[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-732-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},732,"安全生产专业实务(原案例)","建筑工程",0,24,50,1210,[13,34,46,58,66,78,90,102,114,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,534,545,557,568,580,592,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},998052,1,"单选题","我国地铁施工方法由最初单一的明挖法发展到现在的多种方法并存的施工方法。下列施工方法中，不属于地铁常用施工方法的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","明挖",false,{"key":24,"text":25,"correct":22},"B","暗挖",{"key":27,"text":28,"correct":22},"C","盾构法",{"key":30,"text":31,"correct":32},"D","人工法",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},998062,"下列不属于暗挖车站工法选择原则的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"安全可行性原则",{"key":24,"text":41,"correct":22},"工期可控性原则",{"key":27,"text":43,"correct":32},"整体可靠性原则",{"key":30,"text":45,"correct":22},"经济合理性原则",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},998072,"暗挖车站常用施工方法包括PBA法、CRD法、双侧壁导坑法、中洞法、侧洞法、柱洞法等施工方法。施工中先开挖中间部分，在中洞内施作梁、柱结构，然后再开挖两侧部分，并逐渐将侧洞顶部荷载通过中洞初期支护转移到梁、柱结构上的施工方法，属于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"PBA法",{"key":24,"text":53,"correct":22},"CRD法",{"key":27,"text":55,"correct":32},"中洞法",{"key":30,"text":57,"correct":22},"侧洞法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},998082,"暗挖车站常用施工方法包括PBA法、CRD法、双侧壁导坑法、中洞法、侧洞法、柱洞法等施工方法。施工中先开挖两侧部分，在侧洞内施作梁、柱结构，然后再开挖中间部分，并逐渐将中洞顶部荷载通过初期支护转移到梁、柱结构上的施工方法．属于（ ）。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":32},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":30,"analysis":33},998093,"PBA工法就是在边导洞内施工车站的边桩，在中岛洞内施工梁柱，然后在桩柱体系间进行初支和二衬扣拱，形成车站的顶部结构，并在顶部结构的保护下由上至下逆筑车站结构。PBA法具体施工流程为（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":22},"边桩施工、柱孔开挖→导洞开挖→桩、柱顶梁施工→钢管柱吊装及灌注混凝土→底梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"key":24,"text":73,"correct":22},"边桩施工、柱孔开挖→底梁施工→导洞开挖→钢管柱吊装及灌注混凝土→桩、柱顶梁施工→顶部初支及二衬扣拱→站厅层施工→站台层施工",{"key":27,"text":75,"correct":22},"导洞开挖→边桩施工、柱孔开挖→桩、柱顶梁施工→顶部初支及二衬扣拱→底梁施工→钢管柱吊装及灌注混凝土→站厅层施工→站台层施工",{"key":30,"text":77,"correct":32},"导洞开挖→边桩施工、柱孔开挖→底梁施工→钢管柱吊装及灌注混凝土→桩、柱顶梁施工→顶部初支及二衬扣拱→站厅层施工v站台层施工",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":27,"analysis":33},998103,"下列关于钢管柱施工相关要求的说法中，错误的是（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"为便于起吊，钢管柱出厂前应在管顶焊接耳片，位置约在管顶下50mm",{"key":24,"text":85,"correct":22},"耳片侧面须加焊肋板，确保在最不利位置起吊时不致侧翻破坏",{"key":27,"text":87,"correct":32},"当钢管柱底部轴线对齐后，对其进行调直时，大的偏差靠兰花口调整，由吊臂进行细致调整",{"key":30,"text":89,"correct":22},"对比较长的钢管柱做有效临时支护，尽快脱钩后再继续进行焊接工序，加快吊装速度",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":24,"analysis":33},998113,"顶纵梁即钢管混凝土柱上的纵梁，也是车站主体结构的主要承载结构。纵梁底部钢板通过钢管柱顶部的预埋锚固螺栓与钢管柱连接。中洞法暗挖地铁站顶梁施工顺序为（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":22},"芯梁部位钢筋绑扎→模板支架施工→芯梁底板预制→芯梁底板安装→顶部防水层铺设→混凝土浇筑",{"key":24,"text":97,"correct":32},"芯梁底板预制→芯梁底板安装→顶部防水层铺设→芯梁部位钢筋绑扎→模板支架施工→混凝土浇筑",{"key":27,"text":99,"correct":22},"芯梁部位钢筋绑扎→模板支架施工→芯梁底板安装→顶部防水层铺设→芯梁底板预制→混凝土浇筑",{"key":30,"text":101,"correct":22},"芯梁底板预制→顶部防水层铺设→芯梁部位钢筋绑扎→芯梁底板安装→模板支架施工→混凝土浇筑",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},998123,"盾构法隧道施工中除一般机械设备用电和生活用电等常规用电外，盾构掘进动力系统的供电电压为（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"380V",{"key":24,"text":109,"correct":22},"1kV",{"key":27,"text":111,"correct":32},"10kV",{"key":30,"text":113,"correct":22},"35kV",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},998130,"刀盘内更换刀具也是盾构法隧道施工过程中一项相对危险的作业工序，所以在更换刀具前工具、设备及应急物品应准备齐全。下列关于更换刀具时的安全注意事项中，说法正确的是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":32},"对土舱内的气体进行检测，在保证无有毒气体的情况下才可进行刀具更换",{"key":24,"text":121,"correct":22},"电动工具需选用42V以下的安全电压",{"key":27,"text":123,"correct":22},"在地质条件比较稳定的情况下，一般采取气压换刀",{"key":30,"text":125,"correct":22},"在盾构机前方或上方的土体不能自稳的情况下，需进行常压换刀",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},998133,"盾构法隧道施工的一般用电是临时用电，电缆线必须使用三相五线电缆。盾构机采用的高压用电应符合要求。下列关于盾构机高压用电系统的要求中，说法正确的是（ ） A.盾构机动力系统掘进用电一般是采用双回路专供的电缆路专供的电缆",[130,132,134,136],{"key":20,"text":131,"correct":32},"电缆从变电站接到盾构机上面一般采用架空架设",{"key":24,"text":133,"correct":22},"高压电缆采用埋地敷设时，埋地深度不小于0．2m，电缆周围需铺50mm厚的细砂",{"key":27,"text":135,"correct":22},"随着盾构向前不断推进，高压电缆应预留足够长度，严禁使用接驳器接连",{"key":30,"text":137,"correct":22},"在隧道内轨道运输车辆必须高于电缆固定式悬挂的高度",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},998135,"暗挖地铁车站的结构形式、工程环境条件及暗挖工法三者密切相关。下列暗挖地铁车站结构形式选择原则的说法中，错误的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"在满足功能的前提下，车站的结构形式应尽量紧凑，压缩土建规模，节省造价",{"key":24,"text":145,"correct":32},"在车站客流量较大，地质条件较好，地下水可以疏干的情况下，可采用单拱单层结构形式",{"key":27,"text":147,"correct":22},"当车站客流量不大，水文地质条件好时，可采用多拱(或单拱多跨)单层结构形式",{"key":30,"text":149,"correct":22},"当车站受环境条件限制，线间距不能拉开，岛式站台宽度小于12m时，可采用双拱或单拱结构",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":30,"analysis":33},998137,"下列不属于城市轨道交通地下工程施工风险管理实施的主要阶段的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"施工准备期",{"key":24,"text":157,"correct":22},"施工期",{"key":27,"text":159,"correct":22},"车辆及机电系统安装与调试",{"key":30,"text":161,"correct":32},"验收完成正式投产",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},998140,"下列属于超过一定规模的危险性较大的分部分项工程的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"开挖深度超过3 m(含3 m)的基(槽)坑的土方开挖、支护、降水工程",{"key":24,"text":169,"correct":22},"搭设高度5 m及以上的混凝土模板支撑工程",{"key":27,"text":171,"correct":32},"搭设高度24 m及以上的落地式钢管脚手架工程",{"key":30,"text":173,"correct":22},"分段架体搭设高度8 m及以上的悬挑式脚手架工程",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},998142,"论证报告是专项方案修改完善的指导意见。施工单位应当根据论证报告修改完善专项方案，并经签字后，方可组织实施。签字的人员不包括（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":32},"建设单位负责人",{"key":24,"text":181,"correct":22},"建设单位项目负责人",{"key":27,"text":183,"correct":22},"项目总监理工程师",{"key":30,"text":185,"correct":22},"施工单位技术负责人",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},998144,"进行钢结构构件连接作业时，应使用梯子或其他登高设施。当钢柱或钢结构接高时，应设置操作平台。下列注意事项中，错误的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"钢结构吊装，构件宜在地面组装，安全设施应一并设置",{"key":24,"text":193,"correct":32},"吊装时，应在作业层下方设置一道密目式安全立网",{"key":27,"text":195,"correct":22},"钢结构安装施工宜在施工层搭设水平通道，水平通道两侧应设置防护栏杆，当利用钢梁作为水平通道时，应在钢梁一侧设置连续的安全绳，安全绳宜采用钢丝绳",{"key":30,"text":197,"correct":22},"当遇有6级以上强风、浓雾、沙尘暴等恶劣天气时，不得进行露天攀登或悬空高处作业",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":30,"analysis":33},998146,"下列关于钢结构构件连接施工防触电的技术要求，说法错误的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"现场使用的电焊机，应设有机棚，并应装设相应的消防器材",{"key":24,"text":205,"correct":22},"电焊机导线应具有良好的绝缘性能，绝缘电阻不得小于0．5 mΩ，接地线接地电阻不得大于4Ω",{"key":27,"text":207,"correct":22},"电焊机的二次线应采用防水橡皮护套铜芯软电缆，电缆长度不宜大于30 m，一次线长度不宜大于5 m，应配装二次侧空载降压器",{"key":30,"text":209,"correct":32},"吊装作业使用行灯照明时，电压不得超过42 V",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},998149,"起重吊装作业前．必须编制吊装作业专项施工方案，并应进行安全技术措施交底；作业中，未经技术负责人批准，不得随意更改。起重机特种作业人员必须持特种作业资格证书上岗，严禁非起重机驾驶人员驾驶、操作起重机。下列不需取得特种作业资格证书的作业人员包括（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"司索工",{"key":24,"text":217,"correct":32},"起重机作业现场负责人",{"key":27,"text":219,"correct":22},"司机",{"key":30,"text":221,"correct":22},"信号工",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":30,"analysis":33},998151,"吊装时根据构件的外形、中心及工艺要求选择吊点。下列不属于“十不吊”情形的是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"斜拉斜吊",{"key":24,"text":229,"correct":22},"埋置在地下的电杆",{"key":27,"text":231,"correct":22},"夜间施工光线不明",{"key":30,"text":233,"correct":32},"物体棱角处有垫片",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},998153,"下列关于钢结构构件的制作加工触电伤害事故预防安全技术的说法中，错误的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"确保三级配电，两级保护",{"key":24,"text":241,"correct":32},"每两台用电设备必须有一个专用的开关箱",{"key":27,"text":243,"correct":22},"配电箱、开关箱外形结构应能防雨、防尘",{"key":30,"text":245,"correct":22},"电缆线路应采用埋地或架空敷设．严禁沿地面明设",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},998156,"下列关于电气焊作业安全技术的说法中，错误的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"电焊工必须持证上岗",{"key":24,"text":253,"correct":32},"动火作业需备案",{"key":27,"text":255,"correct":22},"动火作业时，看火人必须持有效合格的灭火器材，在焊渣掉落的最下方安全距离外履职",{"key":30,"text":257,"correct":22},"合理安排施工工序，防止上方动火作业时下放可燃材料未隔离",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},998158,"建筑幕墙安装工程施工时，吊篮脚手架工程施工单位必须在施工前编制安全专项施工方案。下列关于吊篮施工技术要求的说法中错误的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"吊篮内的作业人员不应超过2人",{"key":24,"text":265,"correct":22},"吊篮内的作业人员应佩戴安全帽，系安全带",{"key":27,"text":267,"correct":32},"安全绳应固定在吊篮上的可靠位置上，安全绳不得有松散、断股、打结现象",{"key":30,"text":269,"correct":22},"下班后不得将吊篮停留在半空中，应将吊篮放至地面",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},998160,"建筑幕墙安装工程属于危险性较大的分部分项工程，且施工人员在施工过程中经常处于高空作业状态，安全风险大，在施工过程中有很多干扰安全的因素。下列关于建筑幕墙安装工程物体打击事故预防安全技术中，说法错误的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"幕墙施工时。下方均应设置警戒隔离区，防止高空坠物",{"key":24,"text":277,"correct":32},"高处作业所使用的工具和零配件等，应放在操作平台内，并严禁抛掷",{"key":27,"text":279,"correct":22},"所用材料不得随意抛掷，当有交叉作业可能时，应搭设防护棚或通道，否则不得进行交叉作业",{"key":30,"text":281,"correct":22},"幕墙材料存放应单独设置存放区，材料存放高度应满足安全要求，保证自稳角度。吊装或抬运物料时，应确保自身安全",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},998162,"下列关于建筑幕墙安装工程高处坠落事故预防安全技术，说法错误的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"搭设高度24 m及以上的落地式钢管脚手架工程、附着式整体和分片提升脚手架工程、悬挑式脚手架工程、移动式操作平台工程及新型、异形脚手架工程．施工单位必须在施工前编制安全专项施工方案",{"key":24,"text":289,"correct":22},"搭设高度50 m及以上落地式钢管脚手架、提升高度l50 m及以上附着式整体和分片提升脚手架工程、架体高度20 m及以上悬挑式脚手架工程，施工单位必须组织专家对专项方案进行论证",{"key":27,"text":291,"correct":32},"作业层脚手板应铺满、铺稳、铺实，并应用安全网单层兜底，施工层以下每隔10 m应用安全网全封闭",{"key":30,"text":293,"correct":22},"脚手架沿架体外围应用密目式安全网全封闭，密目式安全网宜设置在脚手架外立杆内侧，并应与架体绑扎牢固",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},998164,"机电安装工程的机电调试阶段，应注意施工安全。下列关于机电调试阶段的要求中，错误的是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"试验接线应一人接线，另一人核对检查，防止误接，损坏仪器设备及损伤人员",{"key":24,"text":301,"correct":32},"如果试验时确实需要带电接线的，应做好防护措施",{"key":27,"text":303,"correct":22},"用万用表检查时，应先打好挡位，方可进行",{"key":30,"text":305,"correct":22},"所有调试人员应持证上岗，严禁无证操作",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},998165,"下列关于手持电动工具的使用过程，说法错误的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"启动后，先空载运转，检查工具联动是否灵活",{"key":24,"text":313,"correct":22},"手持电动工具应有防护罩，操作时加力要平稳，不得用力过猛",{"key":27,"text":315,"correct":32},"作业中，发现刀具、模具损坏的，可用手触摸确定是否更换",{"key":30,"text":317,"correct":22},"机具运转时不得撒手",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":30,"analysis":33},998167,"建筑工程施工过程中，机电设备的安装工程是高危险、事故多发的阶段，必须要有防范和杜绝安全事故发生相应的解决措施。下列关于机电安装阶段的技术要求中，说法错误的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"电动机械和电气照明设备拆除后，如果电线必须保留，应该将电源切断，并且将线头绝缘",{"key":24,"text":325,"correct":22},"安装吊顶内线照明线路时，不得直接在板条天棚或隔声板上行走或堆放材料",{"key":27,"text":327,"correct":22},"有触电危险的照明设施应采用36 V及以下安全电压",{"key":30,"text":329,"correct":32},"电焊工作物和金属工作台同大地相隔的时候，仅需工作台装接保护性接地",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},998169,"建筑工程施工过程中，机电安装工程占有很大的比重，而随着建筑行业的不断发展，对其技术要求也不断提高，安全风险也随之加大。下列关于机电安装工程有关消防要求的说法中，错误的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"未经批准严禁携带易燃易爆物品进入施工现场，因施工需要购进的易燃、易爆物品必须按安全规程妥善保管",{"key":24,"text":337,"correct":32},"在施工现场吸烟，燃火作业附近有易燃、易爆物品时，应注意防火",{"key":27,"text":339,"correct":22},"电气设备的开关安全罩、火花罩、安全保护器、避雷器、接地装备等必须完好无损，电器材料连接地点之间的接触必须良好，避免产生电火花而引起燃烧",{"key":30,"text":341,"correct":22},"施工现场的安全通道不得阻塞，必须保持畅通无阻",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},998170,"下列关于登高作业防护技术措施的说法中，错误的是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":32},"脚手架操作层上使用梯子进行作业时，应加强监护措施",{"key":24,"text":349,"correct":22},"当梯子需接长使用时，应有可靠的连接措施，接头不得超过1处",{"key":27,"text":351,"correct":22},"在轻质型材等屋面上作业，应搭设临时走道板，不得在轻质型材上行走",{"key":30,"text":353,"correct":22},"移动式操作平台的面积不应超过10 m2，高度不应超过5 m．高宽比不应大于2：1",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},998172,"下列关于物体打击防护措施的说法中，错误的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"充分利用安全网、安全带、安全帽等防护用品，保证施工人员在有安全保障措施的情况下施工",{"key":24,"text":361,"correct":32},"“四口”“五临边”应采用安全帽等预防落物伤人的措施",{"key":27,"text":363,"correct":22},"物料严禁存放在临边、洞口等易造成物体打击部位",{"key":30,"text":365,"correct":22},"高处作业所用材料、工具、半成品、成品均应堆放平稳、材料严禁投掷，严禁交叉作业，如确有交叉作业需要，中间须设硬质隔离设施",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},998174,"下列关于临时照明装置设置要求的说法错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"照明开关箱中的所有正常不带电的金属部分都必须做保护接零",{"key":24,"text":373,"correct":32},"开关箱接零保护时，灯具的金属外壳可不必作保护接零",{"key":27,"text":375,"correct":22},"照明线路的相线必须经过开关才能进入照明器，不得直接进入照明器",{"key":30,"text":377,"correct":22},"室外灯具距地不得低于3 m；室内灯具距地不得低于2．5 m",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":27,"analysis":33},998175,"对下列特殊场所使用安全电压照明器使用正确的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"隧道的照明电源电压不应大于42 V",{"key":24,"text":385,"correct":22},"易触及带电体场所的照明电源电压不得大于36 V",{"key":27,"text":387,"correct":32},"特别潮湿场所电源电压不得大于12 V",{"key":30,"text":389,"correct":22},"锅炉内的照明电源电压不得大于24 V",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":30,"analysis":33},998177,"木工机械的安全控制，首先应定机定人，严禁无证上岗；严禁机具“带病”运转。下列关于木工机械的安全要求中，说法错误的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"对生产噪声、木粉尘或挥发性有害气体的机械设备，要配置与其机械运转相连接的消声、吸尘或通风装置",{"key":24,"text":397,"correct":22},"木工机械的刀轴与电气应有安全联控装置",{"key":27,"text":399,"correct":22},"针对木材加工作业中的木料反弹危险，应采用安全送料装置或设置分离刀、防反弹安全屏护装置",{"key":30,"text":401,"correct":32},"操作人员必须扎紧袖口、理好衣角、扣好衣扣，戴手套操作",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},998178,"建筑装饰装修工程施工中易燃材料施工前，对作业人员进行培训交底，及时制止违章作业。下列关于火灾预防措施的说法中，错误的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"不准在工程内、库房内调配油漆，稀释易燃、易爆液体",{"key":24,"text":409,"correct":32},"在施工程内可作为临时仓库，存放易燃、可燃材料，但应加强防火措施",{"key":27,"text":411,"correct":22},"氧气瓶、乙炔气瓶工作间距不小于5 m，两瓶与明火作业距离不小于10m",{"key":30,"text":413,"correct":22},"注意静电起火和工具碰撞打火",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":30,"analysis":33},998180,"装饰装修工程应预防高处坠落和物体打击事故，下列关于其安全技术要求的说法中错误的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"要临时拆除或变动安全防护设施时，应采取能代替原防护设施的可靠措施，作业后应立即恢复",{"key":24,"text":421,"correct":22},"各类安全防护设施，应建立定期不定期的检查和维修保养制度，发现隐患应及时采取整改措施",{"key":27,"text":423,"correct":22},"坠落高度基准面2 m及以上进行临边作业时。应在临空一侧设置防护栏杆，并应采用密目式安全立网或工具式栏板封闭",{"key":30,"text":425,"correct":32},"在洞口作业时，应采用密目式安全立网防坠落措施，并使其处于良好的防护状态",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},998181,"在木材加工的诸多危险因素中，木料反弹的危险性大，发生概率高，下列木材加工安全防护的措施中，不适于防止木料反弹的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"采用安全送料装置",{"key":24,"text":433,"correct":32},"装设锯盘制动控制器",{"key":27,"text":435,"correct":22},"设置防反弹安全屏护装置",{"key":30,"text":437,"correct":22},"设置分离刀",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":30,"analysis":33},998183,"建筑装饰装修工程施工中易燃材料施工前，应制定相关的安全技术措施。下列关于火灾预防措施的说法中，错误的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"电气焊工作业，要有操作资格证和动火证",{"key":24,"text":445,"correct":22},"动火前要清除附近易燃物。设置看火人员和配备灭火用具",{"key":27,"text":447,"correct":22},"现场要有明显的防火宣传标志，严禁吸烟",{"key":30,"text":449,"correct":32},"动火证3日有效，动火地点不限",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},998185,"下列关于使用有毒有害产品的安全技术的说法中，错误的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":32},"油漆作业场所应有良好的通风条件，在施工条件不好的情况下必须佩戴防毒面具方可施工",{"key":24,"text":457,"correct":22},"油漆存放要求专库专存。通风良好，专人管理灭火器材和设置“严禁烟火”的明显标志",{"key":27,"text":459,"correct":22},"对树脂类防腐蚀工程施工，患有气管炎、心脏病、肝炎、高血压以及对某些物质有过敏反应的。均不能安排其参加施工",{"key":30,"text":461,"correct":22},"如果化学材料起火，要根据起火物性质选择灭火方法，同时注意救火人员的自身安全，防止中毒",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},998186,"有限空间是指与外界相对隔离，进出口受限，自然通风不良，足够容纳一人进入并从事非常规、非连续性作业的有限空间。下列各组场所中，均属于密闭空间的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":32},"炉、塔、釜、罐、储藏室",{"key":24,"text":469,"correct":22},"沟、坑、井、池、锅炉房",{"key":27,"text":471,"correct":22},"炉、塔、沟、坑、配电间",{"key":30,"text":473,"correct":22},"釜、罐、井、池、仪表间",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},998188,"在有限空间内由于通风不良、生物的呼吸作用或物质的氧化作用，会使有限空间形成缺氧状态。单纯性窒息气体也会引发窒息事故，其本身无毒，但排挤氧空间，造成作业人员缺氧窒息，下列不是导致单纯性窒息的气体是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":32},"一氧化碳",{"key":24,"text":481,"correct":22},"二氧化碳",{"key":27,"text":483,"correct":22},"甲烷",{"key":30,"text":485,"correct":22},"六氟化氯",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":30,"analysis":33},998189,"下列说法中，不属于引发缺氧窒息的主要原因的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"有限空间长期通风不良，氧含量偏低",{"key":24,"text":493,"correct":22},"有限空间内存在的物质发生耗氧性化学反应，如燃烧、生物的有氧呼吸等",{"key":27,"text":495,"correct":22},"作业过程中引入单纯性窒息气体挤占氧气空间，如使用氮气、氩气、水蒸气进行清洗",{"key":30,"text":497,"correct":32},"某些相连或接近的设备或管道的渗漏或扩散，如硫化氢泄漏",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":27,"analysis":33},998191,"生产经营单位应对有限空间作业负责人员、作业人员和监护人员开展安全教育培训，下列不属于培训内容的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"有限空间存在的危险特性和安全作业的要求",{"key":24,"text":505,"correct":22},"进入有限空间的程序",{"key":27,"text":507,"correct":32},"检测仪器、个人防护用品等设备的正确维修",{"key":30,"text":509,"correct":22},"事故应急救援措施与应急救援预案",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":27,"analysis":33},998192,"易燃易爆物质是可能引起燃烧、爆炸的气体、蒸气或粉尘。能够引发易燃易爆气体或可燃性粉尘爆炸的常见条件很多，下列条件中错误的是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"化学反应热、原料分解自燃、热辐射",{"key":24,"text":517,"correct":22},"高温表面、摩擦和撞击、绝热压缩",{"key":27,"text":519,"correct":32},"电气设备及线路的过热和火花、静电放电、电磁感应",{"key":30,"text":521,"correct":22},"明火、雷击和日光照射",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},998194,"一旦作业场所空气中的氧浓度低于标准值，就会有缺氧的危险，对人体产生危害。其中氧含量的最低允许值是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":32},"19．5％",{"key":24,"text":529,"correct":22},"15％",{"key":27,"text":531,"correct":22},"10％",{"key":30,"text":533,"correct":22},"8％",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":27,"analysis":33},998195,"长期接触可引起各类白血病的有毒物是（ ）。",[538,540,541,543],{"key":20,"text":539,"correct":22},"硫化氢",{"key":24,"text":479,"correct":22},{"key":27,"text":542,"correct":32},"苯",{"key":30,"text":544,"correct":22},"氨",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},998197,"下列关于有限空间作业要求说法错误的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"未经作业负责人审批，任何人不得进入有限空间作业",{"key":24,"text":552,"correct":32},"有限空间内部应设置醒目的警示标志，并告知作业者存在的危险有害因素和防控措施",{"key":27,"text":554,"correct":22},"有限空间作业现场应明确作业负责人、监护人员和作业人员，不得在没有监护人的情况下作业",{"key":30,"text":556,"correct":22},"生产经营单位委托承包单位进行有限空间作业时，不得将工程发包给不具备生产条件的单位和个人",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},998198,"有限空间中可能存在大量的有毒物质。人一旦接触后易引起化学性中毒可能导致死亡。下列不属于有毒物质的是（ ）。",[561,563,564,566],{"key":20,"text":562,"correct":22},"二氧化硫",{"key":24,"text":481,"correct":32},{"key":27,"text":565,"correct":22},"氯气",{"key":30,"text":567,"correct":22},"氨气",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":27,"analysis":33},998200,"应急救援活动一般分为应急准备、初级反应、扩大应急和应急恢复四个阶段。应急运作机制主要由统一指挥、分级响应、属地为主和公众动员这四个基本机制组成。下列关于这四个基本机制的说法正确的是（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"统一指挥是应急机制的基础，也是整个应急体系的基础",{"key":24,"text":575,"correct":22},"分级响应是应急活动的基本原则",{"key":27,"text":577,"correct":32},"属地为主强调“第一反应”的思想和以现场应急、现场指挥为主的原则",{"key":30,"text":579,"correct":22},"公众动员机制是指在初级响应到扩大应急的过程中实行的分级相应的机制",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},998201,"综合应急预案总则中包括信息报告程序，其中明确24小时应急值守电话、事故信息接收、通报程序和责任人等措施，属于信息报告程序中的（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":32},"信息接收与通报",{"key":24,"text":587,"correct":22},"信息上报",{"key":27,"text":589,"correct":22},"信息传递",{"key":30,"text":591,"correct":22},"信息交流",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":30,"analysis":33},998203,"下列不属于专项应急预案主要内容的是（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"事故风险分析",{"key":24,"text":599,"correct":22},"应急指挥机构及职责",{"key":27,"text":601,"correct":22},"处置措施",{"key":30,"text":587,"correct":32},{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":30,"analysis":33},998204,"现场应急处置内容不包括（ ）。",[607,609,611,613],{"key":20,"text":608,"correct":22},"事故应急处置程序",{"key":24,"text":610,"correct":22},"现场应急处置措施",{"key":27,"text":612,"correct":22},"明确报警负责人",{"key":30,"text":614,"correct":32},"明确临时用电程序",[616,619,622,625,628,631],{"id":15,"name":617,"category":7,"favorite":618},"领导干部任职前廉政法规知识测试题",92,{"id":620,"name":621,"category":7,"favorite":15},595,"建筑结构与设备",{"id":623,"name":624,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":626,"name":627,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":629,"name":630,"category":7,"favorite":8},534,"BIM工程师",{"id":632,"name":630,"category":7,"favorite":8},535]