[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1006502":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1006502,736,1,"单选题","化工管路在投入运行之前，必须保证其强度与严密性符合设计要求。当管路安装完毕后，必须进行压力试验，称为试压。除特殊情况外，试压主要采用（ ）试验。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","冲击",false,{"key":16,"text":17,"correct":14},"B","负压",{"key":19,"text":20,"correct":14},"C","气压",{"key":22,"text":23,"correct":24},"D","液压",true,"当管路安装完毕后，试压主要采用液压试验。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-化工安全","建筑工程",0]