[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1013501":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1013501,739,1,"单选题","某建筑工程企业为加强应急管理工作，按照有关规定开展了应急预案的编制工作，下列有关应急预案编制工作的做法中，错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","成立以企业主要负责人为领导的应急预案编制小组",false,{"key":16,"text":17,"correct":14},"B","该建筑企业辨识出的主要事故类型有高处坠落.物体打击.坍塌等",{"key":19,"text":20,"correct":14},"C","应急预案编制小组对该企业应急装备.应急队伍等应急能力进行评估",{"key":22,"text":23,"correct":24},"D","应急预案编制完成后，该企业负责人组织有关部门和人员进行内审后签署发布",true,"应急预案编制完成后，生产经营单位应组织评审。评审分为内部评审和外部评审，内部评审由生产经营单位主要负责人组织有关部门和人员进行。外部评审由生产经营单位组织外部有关专家和人员进行评审。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-建筑施工安全","建筑工程",0]