{"key":24,"text":161,"correct":26},"开关箱可以分若干分路向若干分配电箱配电，每一分路也可以支接或链接若干分配电箱，但链接线路的总长度不得超过30m",{"key":28,"text":163,"correct":26},"分配电箱向用电设备配电不得分路，实行“一机一闸”制，每一台用电设备必须有其独立专用的分配电箱",{"key":31,"text":165,"correct":26},"总配电箱、开关箱内动力与照明合置共箱配电，动力与照明必须分路配电，分配电箱的分路应动照分设，设置动力开关箱和照明开关箱",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1013913,"人工接地体可用垂直埋置的角钢、圆钢或钢管，以及水平埋置的圆钢、扁钢等。当土壤有强烈腐蚀性时，应将接地体表面镀锡或热镀锌，并适当加大截面。下列关于人工接地体的要求说法中，错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"角钢尺寸一般为40mm×40mm×4mm或50mm×50mm×5mm",{"key":24,"text":173,"correct":26},"每一接地装置的接地线应采用2根及以上，在不同点与接地体做电气连接",{"key":28,"text":175,"correct":26},"不得采用铝导体做接地体或地下接地线",{"key":31,"text":177,"correct":22},"垂直接地体宜采用螺纹钢，以增大接触面积",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1013915,"配电箱、开关箱应采用冷轧钢板或阻燃绝缘材料制作，钢板厚度应为1.2~2.0mm，箱体表面应做防腐处理。下列关于配电箱与开关箱的构造要求说法错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"移动式配电箱、开关箱应装设在坚固的支架上",{"key":24,"text":185,"correct":26},"配电箱、开关箱内的电器（含插座）应先紧固在金属或非木质阻燃绝缘电器安装板上，金属电器安装板与金属箱体应做电气连接",{"key":28,"text":187,"correct":22},"配电箱的PE线端子板必须与金属电器安装板绝缘；N线端子板必须与金属电器安装板做电气连接",{"key":31,"text":189,"correct":26},"配电箱、开关箱内的连接线必须采用铜芯绝缘导线",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1013917,"为了使接闪器截获直接雷击的雷电流或通过防雷器的雷电流安全泄放人地，以保护建筑物、建筑物内人员和设备安全的接地称为防雷接地。接地装置是由（ ）构成。",[194,196,198,200],{"key":20,"text":195,"correct":26},"接闪器、连接用的接地线和埋入土中的接地体",{"key":24,"text":197,"correct":26},"接闪器和连接用的接地线",{"key":28,"text":199,"correct":22},"连接用的接地线和埋入土中的接地体",{"key":31,"text":201,"correct":26},"埋入土中的接地体",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1013920,"手持电动工具的防触电保护可分为3类，各类手持电动工具使用时对附加安全措施的装接要求不同。下列关于手持电动工具装接保护接地的说法中，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"I类设备可以装接保护接地，也可不装接保护接地",{"key":24,"text":209,"correct":26},"I类设备不允许装接保护接地",{"key":28,"text":211,"correct":26},"l类设备必须装接保护接地",{"key":31,"text":213,"correct":22},"lll类设备不须要装接保护接地",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1013923,"施工现场在特殊场所使用的照明器应使用安全电压，下列关于施工现场照明使用的安全电压值描述正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"隧道、人防工程、高温、有导电灰尘或灯具离地面高度低于2.5m等场所的照明，电源电压不应大于24V",{"key":24,"text":221,"correct":26},"在潮湿和易触及带电体场所的照明电源电压不得大于36V",{"key":28,"text":223,"correct":26},"在特别潮湿的场所、导电良好的地面、锅炉或金属容器内工作的照明，电源电压不得大于6V",{"key":31,"text":225,"correct":22},"移动式照明器（如行灯）的照明电源电压不得大于36V",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1013925,"接地装置包括埋入土中的接地体，接地体可分为自然接地体和人工接地体两类。下列不属于自然接地体的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"埋在地下的金属自来水管",{"key":24,"text":233,"correct":22},"埋在地下的金属燃气管道",{"key":28,"text":235,"correct":26},"建筑物和构筑物与大地接触的或水下的金属结构",{"key":31,"text":237,"correct":26},"建筑物的钢筋混凝土基础等",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1013928,"下列关于临时用电施工组织设计的要求中，说法错误的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"临时用电工程图纸应与主体工程图纸一同绘制，临时用电工程应按图施工",{"key":24,"text":245,"correct":26},"临时用电施工组织设计及变更必须履行“编制、审核、批准”程序",{"key":28,"text":247,"correct":26},"临时用电工程必须经编制、审核、批准部门和使用单位共同验收，合格后方可投入使用",{"key":31,"text":249,"correct":26},"对于小型工地（现场临时用电设备5台以下或者设备总容量在50kw以下），可不编制临时用电施工组织设计，但仍要编制安全用电措施和电器防火措施，并且履行“编制、审核、批准、验收”的管理程序",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1013931,"电缆线路的造价比架空线路高，但其不用架设杆塔，占地少，供电可靠，极少受外力破坏，对人身安全。下列关于电缆线路说法中，错误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"室外电缆的敷设分为埋地和架空两种方式，以埋地敷设为宜",{"key":24,"text":257,"correct":26},"电缆中必须包含全部工作芯线和用作保护零线或保护线的芯线",{"key":28,"text":259,"correct":26},"需要三相四线制配电的电缆线路必须采用五芯电缆",{"key":31,"text":261,"correct":22},"五芯电缆淡蓝色必须用作PE线，绿\u002F黄双色芯线必须用作N线，严禁混用",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1013934,"电缆线路采用埋地敷设时，应避免机械损伤和介质腐蚀，下列不符合电缆线路埋地敷设规定的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"埋地敷设宜选用铠装电缆，当选用无铠装电缆时，应能防水、防腐",{"key":24,"text":269,"correct":26},"电缆直接埋地敷设的深度不小于0.7m，并应在电缆紧邻上、下、左、右侧均匀敷设不小于50mm厚的细砂",{"key":28,"text":271,"correct":26},"埋地电缆在引出地面从2.0m高到地下0.2m处，必须加设防护套管，防护套管内径不应小于电缆外径的1.5倍",{"key":31,"text":273,"correct":22},"埋地电缆与其附近外电电缆和管沟的平行间距不得小于lm，交叉间距不得小于0.5m",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1013937,"下列开关箱和总配电箱（配电柜）内配置漏电保护器的漏电动作参数说法中，错误的是（ ）。 A.开关箱中的漏电保护器，一般场所其额定漏电动作电流为不大于30m A，额定漏电动作时间为不大于0.1s B.Ⅰ类和Ⅱ类（非塑料外壳）手持电动工具其额定漏电动作电流为不大于15m A，额定漏电动作时间不大于0.1s",[278,280,282,284],{"key":20,"text":279,"correct":26},"施工降水、夯实、振捣、地面抹光（水磨石）、水泵供水场所其额定漏电动作电流为不大于15m",{"key":24,"text":281,"correct":26},"额定漏电动作时间不大于0.1s",{"key":28,"text":283,"correct":26},"总配电箱中的漏电保护器，其额定漏电动作电流为不大于30m",{"key":31,"text":285,"correct":22},"额定漏电动作时间应不大于0.1s，其额定漏电动做电流与额定漏电动作时间的乘积不超过安全界限值30mA·S",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},1013940,"在施工现场用电工程专用的电源中性点直接接地的220V\u002F380V三相四线制低压电力系统中，必须采用TN-S接零保护系统。下列关于TN-S系统的说法中错误的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"TN-S系统为电源中性点直接接地时，电气设备外露可导电部分通过零线接地的接零保护系统，即设备外壳连接到PE线上",{"key":24,"text":293,"correct":26},"当施工现场与外电线路共用同一供电系统时，电气设备的接地、接零保护应与原系统保持一致。不得一部分设备作保护接零，另一部分设备作保护接地",{"key":28,"text":295,"correct":22},"当采用TN系统做保护接零时，保护零线（PE线）必须通过总漏电保护器，工作零线（N线）必须由电源进线零线重复接地处或总漏电保护器电源侧零线处引出形成局部TN-S接零保护系统",{"key":31,"text":297,"correct":26},"TN-S系统是把工作零线N和专用保护线PE严格分开的供电系统，PE线上没有电流，只是N线上有不平衡电流",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1013942,"施工现场配电线路包括室外线路和室内线路。下列不属于施工现场常见敷设方式的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"室外绝缘导线架空敷设",{"key":24,"text":305,"correct":22},"室外裸露导线埋地敷设",{"key":28,"text":307,"correct":26},"室内绝缘导线明敷",{"key":31,"text":309,"correct":26},"室内绝缘电缆暗敷",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1013945,"为了保证施工不因停电而中断，有的施工现场备有发动机组，作为外线电路停止供电时的接续供电电源，这就是自备电源。下列关于自备发配电系统的规定，错误的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"发电机组电源必须与外电线路电源连锁，并设置同期装置，在同步运行后方可并列运行",{"key":24,"text":317,"correct":26},"发电机组并列运行时，必须装设同期装置，并在机组同步运行后再向负载供电",{"key":28,"text":319,"correct":26},"电源隔离开关分断时应由明显可见分断点",{"key":31,"text":321,"correct":26},"发电机供电系统应设置电源隔离开关及短路、过载、漏电保护电器",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},1013947,"施工现场的一台塔式起重机与10kV外架空线路临近，其沿水平方向的最小安全距离为（）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"0.5m",{"key":24,"text":329,"correct":26},"1m",{"key":28,"text":331,"correct":26},"1.5m",{"key":31,"text":333,"correct":22},"2m",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1013950,"电气设备的外壳防护等级用“IP＋数字＋数字”表示。下列对标志含义的解释中，正确的是（）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"“IP45”表示“防止工具接近危险部件，防止直径不小于2.5mm固体异物；防喷水”",{"key":24,"text":341,"correct":22},"“IP34”表示“防止工具接近危险部件防止直径不小于2.5mm固体异物；防淋水”",{"key":28,"text":343,"correct":26},"“IP65”表示“防止直径不小于1.0mm的金属线接近危险部件，尘密；防短时间浸水”",{"key":31,"text":345,"correct":26},"“IP51”表示“防止直径不小于1.0mm的金属线接近危险部件，防尘；防止垂直方向滴水”",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1013953,"在土壤电阻率大于1000Ω·m的地区，当达到接地电阻值有困难时，工作接地电阻值可提高到（ ）Ω。",[350,352,354,356],{"key":20,"text":351,"correct":26},"20",{"key":24,"text":353,"correct":22},"30",{"key":28,"text":355,"correct":26},"50",{"key":31,"text":357,"correct":26},"60",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1013956,"配电柜后面的维护通道宽度，双列背对背布置时不应小于（ ）m。",[362,364,366,368],{"key":20,"text":363,"correct":26},"0.8",{"key":24,"text":365,"correct":26},"1.0",{"key":28,"text":367,"correct":22},"1.5",{"key":31,"text":369,"correct":26},"2.0",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},1013959,"施工现场的机动车道上有一条400V架空线路，交叉时的最小垂直距离应为（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"4m",{"key":24,"text":377,"correct":26},"5m",{"key":28,"text":379,"correct":22},"6m",{"key":31,"text":381,"correct":26},"7m",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1013962,"临时用电设备在（ ）台及以上或设备总容量在（ ）kW及以上者，应编制临时用电施工组织设计。",[386,388,390,392],{"key":20,"text":387,"correct":26},"3，30",{"key":24,"text":389,"correct":26},"3，50",{"key":28,"text":391,"correct":26},"5，30",{"key":31,"text":393,"correct":22},"5，50",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1013965,"配电柜正面的操作通道宽度，单列布置时不小于（ ）m。",[398,399,401,402],{"key":20,"text":367,"correct":22},{"key":24,"text":400,"correct":26},"0.5",{"key":28,"text":365,"correct":26},{"key":31,"text":369,"correct":26},{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1013968,"在建工程的周边与外电架空线路的边线之间应符合安全操作距离。现场有一脚手架，其临近外电架空线路为10kV高压线路，脚手架与外电架空线路的安全距离为（ ）。",[407,408,409,410],{"key":20,"text":333,"correct":26},{"key":24,"text":375,"correct":26},{"key":28,"text":379,"correct":22},{"key":31,"text":411,"correct":26},"8m",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},1013971,"建设项目电器设备容量小，施工周期短时，可以采用的施工现场供电形式是（ ）。",[416,417,418,419],{"key":20,"text":123,"correct":26},{"key":24,"text":125,"correct":26},{"key":28,"text":127,"correct":26},{"key":31,"text":129,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},1013974,"为了节约投资，在计算负荷不是特别大的情况下，施工现场的临时用电均采用户外式变电所，户外变电所又采用（ ）居多。",[424,426,428,430],{"key":20,"text":425,"correct":22},"杆上变电所",{"key":24,"text":427,"correct":26},"独立式变电所",{"key":28,"text":429,"correct":26},"附设式变电所",{"key":31,"text":431,"correct":26},"成套式户内变电所",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},1013977,"在建筑施工中，高处作业主要有临边作业、洞口作业、悬空作业、交叉作业、攀登作业等，进行高处作业时必须做好必要的安全防护措施。施工现场，在无立足点或无牢靠立足点的条件下，进行的高处作业称为（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":26},"临边作业",{"key":24,"text":439,"correct":26},"洞口作业",{"key":28,"text":441,"correct":22},"悬空作业",{"key":31,"text":443,"correct":26},"攀登作业",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},1013979,"建设工程施工现场悬挑式钢平台由于吊环节点设置不科学、不合理，导致悬挑式钢平台坠落的生产安全事故时有发生。下列关于悬挑式钢平台安全技术要求的说法中，错误的是（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":26},"悬挑式钢平台每次进场、组装、安装前，均应对安装作业有关人员实行书面安全技术交底",{"key":24,"text":451,"correct":26},"在使用前交底人应组织有关人员，依据专项施工方案与安全技术交底内容进行验收",{"key":28,"text":453,"correct":26},"遇有六级（含）以上大风或恶劣天气，必须停止悬挑式钢平台安装作业",{"key":31,"text":455,"correct":22},"平台上严禁2人同时作业",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":28,"analysis":33},1013981,"建筑物或构筑物在施工过程中，常会出现各种预留洞口、通道口、上料口、楼梯口、电梯井口，在其附近工作，称为洞口作业。下列关于水平洞口防护的说法中，错误的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":26},"当洞口短边边长为25~500mm时，应采用盖板覆盖",{"key":24,"text":463,"correct":26},"当洞口短边边长为500~1500mm时，应采用盖板覆盖或防护栏杆",{"key":28,"text":465,"correct":22},"当洞口短边边长大于或等于1500mm时，应采用盖板覆盖或防护栏杆，采用防护栏时洞口应采用安全平网封闭",{"key":31,"text":467,"correct":26},"洞口盖板应能承受不小于1kN的集中荷载和不小2kN\u002Fm2的均布荷载，有特殊要求的盖板应另行设计",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1013984,"下列关于剪力墙结构体系中悬挑式钢平台设置不符合要求的是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":26},"每侧上下各两个吊点（2根钢丝绳）须独立设置，不得采用钢丝绳从平台下兜底的方式",{"key":24,"text":475,"correct":22},"平台三面临边应设置围挡，栏杆防护高度为1.2m，且用硬质材料设置，严禁开孔",{"key":28,"text":477,"correct":26},"平台满铺50mm厚的木板且固定",{"key":31,"text":479,"correct":26},"严禁使用花篮螺栓调节钢丝绳松紧",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1013988,"作业高度分为2~5m，5~15m，15~30m及＞30m四个区域。这四个区域被称为（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":26},"一级高处作业、二级高处作业、三级高处作业、四级高处作业",{"key":24,"text":487,"correct":22},"一级高处作业、二级高处作业、三级高处作业、特级高处作业",{"key":28,"text":489,"correct":26},"A级高处作业、B级高处作业、C级高处作业、D级高处作业",{"key":31,"text":491,"correct":26},"Ⅰ级高处作业、Ⅱ级高处作业、Ⅲ级高处作业、Ⅳ级高处作业",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},1013990,"悬空高处作业人员应系挂安全带、佩戴工具袋。严禁在未固定、无防护的构件及安装中的管道上作业或通行。下列关于悬空作业的要求中，错误的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"模板支撑应按规定的程序进行，不得在连接件和支撑杆件上攀登上下，在上下同一垂直面上装拆模板时应采取安全防护措施",{"key":24,"text":499,"correct":26},"绑扎立柱和墙体钢筋，不得站在钢筋骨架上或攀登骨架",{"key":28,"text":501,"correct":26},"悬挑的混凝土梁和檐、外墙和边柱等结构施工时，应搭设脚手架或操作平台，并应设置防护栏杆，采用密目式安全立网封闭",{"key":31,"text":503,"correct":26},"在坡度大于1:2.2的屋面上作业，当无外脚手架时，应在屋檐边设置不低于1.5m高的防护栏杆，并应采用密目式安全立网全封闭",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},1013993,"安装平网三要是素负载高度、网的宽度和缓冲的距离，使用3m宽的安全平网时，网底距下方物体表面不得小子（ ）。",[508,509,510,512],{"key":20,"text":329,"correct":26},{"key":24,"text":333,"correct":26},{"key":28,"text":511,"correct":22},"3m",{"key":31,"text":377,"correct":26},{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1013996,"密目式安全立网网体上不应有断纱、破洞、变形及有碍使用的编织缺陷。下列关于安全立网的技术要求中，说法错误的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"缝线不应有跳针、漏缝，缝边应均匀",{"key":24,"text":520,"correct":22},"每张密目网不应有缝接",{"key":28,"text":522,"correct":26},"开眼环扣孔径不应小于8mm",{"key":31,"text":524,"correct":26},"系绳断裂强力不应小于2000N",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},1013999,"安全网搭设应牢固、严密、完整有效、易于拆卸。安全网的支撑架应具有足够的强度和稳定性。下列关于安全网搭设的要求中，说法正确的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":26},"密目式安全立网搭设时，系绳应绑扎在支撑架上，间距不得大于200mm",{"key":24,"text":532,"correct":26},"当立网用于龙门架、物料提升架及井架的封闭防护时，系绳应绑在支架上，间距不得大于450mm",{"key":28,"text":534,"correct":26},"用于电梯、钢结构和框架结构及构筑物封闭防护的平网，系绳沿网边均匀分布，间距不得大于450mm",{"key":31,"text":536,"correct":22},"电梯井内平网网体与井壁的空隙不得大于25mm",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":28,"analysis":33},1014002,"下列关于电梯井的防护措施中，说法正确的是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":26},"电梯井首层应设置一层水平安全网",{"key":24,"text":544,"correct":26},"施工层及其他每隔三层且不大于10m设一道水平安全网",{"key":28,"text":546,"correct":22},"施工层的下一层的井道内设置一道硬质隔断以防物件掉落",{"key":31,"text":548,"correct":26},"施工层的下一层的勾头螺栓上架设两根横向钢管，两根纵向钢管，并在钢管框架上满铺脚手板",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1014005,"在建筑施工中，高处作业主要有临边作业、洞口作业、悬空作业、交叉作业、攀登作业等，进行高处作业时必须做好必要的安全防护措施。在施工现场，借助于登高用具或登高设施，在攀登条件下进行的高处作业，称为（ ）。",[553,554,555,556],{"key":20,"text":437,"correct":26},{"key":24,"text":439,"correct":26},{"key":28,"text":441,"correct":26},{"key":31,"text":443,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1014008,"下列关于安全帽技术性能说法错误的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"帽壳与帽衬之间有15～25mm的间隙",{"key":24,"text":564,"correct":26},"普通安全帽不得超过430g；防寒安全帽不超过600g",{"key":28,"text":566,"correct":26},"当帽壳留有通气孔时，通气孔总面积为150~450mm2",{"key":31,"text":568,"correct":26},"在高温、低温等情况下，传递到头模上的力不超过4900N",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1014011,"坠落悬挂安全带的伸展长度或坠落距离不应大于产品标识的数值。坠落停止后，织带或绳在调节扣内的滑移不应大于（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":26},"15mm",{"key":24,"text":576,"correct":22},"25mm",{"key":28,"text":578,"correct":26},"35mm",{"key":31,"text":580,"correct":26},"45mm",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},1014014,"安装平面垂直于水平面，主要用来防止人或物坠落的安全网称为（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":26},"平网",{"key":24,"text":588,"correct":26},"横网",{"key":28,"text":590,"correct":22},"立网",{"key":31,"text":592,"correct":26},"竖网",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},1014017,"卸料平台属危险性较大的分部分项工程，施工单位应编制专项施工方案，严格按照方案进行施工施工。下列关于卸料平台的要求中，说法错误的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":26},"槽钢、钢丝绳、钢管如有严重腐蚀、压扁或裂纹的，禁止使用",{"key":24,"text":600,"correct":26},"为防止卸料平台外倾，提高平台的整体稳定性，应设置备用的安全钢丝绳",{"key":28,"text":602,"correct":26},"地面上遇六级（含六级）以上大风时，卸料平台停止使用",{"key":31,"text":604,"correct":22},"建筑高度在300m以上的卸料平台底部应增加防风上吸的防护栏杆",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]