[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-736-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},736,"安全实务-化工安全","建筑工程",0,9,50,859,[13,34,46,58,70,82,94,106,118,126,138,150,162,174,186,198,210,222,234,245,257,269,281,292,304,316,328,340,352,360,372,380,392,404,416,428,440,452,464,472,480,492,504,516,528,540,552,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1005616,1,"单选题","危险与可操作性研究(HAZOP)是一种定性安全评价方法。它的基本过程是以关键词为引导，找出工艺过程中的偏差，然后分析找出偏差的原因、后果及可采取的对策。以下图纸资料中，属于开展HAZOP分析必需的基础资料是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","总平面布置图",false,{"key":24,"text":25,"correct":22},"B","设备安装图",{"key":27,"text":28,"correct":22},"C","逃生路线布置图",{"key":30,"text":31,"correct":32},"D","管道仪表流程图",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1005618,"某化工工程设计公司为电厂化学水车间设计管道布置图，当输送水和盐酸的管道需并列敷设时，盐酸的管道应敷设在水管道的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"内侧或下方",{"key":24,"text":41,"correct":22},"外侧或上方",{"key":27,"text":43,"correct":32},"外侧或下方",{"key":30,"text":45,"correct":22},"内侧或上方",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1005621,"下列危险化学物料禁止一起储存的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"高氯酸钾与高氯酸钠",{"key":24,"text":53,"correct":32},"高氯酸钾与硫黄",{"key":27,"text":55,"correct":22},"碳酸钠与氯化钠",{"key":30,"text":57,"correct":22},"氯化钠与氯化钾",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1005624,"对压力容器进行气压试验时，应当先缓慢升压至规定试验压力的（ ），保压足够时间，并且对所有焊缝和连接部位进行初次检查；如无泄漏可继续升压到规定试验压力的（ ）；如无异常现象，其后按照规定试验压力的（ ）逐级升压，直到试验压力，保压足够时间；然后降至设计压力，保压足够时间进行检查，检查期间压力应当保持不变。",[62,64,66,68],{"key":20,"text":63,"correct":22},"10%，10%，10%",{"key":24,"text":65,"correct":32},"10%，50%，10%",{"key":27,"text":67,"correct":22},"10%，50%，20%",{"key":30,"text":69,"correct":22},"10%，60%，10%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1005626,"对管道进行液压试验时，环境温度不宜低于（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"-5℃",{"key":24,"text":77,"correct":32},"5℃",{"key":27,"text":79,"correct":22},"-2℃",{"key":30,"text":81,"correct":22},"2℃",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1005629,"对管道工程进行质量检验时，焊缝内部质量的检验通过无损检测方法来判别。对有延迟裂纹倾向的材料，无损检测应至少在焊接完成（ ）后进行。",[86,88,90,92],{"key":20,"text":87,"correct":22},"12h",{"key":24,"text":89,"correct":32},"24h",{"key":27,"text":91,"correct":22},"48h",{"key":30,"text":93,"correct":22},"72h",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1005632,"关于化工建设项目施工质量的控制，说法错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"在施工过程中，施工单位必须严格执行批准的施工方案，未经批准，不得擅自改变施工方案进行施工",{"key":24,"text":101,"correct":32},"在施工过程中，业主代表、监理代表和质量控制人员无权对工程质量有怀疑的部位进行剥露、凿洞或挖孔检查",{"key":27,"text":103,"correct":22},"隐蔽工程未经监理工程师或建设单位专业技术负责人检查认可，不应进行下道工序施",{"key":30,"text":105,"correct":22},"各施工工序应按施工技术文件进行质量控制，每道施工工序完成后，应进行检验、专业工种之间的相关工序应进行交接检验，并形成记录，合格后方可进行下道工序施工",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1005634,"设备超压时能自动排放介质降低压力的装置为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"联锁装置",{"key":24,"text":113,"correct":22},"警报装置",{"key":27,"text":115,"correct":22},"计量装置",{"key":30,"text":117,"correct":32},"泄压装置",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1005636,"设备运行过程中出现不安全因素致使其处于危险状态时，能自动发出声光或其他明显报警信号的仪器是（ ）。",[122,123,124,125],{"key":20,"text":111,"correct":22},{"key":24,"text":113,"correct":32},{"key":27,"text":115,"correct":22},{"key":30,"text":117,"correct":22},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},1005640,"在HAZOP的分析引导词中，设计或操作要求的指标和事件完全不发生，如无流量、无催化剂指的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":32},"空白",{"key":24,"text":133,"correct":22},"部分",{"key":27,"text":135,"correct":22},"相逆",{"key":30,"text":137,"correct":22},"异常",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1005642,"化工厂在进行压缩机布置时，压缩机的附近应有供检修、消防用的通道，机组与通道边的距离应大于或等于（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"3m",{"key":24,"text":145,"correct":22},"4m",{"key":27,"text":147,"correct":32},"5m",{"key":30,"text":149,"correct":22},"10m",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},1005645,"在化工厂设计总平面布置时，留有足够的防火间距，目的在于防止火灾的蔓延以减少灾害损失。防火间距的确定，应以生产的火灾危险性的大小及其特点来综合评定。其考虑原则不包括（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"发生火灾时，直接与其相邻的装置或设施不会受到火焰加热",{"key":24,"text":157,"correct":22},"邻近装置中的可燃物（或者厂房），不会被辐射热引燃",{"key":27,"text":159,"correct":32},"邻近装置中不被爆炸影响",{"key":30,"text":161,"correct":22},"要考虑燃烧着的液体从火灾地点流不到或者飞散不到其他地点的距离",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},1005648,"化工企业厂区总平面应根据厂内各生产系统及安全、环保、职业健康要求进行功能明确、分区合理的布置，分区内部和相互之间保持一定的通道和间距。为防止可燃有毒气体的弥漫并迅速排放，厂区的长轴与主导风向最好垂直或不小于（ ）夹角。",[166,168,170,172],{"key":20,"text":167,"correct":22},"30°",{"key":24,"text":169,"correct":32},"45°",{"key":27,"text":171,"correct":22},"60°",{"key":30,"text":173,"correct":22},"75°",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},1005650,"下列地段和地区可以选为厂址的有（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":32},"发震断层和抗震设防烈度为6度的地区",{"key":24,"text":181,"correct":22},"蓄滞洪区、坝或堤愤决后可能淹没的地区",{"key":27,"text":183,"correct":22},"危及机场净空保护区的区域",{"key":30,"text":185,"correct":22},"水资源匮乏的地区",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1005653,"对压力容器进行液压试验时，试验温度（容器器壁金属温度）应当比容器器壁金属元延性转变温度高（ ），或者按照规程引用标准的规定执行。",[190,192,194,196],{"key":20,"text":191,"correct":22},"25℃",{"key":24,"text":193,"correct":32},"30℃",{"key":27,"text":195,"correct":22},"35℃",{"key":30,"text":197,"correct":22},"65℃",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1005656,"管道的泄漏性试验应按设计文件的规定进行，下列规定说法错误的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"对输送极度和高度危害流体以及可燃流体的管道，必须进行泄漏性试验",{"key":24,"text":205,"correct":22},"泄漏性试验应在压力试验合格后进行且试验介质宜采用空气",{"key":27,"text":207,"correct":32},"泄漏性试验压力应为设计压力的1.2倍",{"key":30,"text":209,"correct":22},"真空系统在压力试验合格后，应按设计文件规定进行24h的真空度试验，增压率不应大于5%",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},1005659,"埋地钢管道的试验压力应为设计压力的（ ）倍，并不得低于（ ）MPa。",[214,216,218,220],{"key":20,"text":215,"correct":32},"1.5，0.4",{"key":24,"text":217,"correct":22},"1.5，0.8",{"key":27,"text":219,"correct":22},"2.5，0.4",{"key":30,"text":221,"correct":22},"2.5，0.8",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},1005662,"现场条件不允许进行管道液压和气压试验时，可同时采用无损检测、管道系统柔性分析和泄漏试验代替压力试验，但应经建设单位和设计单位同意。替代方法如下：所有环向、纵向对接焊缝和螺旋焊焊缝，应进行100%射线检测或（ ）；其余的所有焊缝，应进行100%的渗透检测或100%的磁粉检测。",[226,228,230,232],{"key":20,"text":227,"correct":22},"100%的渗透检测",{"key":24,"text":229,"correct":22},"100%的磁粉检测",{"key":27,"text":231,"correct":32},"100%超声检测",{"key":30,"text":233,"correct":22},"100%的渗透检测和100%的磁粉检测",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1005665,"下列关于化工建设项目施工质量的控制，说法错误的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"从事化工建设工程项目安装工程施工的单位应具备相应的资质等级，并在其资质等级许可的范围内承揽工程",{"key":24,"text":241,"correct":22},"实行总承包的工程，总承包单位应对承包的工程施工质量全面负责，建立项目质量管理体系",{"key":27,"text":243,"correct":32},"项目开工前，施工承包商必须提交施工组织设计报设计单位审批",{"key":30,"text":99,"correct":22},{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":30,"analysis":33},1005667,"跟踪HAZOP进行整改是不可避免的。在某些适当的阶段，应对项目进行进一步的审查，最好由原来的负责人负责进一步的审查工作。这种审查目标不包含（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"确保所有的整改不损害原来的评估",{"key":24,"text":252,"correct":22},"审查资料，特别是制造商的数据",{"key":27,"text":254,"correct":22},"确保已经执行了所有提出的推荐措施",{"key":30,"text":256,"correct":32},"确保所有的成员知道并且对采取有关的措施形成一致意见",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":30,"analysis":33},1005670,"HAZOP是（ ）分析方法的缩写。",[261,263,265,267],{"key":20,"text":262,"correct":22},"保护层分析",{"key":24,"text":264,"correct":22},"安全仪表系统",{"key":27,"text":266,"correct":22},"系统分析",{"key":30,"text":268,"correct":32},"危险与可操作性研究",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1005673,"化工厂的设备车间在设计通道时，必须铺设至少能从（ ）个方向到达同一场所的类似于环形的通道，通道不得为死胡同。",[273,275,277,279],{"key":20,"text":274,"correct":22},"一",{"key":24,"text":276,"correct":32},"二",{"key":27,"text":278,"correct":22},"三",{"key":30,"text":280,"correct":22},"四",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":30,"analysis":33},1005676,"工艺装置区、液化烃储罐区、可燃液体的储罐区和装卸区及危险化学品仓库区应设环形消防车道。对消防车道的宽度要求大于或等于（ ）。",[285,287,289,290],{"key":20,"text":286,"correct":22},"2m",{"key":24,"text":288,"correct":22},"2.5m",{"key":27,"text":143,"correct":22},{"key":30,"text":291,"correct":32},"3.5m",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1005678,"化工厂的（ ）一般布置在厂区的中央部分。",[296,298,300,302],{"key":20,"text":297,"correct":32},"工艺装置区",{"key":24,"text":299,"correct":22},"运输装卸区",{"key":27,"text":301,"correct":22},"管理区",{"key":30,"text":303,"correct":22},"生活区",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":30,"analysis":33},1005681,"化工建设项目选址首先考虑（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"符合工业布局的地点",{"key":24,"text":311,"correct":22},"符合城市规划",{"key":27,"text":313,"correct":22},"符合产业政策",{"key":30,"text":315,"correct":32},"进入化工园区或工业园区",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1005684,"某乳品生产企业，因生产工艺要求需要对本成品进行冷却，建有以液氨作为制冷剂的制冷车间，内设一台容积为10m 3 的储氨罐。为防止液氨泄漏事故发生，该企业对制冷工艺和设备进行改进，更换了一种无害的新型制冷剂，完全能够满足生产工艺的要求，该项措施属于防止事故发生的安全技术措施中的（）。",[320,322,324,326],{"key":20,"text":321,"correct":32},"消除危险源",{"key":24,"text":323,"correct":22},"限制能量",{"key":27,"text":325,"correct":22},"故障－安全设计",{"key":30,"text":327,"correct":22},"隔离",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1005687,"《输气管道工程设计规范》（GB50251）和《输油管道工程设计规范》（GB50253）规定，埋地输油气管道与其他管道平行敷设时，其安全间距最小不得小于（）m。",[332,334,336,338],{"key":20,"text":333,"correct":32},"10",{"key":24,"text":335,"correct":22},"15",{"key":27,"text":337,"correct":22},"20",{"key":30,"text":339,"correct":22},"25",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1005690,"目前，预防控制危险化学品中毒、污染事故的主要措施有替代、变更工艺、隔离、通风、个体防护等。下列做法中，属于替代措施的是（）。",[344,346,348,350],{"key":20,"text":345,"correct":32},"用甲苯代替喷漆和涂料中用的苯",{"key":24,"text":347,"correct":22},"用乙烯氧化制乙醛工艺代替乙炔制乙醛工艺",{"key":27,"text":349,"correct":22},"用催化裂化技术代替熟裂化技术",{"key":30,"text":351,"correct":22},"用全面通风代替局部通风",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},1005693,"某化工工程设计公司为电厂化学水车间设计管道布置图，当输送水和盐酸的管道需并列敷设时，盐酸的管道应敷设在水管道的（）。",[356,357,358,359],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":32},{"key":30,"text":45,"correct":22},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":27,"analysis":33},1005697,"石油天然气的输送管道不得通过（）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"农田",{"key":24,"text":367,"correct":22},"江河",{"key":27,"text":369,"correct":32},"车站",{"key":30,"text":371,"correct":22},"稻谷试验田",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1005700,"下列危险化学物料禁止一起储存的是（）。",[376,377,378,379],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":32},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":22},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},1005702,"本质安全的核心是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":32},"从根源上消除或减少危险源",{"key":24,"text":387,"correct":22},"依靠附加的安全防护减少危险源和风险",{"key":27,"text":389,"correct":22},"依靠管理控制措施来减少危险源和风险",{"key":30,"text":391,"correct":22},"通过设计等手段使生产设备或生产系统本身具有安全性",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1005707,"本质安全的设备仪表主要分为两类，即（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":32},"失误安全型和故障安全型",{"key":24,"text":399,"correct":22},"偏差安全型和保障安全型",{"key":27,"text":401,"correct":22},"偏差安全型和故障安全型",{"key":30,"text":403,"correct":22},"失误安全型和保障安全型",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":27,"analysis":33},1005713,"（ ）是根据统计数据推断出来作为衡量系统风险大小的准则，是进行重大危险源选址规划决策的重要依据。",[408,410,412,414],{"key":20,"text":409,"correct":22},"个人风险指标",{"key":24,"text":411,"correct":22},"社会风险指标",{"key":27,"text":413,"correct":32},"可接受风险标准",{"key":30,"text":415,"correct":22},"风险标准",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1005717,"化工厂的换热设备重叠在一起布置时，除小换热器外，避免（ ）以上。",[420,422,424,426],{"key":20,"text":421,"correct":22},"2层",{"key":24,"text":423,"correct":32},"3层",{"key":27,"text":425,"correct":22},"4层",{"key":30,"text":427,"correct":22},"5层",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},1005721,"关于化工厂中泵的布置，说法错误的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"原则上泵应尽量接近吸入源，并且尽量集中并有规律地排列",{"key":24,"text":435,"correct":22},"露天或半露天布置的泵，应在管廊下或管廊与塔、容器之间，平行于管廊排成一列",{"key":27,"text":437,"correct":32},"泵端或泵侧与墙之间的净距不宜小于2m",{"key":30,"text":439,"correct":22},"两排泵净距应大于或等于2m",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1005727,"化工厂管系布置时，管道及其桁架跨越厂内铁路线的净空高度不应小于（ ），跨越厂内道路的净空高度不应小于（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":32},"5.5m，5m",{"key":24,"text":447,"correct":22},"5.5m，5.5m",{"key":27,"text":449,"correct":22},"5m，5m",{"key":30,"text":451,"correct":22},"5m，5.5m",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1005733,"基于事故场景进行风险研究是（ ）的基本特点。",[456,458,460,462],{"key":20,"text":457,"correct":22},"HAZOP",{"key":24,"text":459,"correct":32},"LOPA",{"key":27,"text":461,"correct":22},"SIS",{"key":30,"text":463,"correct":22},"SIL",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1005737,"为防止操作失误而装设的控制机构为（ ）。",[468,469,470,471],{"key":20,"text":111,"correct":32},{"key":24,"text":113,"correct":22},{"key":27,"text":115,"correct":22},{"key":30,"text":117,"correct":22},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},1005742,"能自动显示设备运行中与安全有关的参数或信息的仪表、装置为（ ）。",[476,477,478,479],{"key":20,"text":111,"correct":22},{"key":24,"text":113,"correct":22},{"key":27,"text":115,"correct":32},{"key":30,"text":117,"correct":22},{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":27,"analysis":33},1005747,"关于安全泄压装置的说法，错误的是（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"安全泄压装置就是为保证容器安全运行、防止超压的一种保险装置",{"key":24,"text":487,"correct":22},"当容器在正常工作压力下运行时，它保持严密不漏",{"key":27,"text":489,"correct":32},"当容器内压力超过规定，它能自动把容器内部的高压转换为低压",{"key":30,"text":491,"correct":22},"使容器内的压力始终保持在最高许用压力范围以内",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1005754,"通过装置元件的断裂而排出气体，特点是密封性好、泄压反应较快，以及气体含的污物对其的影响较小的安全泄压装置是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"阀型安全泄压装置",{"key":24,"text":499,"correct":32},"断裂型安全泄压装置",{"key":27,"text":501,"correct":22},"熔化型安全泄压装置",{"key":30,"text":503,"correct":22},"组合型安全泄压装置",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1005758,"关于实施工程监理的项目验收，下列说法错误的是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"检验批、分项工程由监理工程师组织，施工单位质量工程师参加验收",{"key":24,"text":511,"correct":32},"分部工程由总监理工程师组织，施工单位项目技术负责人参加验收",{"key":27,"text":513,"correct":22},"单位工程由建设单位项目经理组织，监理单位总监理工程师、施工单位项目经理参加验收",{"key":30,"text":515,"correct":22},"子单位工程由建设单位项目经理组织，监理单位总监理工程师、施工单位项目经理参加验收",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},1005763,"关于实行总承包的项目验收，下列说法错误的是（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"总承包单位专业工程师参加检验批及分项工程验",{"key":24,"text":523,"correct":22},"总承包单位项目总工程师参加分部工程验收",{"key":27,"text":525,"correct":32},"总承包单位专业工程师参加单位工程验收",{"key":30,"text":527,"correct":22},"总承包单位项目经理参加子单位工程验收",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1005767,"化工设备混凝土基础施工质量检验应符合《石油化工设备混凝土基础工程施工质量验收规范》（SH\u002FT3510）的要求，当基础交付安装时，基础混凝土强度不得低于设计强度的（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"70%",{"key":24,"text":535,"correct":32},"75%",{"key":27,"text":537,"correct":22},"85%",{"key":30,"text":539,"correct":22},"100%",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1005771,"关于安装工程的施工质量检验，下列说法错误的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"隐蔽工程在隐蔽前应由施工单位报验，建设单位／监理单位组织验收，并形成验收文件",{"key":24,"text":547,"correct":32},"检验项目质量验收出现不合格项时，不得验收",{"key":27,"text":549,"correct":22},"检验项目质量验收出现不合格项时，不合格项处理后，经有资质的检测单位检测鉴定或原设计单位核算满足安全和使用功能的要求，可予以让步接收",{"key":30,"text":551,"correct":22},"检验项目质量验收出现不合格项时，不合格项经处理后仍不符合安全使用要求时，不得验收",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":30,"analysis":33},1005776,"对管道工程进行压力试验，下列规定说法错误的是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"压力试验应以液体为试验介质",{"key":24,"text":559,"correct":22},"脆性材料严禁使用气体进行压力试验",{"key":27,"text":561,"correct":22},"试验过程中发现泄漏时，不得带压处理",{"key":30,"text":563,"correct":32},"当管道的设计压力小于或等于0.5MPa时，也可采用气体为试验介质但应采取有效的安全措施",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":30,"analysis":33},1005782,"关于本质安全的层次，说法正确的是（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"本质安全可以分为4个层次",{"key":24,"text":571,"correct":22},"核心层为设备仪表本质安全",{"key":27,"text":573,"correct":22},"中间层为工艺本质安全",{"key":30,"text":575,"correct":32},"最外层为安全防护措施及管理措施",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":27,"analysis":33},1005787,"下列关于化工企业选址的做法，错误的是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"产生高噪声的工厂应远离医疗区",{"key":24,"text":583,"correct":22},"产生高噪声的工厂位于城镇居民集中区的夏季最小风频风向的上风侧",{"key":27,"text":585,"correct":32},"对噪声敏感的工业企业应位于周围主要噪声源的夏季最小风频风向的上风侧",{"key":30,"text":587,"correct":22},"建设项目不建在开放型放射工作单位的防护检测区和核电厂周围的限制区内",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":27,"analysis":33},1005792,"化工厂的管理区、生活区一般应布置在（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"全年主导风向的下风侧",{"key":24,"text":595,"correct":22},"夏季主导风向的下风侧",{"key":27,"text":597,"correct":32},"全年最小风频风向的下风侧",{"key":30,"text":599,"correct":22},"全年最小风频风向的上风侧",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]