[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1013352":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1013352,739,1,"单选题","下列关于模板载荷规定说法错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","对于承载能力极限状态，荷载组合应按荷载效应的基本组合采用",false,{"key":16,"text":17,"correct":14},"B","荷载分项系数：永久荷载为1.2，活荷载为1.4",{"key":19,"text":20,"correct":21},"C","对结构表面外露的模板，其最大变形值不得超过模板构件计算跨度的1\u002F1000",true,{"key":23,"text":24,"correct":14},"D","对于正常使用极限状态荷载组合应采用标准组合","当验算模板及其支架的刚度时，规定其最大变形值不得超过下列容许值：对结构表面外露的模板，为模板构件计算跨度的1\u002F400；",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-建筑施工安全","建筑工程",0]