[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1014623":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1014623,739,2,"多选题","土石方开挖时，采用复合土钉支护的基坑开挖施工应符合下列要求（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","基坑开挖应与土钉施工分层交替进行，应缩短元支护暴露时间",true,{"key":16,"text":17,"correct":18},"B","面积较大的基坑先挖除基坑中部的土方，再挖除距基坑边8～10m的土方",false,{"key":20,"text":21,"correct":14},"C","应在土钉养护时间达到设计要求后开挖下一层土方",{"key":23,"text":24,"correct":14},"D","应采用分层分段方法进行土方开挖，每层土方开挖的底标高应低于相应土钉位置，且距离不宜大于200mm",{"key":26,"text":27,"correct":14},"E","隔水帷幕的强度和龄期应达到设计要求后方可进行土方开挖","ACDE","本题考查的是土石方开挖。选项B说法错误，面积较大的基坑可采用岛式开挖方式，先挖除距基坑边8～10m的土方，再挖除基坑中部的土方。",{"id":6,"name":31,"category":32,"favorite":33},"安全实务-建筑施工安全","建筑工程",0]