[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1013550":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1013550,739,1,"单选题","实行施工总承包的项目，施工单位编制的施工组织设计应由（）审批。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工单位项目负责人",false,{"key":16,"text":17,"correct":18},"B","总包单位技术负责人",true,{"key":20,"text":21,"correct":14},"C","总包单位负责人",{"key":23,"text":24,"correct":14},"D","建设单位项目负责人","",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-建筑施工安全","建筑工程",0]