[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1005317":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1005317,736,1,"单选题","吊起重物时，应先将重物吊离地面（ ）左右，停机检查制动器灵敏性和可靠性，以及重物绑扎的牢固程度，确认情况正常后，方可继续工作。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","10cm",true,{"key":16,"text":17,"correct":18},"B","30cm",false,{"key":20,"text":21,"correct":18},"C","50cm",{"key":23,"text":24,"correct":18},"D","100cm","本题考查的是特殊作业环节安全技术。吊起重物时，应先将重物吊离地面10cm左右，停机检查制动器灵敏性和可靠性，以及重物绑扎的牢固程度，确认情况正常后，方可继续工作。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-化工安全","建筑工程",0]