[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1014369":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1014369,739,1,"单选题","暗挖车站常用施工方法包括PBA法、CRD法、双侧壁导坑法、中洞法、侧洞法、柱洞法等施工方法。施工中先开挖两侧部分，在侧洞内施作梁、柱结构，然后再开挖中间部分，并逐渐将中洞顶部荷载通过初期支护转移到梁、柱结构上的施工方法，属于（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","PBA法",false,{"key":16,"text":17,"correct":14},"B","CRD法",{"key":19,"text":20,"correct":14},"C","中洞法",{"key":22,"text":23,"correct":24},"D","侧洞法",true,"侧洞法施工就是先开挖两侧部分，在侧洞内做梁、柱结构，然后再开挖中间部分，并逐渐将中洞顶部荷载通过初期支护转移到梁、柱结构上。这种施工方法，在处理中间顶部荷载转移时，相对中洞法要困难些。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-建筑施工安全","建筑工程",0]