[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1005328":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1005328,736,1,"单选题","对于新建生产装置或大修装置，一般分两次进行开工条件确认，即中间交接前进行“三查四定”和装置引料前进行开工条件检查，其中，“三查”不包含（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","查设计漏项",false,{"key":16,"text":17,"correct":14},"B","查工程质量及隐患",{"key":19,"text":20,"correct":14},"C","查未完工程量",{"key":22,"text":23,"correct":24},"D","查工程安全设施",true,"本题考查的是化工装置开停工安全技术。“三查四定”，即查设计漏项、查工程质量及隐患、查未完工程量，定任务、定人员、定时间、定措施，限期完成。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-化工安全","建筑工程",0]