[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1005285":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1005285,736,1,"单选题","生产装置或设施在停工处理后，交付检修施工单位前，需对检修条件进行确认。以下关于承包商施工准备情况的说法中，不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","签订施工HSE合同，交安全抵押金",false,{"key":16,"text":17,"correct":18},"B","有健全的HSE管理体系并配备具备资质的专职或兼职安全监督管理人员，配置数量满足要求",true,{"key":20,"text":21,"correct":14},"C","为参加检修人员配备合格的个体防护用品",{"key":23,"text":24,"correct":14},"D","制定检修施工方案，进行危害识别并制定相应的安全措施","本题考查的是化工装置开停工安全技术。B.错误。有健全的HSE管理体系并配备具备资质的专职安全监督管理人员，配置数量满足要求。",{"id":6,"name":27,"category":28,"favorite":29},"安全实务-化工安全","建筑工程",0]