[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1013091":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1013091,739,1,"单选题","某建筑公司项目遇到的土质情况需要用镐或撬棍、大锤挖掘，部分使用爆破方法，则该项目的土质情况为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","三类土（坚土）",false,{"key":16,"text":17,"correct":14},"B","四类土（砂砾坚土）",{"key":19,"text":20,"correct":21},"C","五类土（软石）",true,{"key":23,"text":24,"correct":14},"D","六类土（次坚石）","",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-建筑施工安全","建筑工程",0]