[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1013394":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1013394,739,1,"单选题","下列不属于城市轨道交通地下工程施工风险管理实施的主要阶段的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工准备期",false,{"key":16,"text":17,"correct":14},"B","施工期",{"key":19,"text":20,"correct":14},"C","车辆及机电系统安装与调试",{"key":22,"text":23,"correct":24},"D","验收完成正式投产",true,"城市轨道交通地下工程施工风险管理实施的主要阶段： (1)施工准备期。 (2)施工期。 (3)车辆及机电系统安装与调试。 (4)试运行和竣工验收。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-建筑施工安全","建筑工程",0]