[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-732-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},732,"安全生产专业实务(原案例)","建筑工程",0,23,50,1210,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},997863,1,"单选题","脚手架搭设应选择合理的搭设顺序和施工操作程序，这是保证脚手架搭设安全和减少架体搭设积累误差的重要举措，脚手架搭设应按顺序施工。下列不符合规定的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","落地作业脚手架、悬挑脚手架一次搭设高度不应超过最上层连墙件三步，且自由高度不应大于6m",true,{"key":24,"text":25,"correct":26},"B","支撑脚手架应逐排、逐层进行搭设",false,{"key":28,"text":29,"correct":26},"C","剪刀撑、斜撑杆等加固杆件应随架体同步搭设，不得滞后安装",{"key":31,"text":32,"correct":26},"D","构建组装类脚手架的搭设应自下而上按步架设，并逐层改变搭设方向","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},997865,"下列关于脚手架的安全使用与管理的说法中，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"设置供操作人员上下使用的安全扶梯、爬梯或斜道",{"key":24,"text":41,"correct":26},"高层脚手架和满堂脚手架应该进行检查验收后才能使用",{"key":28,"text":43,"correct":26},"在脚手架上同时进行多层作业的情况下，各作业层之间应设置可靠的防护棚",{"key":31,"text":45,"correct":22},"脚手架拆除的方案和措施应在脚手架专项施工方案以外编写脚手架专项拆除方案",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},997867,"搭设高度超过规范要求的脚手架应编制专项施工方案，基础、连墙件应经设计计算。专项施工方案必须经专家论证的，必须采取加强措施。专项施工方案必须经专家论证的情况包括搭设高度至少超过（ ）的架体。",[50,52,54,56],{"key":20,"text":51,"correct":26},"10m",{"key":24,"text":53,"correct":26},"30m",{"key":28,"text":55,"correct":22},"50m",{"key":31,"text":57,"correct":26},"100m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},997869,"为建筑施工而搭设的、承受荷载的由扣件和钢管等构成的脚手架与支撑架，统称脚手架。扣件即采用螺栓紧固的扣接连接件。下列关于脚手架的构配件的说法中错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"脚手架钢管宜采用φ48．3mm×3．6mm钢管。每根钢管的最大质量不应大于25．8kg",{"key":24,"text":65,"correct":26},"扣件在螺栓拧紧扭矩达到65N?m时，不得发生破坏",{"key":28,"text":67,"correct":26},"木胶板脚手板厚度不应小于50mm",{"key":31,"text":69,"correct":22},"可调托撑螺杆与螺母旋合长度不得小于5扣。螺母厚度不得小于10mm",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},997871,"常见扣件形式有3种，下列关于扣件形式的说法中，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"扣件按照结构形式分直角扣件、旋转扣件、对接扣件",{"key":24,"text":77,"correct":26},"直角扣件式用于垂直交叉杆间连接的扣件",{"key":28,"text":79,"correct":26},"旋转扣件式用于平行或斜交杆件间连接的扣件",{"key":31,"text":81,"correct":22},"对接扣件是用于杆件对接或斜交杆件间连接的扣件",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},997873,"脚手板可采用钢、木、竹材料制作，单块脚手板的质量不宜大于30kg。木胶板应符合国家标准GB50005中材质的规定。构件的材质等级分为3级，分别是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"A级：B级；C级",{"key":24,"text":89,"correct":26},"1级；2级；3级",{"key":28,"text":91,"correct":26},"Ⅰ级：Ⅱ级；Ⅲ级",{"key":31,"text":93,"correct":22},"Ⅰa级：Ⅱa级；Ⅲa级",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},997874,"脚手架上的荷载分为永久荷载(恒荷)和可变荷载(活荷)。永久荷载分项系数取（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"1．0",{"key":24,"text":101,"correct":22},"1．2",{"key":28,"text":103,"correct":26},"1．4",{"key":31,"text":105,"correct":26},"16",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},997876,"脚手架的施工荷载根据脚手架的不同用途，确定装修、结构两种施工均布荷载(kN／m2)。装修脚手架为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"1kN／m2",{"key":24,"text":113,"correct":22},"2kN／m2",{"key":28,"text":115,"correct":26},"3kN／m2",{"key":31,"text":117,"correct":26},"4kN／m2",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},997878,"设计脚手架的承重构件时，应根据使用过程中可能出现的荷载取其最不利组合进行计算。下列关于脚手架所受荷载的说法中，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"钢管脚手架的荷载由剪刀撑、斜撑和连墙杆承受",{"key":24,"text":125,"correct":26},"水平杆和立杆主要是保证脚手架的整体刚度和稳定性",{"key":28,"text":127,"correct":26},"水平杆和连墙杆则承受全部的风荷载",{"key":31,"text":129,"correct":22},"扣件则是架子组成整体的连接和传力件",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},997880,"脚手架上的荷载归纳为竖向荷载和水平荷载两类，下列关于它们的传递路线说法正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过水平杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由立杆通过连墙件传给建筑物",{"key":24,"text":137,"correct":26},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过水平杆传递的；由竖向和水平荷载产生的竖向力由立杆传递给基础：水平力则由水平杆通过连墙件传给建筑物",{"key":28,"text":139,"correct":26},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过立杆传递的：由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由水平杆通过连墙件传给建筑物",{"key":31,"text":141,"correct":22},"作用于脚手架上的全部竖向荷载和水平荷载最终都是通过立杆传递的：由竖向和水平荷载产生的竖向力由立杆传递给基础；水平力则由立杆通过连墙件传给建筑物",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},997882,"扣件式钢管脚手架的基本构造形式与木脚手架基本相同，有单排架和双排架两种。下列关于扣件式钢管脚手架的构造，说法正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"在立杆、纵向水平杆两杆的交叉点称为主节点",{"key":24,"text":149,"correct":26},"主节点处立杆和纵向水平杆的连接扣件与纵向水平杆与横向水平杆的连接扣件的间距应小于500mm",{"key":28,"text":151,"correct":22},"在脚手架使用期间，主节点处的纵向、横向水平杆及连墙件不能拆除",{"key":31,"text":153,"correct":26},"在脚手架使用期间，纵向扫地杆不能拆除，横向扫地杆可以拆除",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},997884,"搭设高度超过一定高度，钢管、扣件的周转使用率会降低，脚手架的地基基础处理费用也会增加。下列常用单、双排脚手架设计尺寸要求的说法中，错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"单排脚手架搭设高度不应超过50m",{"key":24,"text":161,"correct":26},"双排脚手架搭设高度不宜超过50m",{"key":28,"text":163,"correct":26},"立杆采用单管的落地脚手架一般在50m以下",{"key":31,"text":165,"correct":26},"立杆采用单管的落地脚手架当需要搭设高度大于50m时，宜采用加强措施",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},997885,"纵向水平杆各接头中心至最近主节点的距离不宜大于纵距的1／3。下列关于纵向水平杆的要求中，说法错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"纵向水平杆可用于设置在立杆内侧，其长度不能小于3跨",{"key":24,"text":173,"correct":26},"纵向水平杆的对接扣件应交错布置",{"key":28,"text":175,"correct":22},"两根相邻纵向水平杆的结构应设置在同步同跨内",{"key":31,"text":177,"correct":26},"不同步不同跨两相邻接头在水平方向错开的距离不应小于500mm",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},997887,"下列关于横向水平杆设置的说法中，错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"主节点处必须设置一根横向水平杆，用直角扣件扣接且严禁拆除",{"key":24,"text":185,"correct":26},"脚手架必须设置纵、横向扫地杆",{"key":28,"text":187,"correct":26},"纵向扫地杆应采用直角扣件固定在距底座上皮不大于200mm处的立杆上",{"key":31,"text":189,"correct":22},"横向扫地杆亦采用直角扣件固定在紧靠纵向扫地杆上方",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},997889,"当立杆基础不在同一高度上时，必须将高处的纵向扫地杆向低处延长两跨与立杆固定，高低差不应大于（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"0．5m",{"key":24,"text":197,"correct":26},"0．7m",{"key":28,"text":199,"correct":22},"1．0m",{"key":31,"text":201,"correct":26},"1．2m",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},997891,"下列关于脚手板设置时，脚手架的要求中正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"当使用冲压钢脚手板、木脚手板、竹串片脚手板时，双排脚手架的横向水平杆两端均采用直角扣件固定在立杆上",{"key":24,"text":209,"correct":22},"当使用冲压钢脚手板、木脚手板、竹串片脚手板时，单排脚手架的横向水平杆的一端，应用直角扣件固定在纵向水平杆上，另一端插入墙内，插入长度不应小于180mm",{"key":28,"text":211,"correct":26},"使用竹笆脚手板时，双排脚手架的横向水平杆两端，应使用直角扣件固定在纵向水平杆上",{"key":31,"text":213,"correct":26},"使用竹笆脚手板时，单排脚手架的横向水平杆一端，应使用直角扣件固定在立杆上，另一端插人墙内，插入长度不应小于280mm",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},997893,"下列关于脚手板的设置说法中，错误的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"作业层脚手板应铺满、铺稳",{"key":24,"text":221,"correct":26},"冲压钢脚手板、木脚手板、竹串片脚手板等，应设置在三根横向水平杆上",{"key":28,"text":223,"correct":26},"当脚手板长度小于2m时可采用两根横向水平杆支撑，但应将脚手板两端与其可靠固定，严防倾翻",{"key":31,"text":225,"correct":22},"脚手板对接平铺时．接头处必须设一根小横杆",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},997894,"下列关于单、双排脚手架门洞桁架构造的规定，说法错误的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"单排脚手架门洞处，应在平面桁架的每一节间设置一根斜腹杆",{"key":24,"text":233,"correct":22},"斜腹杆宜采用旋转扣件固定在与之相交的纵向水平杆上",{"key":28,"text":235,"correct":26},"单排脚手架过窗洞时应增设立杆或增设一根纵向水平杆",{"key":31,"text":237,"correct":26},"门洞桁架中伸出上下弦杆的杆件端头，均应增设一个防滑扣件，该扣件宜紧靠主节点处的扣件",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},997896,"下列关于横向斜撑设置的说法中错误的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"横向斜撑应在同一节间由底至顶呈之字形连续设置",{"key":24,"text":245,"correct":26},"高度在24m以下的封闭型双排脚手架可不设横向斜撑",{"key":28,"text":247,"correct":22},"高度在24m以上的封闭型双排脚手架，可只在拐角处设置横向斜撑",{"key":31,"text":249,"correct":26},"开口型双排脚手架的两端均必须设置横向斜撑",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},997898,"悬挑式脚手架是指架体结构卸荷在附着于建筑结构的刚性悬挑梁(架)上的脚手架，用于建筑施工中的主体或装修工程的作业及其安全防护需要。悬挑式脚手架搭设符合超过一定规模的危险性较大的分部分项工程的高度为大于等于（ ）。",[254,255,257,259],{"key":20,"text":51,"correct":26},{"key":24,"text":256,"correct":22},"20m",{"key":28,"text":258,"correct":26},"24m",{"key":31,"text":55,"correct":26},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},997900,"下列关于悬挑式脚手架选择和制作的要求中，说法正确的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"当型钢悬挑梁与建筑结构采用螺栓钢压板连接固定时，钢压板尺寸不应小于100mm×10mm",{"key":24,"text":267,"correct":26},"当型钢悬挑梁与建筑结构采用螺栓角钢压板连接时，角钢的规格不应小于100mm×100mm×6mm",{"key":28,"text":269,"correct":26},"悬挑梁型号及锚固件应按设计确定，钢梁截面高度不应小于100mm",{"key":31,"text":271,"correct":22},"钢丝绳与建筑结构拉结的吊环应使用HPB235级钢筋，其直径不宜小于20mm",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},997902,"操作平台的构造、荷载要求及搭设与拆除，与脚手架相近。为方便施工现场的使用与管理，要求操作平台符合相关脚手架规范和要求。下列不属于施工现场操作平台常见分类的是（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"移动式操作平台",{"key":24,"text":279,"correct":26},"落地式操作平台",{"key":28,"text":281,"correct":26},"悬挑式操作平台",{"key":31,"text":283,"correct":22},"液压式操作平台",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},997903,"作业人员在使用操作平台进行施工时，为了防止平台移动宜将立柱与地坪间垫实。因此立柱底部离地面不得超过80mm或行走轮和导向轮应配有制动器或刹车闸等固定措施。下列关于移动式操作平台的要求中，说法错误的是（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":26},"操作平台采用φ48mm×3．6mm钢管扣件连接，亦可采用门架式部件",{"key":24,"text":291,"correct":26},"操作平台四周必须设置防护栏杆",{"key":28,"text":293,"correct":22},"移动式操作平台在移动时，操作平台上的人员应放低重心，且佩戴安全防护装置",{"key":31,"text":295,"correct":26},"单独设置的操作平台应设置供人上下、踏步间距不大于400mm的扶梯",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},997905,"悬挑式操作平台可分为斜拉方式的悬挑式操作平台和下支承方式的悬挑式操作平台两种方式。下列关于悬挑式操作平台规定的说法中，错误的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"悬挑式操作平台的搁置点、拉结点、支撑点应设置在主体结构上",{"key":24,"text":303,"correct":26},"悬挑式操作平台的悬挑长度不宜大于5m",{"key":28,"text":305,"correct":22},"悬挑式操作平台的外侧应略低于内侧，外侧应安装固定的防护栏杆并应设置防护挡板完全封闭",{"key":31,"text":307,"correct":26},"不得在悬挑式操作平台吊运、安装时上人",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},997907,"脚手架的基础可以用十个字概括“平整、夯实、硬化、垫木、排水(沟槽)”，下列关于脚手架安全要求的说法中正确的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"现浇混凝土宽度应超出脚手架宽度两边各10mm以上．待混凝土强度达到70％以上时才可搭设脚手架",{"key":24,"text":315,"correct":22},"底座底面标高以高于自然地坪50mm为宜",{"key":28,"text":317,"correct":26},"地基应里高外低，坡度不少于8％。应沿地基周围设置排水槽",{"key":31,"text":319,"correct":26},"立杆底部垫设垫板时，垫板的长度应不少于5跨",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},997909,"下列关于脚手架的设计、搭设、使用和维护的表述正确的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"结构应稳定，不得发生变形",{"key":24,"text":327,"correct":26},"应满足使用要求，通过其他附加设施实现安全防护功能",{"key":28,"text":329,"correct":26},"在使用中，脚手架结构性能可发生明显改变",{"key":31,"text":331,"correct":22},"当遇意外作用或偶然超载时，不得发生整体破坏",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},997911,"下列关于木质脚手架材料的说法中，错误的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"木杆常用剥皮杉杆或落叶松",{"key":24,"text":339,"correct":26},"木杆立杆和斜杆(包括斜撑、抛撑、剪刀撑等)的小头直径一般不小于70mm",{"key":28,"text":341,"correct":26},"木杆纵向水平杆、横向水平杆的小头一般不小于80mm",{"key":31,"text":343,"correct":22},"木质脚手板的厚度一般不小于30mm",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},997912,"下列关于竹质脚手架材料的说法中，错误的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"竹质立杆、斜撑、顶撑、抛撑、剪刀撑、扫地杆和纵向水平杆的小头一般不小于75mm",{"key":24,"text":351,"correct":26},"竹质纵、横向水平杆的小头不小于90mm",{"key":28,"text":353,"correct":26},"对直径为60～90mm的水平杆杆件，应双杆合并使用",{"key":31,"text":355,"correct":22},"主要受力杆件的使用期限不宜超过3年",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},997914,"下列关于立杆设置的说法中，错误的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"每根立杆底部应设置底座，座下再设垫板",{"key":24,"text":363,"correct":22},"脚手架底层步距不应大于3m",{"key":28,"text":365,"correct":26},"立杆必须用连墙件与建筑物可靠连接",{"key":31,"text":367,"correct":26},"立杆接长除顶层顶部可采用搭接外，其余各层必须采用对接扣件连接",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},997916,"下列关于连墙杆的设置中，说法错误的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"宜靠近主节点设置，偏离主节点的距离不应大于300mm",{"key":24,"text":375,"correct":26},"连墙件应从底层第一步处开始设置，当该处设置有困难时，应采用其他可靠措施固定",{"key":28,"text":377,"correct":22},"连墙件中的连墙杆应向脚手架一端下斜连接",{"key":31,"text":379,"correct":26},"对高度24m以上的双排脚手架，应采用刚性连墙件与建筑物连接",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},997918,"双排脚手架应设置剪刀撑与横向斜撑，单排脚手架应设置剪刀撑。每道剪刀撑跨越立杆的根数为5～6根，斜杆与地面的倾角应在45°～60°之间。当剪刀撑斜杆与地面的倾角为45°时，剪刀撑跨越立杆的最多根数为（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"4",{"key":24,"text":387,"correct":26},"5",{"key":28,"text":389,"correct":26},"6",{"key":31,"text":391,"correct":22},"7",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},997920,"下列关于剪刀撑设置的说法中，错误的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"剪刀撑斜杆的接长应采用搭接或对接，应用旋转扣件固定，旋转扣件中心线至主节点的距离不应大于150mm",{"key":24,"text":399,"correct":26},"高度在24m及以上的双排脚手架应在外侧全立面连续设置剪刀撑",{"key":28,"text":401,"correct":26},"高度在24m以下的双排脚手架，均必须在外侧两端、转角及中间间隔不超过15m的立面上，各设置一道剪刀撑，并应由底至顶连续设置",{"key":31,"text":403,"correct":22},"高度在24m以下的单排脚手架，可只在外侧两端设置一道剪刀撑",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},997922,"下列关于悬挑式脚手架选择和制作的要求中，说法错误的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"型钢悬挑梁悬挑端应设置能使脚手架立杆与钢梁可靠固定的定位点，定位点离悬挑梁端部不应小于100mm",{"key":24,"text":411,"correct":22},"悬挑架的支承结构应为型钢制作的悬挑梁或悬桁架等，也可采用钢管",{"key":28,"text":413,"correct":26},"悬挑架应水平设置在梁上。锚固位置必须设置主梁或主梁以内的楼板上，不得设置在外伸阳台上或悬挑板上",{"key":31,"text":415,"correct":26},"节点的制作必须采用焊接或螺栓连接的结构，不得采用扣件连接",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},997924,"移动式操作平台具有独立的机构，可以搬移。常用于构件施工、装修工程和水电安装等作业。下列关于移动式操作平台的设置要求中，正确的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"从移动式的特点方面考虑移动式操作平台的面积不应超过30m2",{"key":24,"text":423,"correct":26},"为防止操作平台倾覆。其高度不应超过24m",{"key":28,"text":425,"correct":22},"为保证操作平台整体稳定性其高宽比不应大于3：1",{"key":31,"text":427,"correct":26},"为保证操作平台整体安全其所承受的施工荷载不应超过150kN／m2",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},997926,"落地式操作平台应独立设置，并应与建筑物进行刚性连接，不得与脚手架连接。下列关于落地式操作平台的要求中，错误的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"落地式操作平台的面积不应超过15m2",{"key":24,"text":435,"correct":26},"高度不应超过15m",{"key":28,"text":437,"correct":26},"高宽比不应大于2．5：1",{"key":31,"text":439,"correct":26},"施工平台施工荷载不应超过2．0kN／m2，接料平台的施工荷载不应超过3．0kN／m2",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},997928,"脚手架拆除时，交替的拆除应从上而下逐层进行，严禁上下同时作业。下列关于脚手架拆除的要求中，错误的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"拆除的杆件、构配件应采用机械或人工运至地面，严禁抛掷",{"key":24,"text":447,"correct":22},"同层杆件和构配件必须按先内后外的顺序拆除",{"key":28,"text":449,"correct":26},"剪刀撑、斜撑杆等加固杆件必须在拆卸至该杆件所在部位时再拆除",{"key":31,"text":451,"correct":26},"拆除作业过程中，当架体的自由端高度超过2个步距时，必须采取临时拉结措施",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},997931,"斜道可用于人行并兼作材料运输的通道，下列关于斜道的要求中，说法错误的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":26},"高度为3m的脚手架，宜采用一字形斜道",{"key":24,"text":459,"correct":22},"高度为3m的脚手架，宜采用之字形斜道",{"key":28,"text":461,"correct":26},"运料斜道宽度不应小于1．5m，坡度不应大于1：6",{"key":31,"text":463,"correct":26},"人行斜道宽度不应小于1m，坡度不应大于1：3",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},997933,"脚手架工程必须有完善的施工方案。并经企业技术负责人审批。并且有完善的安全防护措施，要按规定设置安全网、防护栏、挡脚板。下列关于脚手架工程的安全技术要求中，说法错误的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"操作人员上下架子，要有保证安全的扶梯、爬梯或斜道",{"key":24,"text":471,"correct":26},"必须有良好的防电、避雷装置，钢脚手架等均应可靠接地，高于四周建筑物的脚手架应设避雷装置",{"key":28,"text":473,"correct":22},"脚手板要铺满、铺稳，应保留探头板，并要保证有3个支撑点，并绑扎牢固",{"key":31,"text":475,"correct":26},"遇6级以上大风或大雾、大雨，应暂停高处作业，雨雪后上架操作要有防滑措施",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},997938,"模板工程的劳动用工约占混凝土工程总用工的1／3。模板通常由3部分组成，分别是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"模板面、支承结构、连接配件",{"key":24,"text":483,"correct":26},"钢支柱、扣件、脚手板",{"key":28,"text":485,"correct":26},"覆面木胶合板、覆面竹胶合板、复合纤维板",{"key":31,"text":487,"correct":26},"钢材、木材、铝合金",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},997948,"关于模板的面板材料下列说法错误的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"模板的面板只可用钢、木、复合纤维板",{"key":24,"text":495,"correct":26},"覆面木胶合板厚度应采用12～18mm的板材",{"key":28,"text":497,"correct":26},"覆面竹胶合板厚度不小于15mm",{"key":31,"text":499,"correct":26},"复合纤维板厚度应采用12mm及以上板材",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},997957,"荷载设计值应符合相关规定。荷载分项系数分为永久荷载和活荷载，永久荷载和活荷载的取值分别为（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"0．8；1．0",{"key":24,"text":507,"correct":26},"1．0；1．2",{"key":28,"text":509,"correct":22},"1．2；1．4",{"key":31,"text":511,"correct":26},"1．4；1．6",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},997967,"拆模时混凝土强度必须符合要求，下列关于模板拆除的说法中，正确的是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"不承重的侧模板，应根据与结构同条件养护试块强度达到规定，方可拆除",{"key":24,"text":519,"correct":26},"一般墙体大模板在常温条件下，只要混凝土强度能保证其表面及棱角不因拆除模板而受损坏，即可拆除",{"key":28,"text":521,"correct":26},"承重模板。混凝土强度达到1N／mm2即可拆除",{"key":31,"text":523,"correct":22},"在拆模过程中，实际结构混凝土强度并未达到要求，应暂停拆模",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},997976,"一般现浇楼盖及框架结构的拆模顺序是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"拆柱模斜撑与柱箍→拆柱侧模→拆楼板底模→拆梁侧模→拆梁底模",{"key":24,"text":531,"correct":26},"拆梁底模→拆梁侧模→拆楼板底模→拆柱侧模→拆柱模斜撑与柱箍",{"key":28,"text":533,"correct":26},"拆柱侧模→拆柱模斜撑与柱箍→拆梁底模→拆梁侧模→拆楼板底模",{"key":31,"text":535,"correct":26},"拆楼板底模→拆梁底模→拆柱模斜撑与柱箍→拆梁侧模→拆柱侧模",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},997986,"现浇柱模板拆除顺序是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":26},"拆除斜撑或拉杆(或钢拉条)→拆除竖楞→自上而下拆除柱箍或横楞",{"key":24,"text":543,"correct":26},"自上而下拆除柱箍或横楞→拆除斜撑或拉杆(或钢拉条)→拆除竖楞",{"key":28,"text":545,"correct":26},"自上而下拆除柱箍或横楞→拆除竖楞→拆除斜撑或拉杆(或钢拉条)",{"key":31,"text":547,"correct":22},"拆除斜撑或拉杆(或钢拉条)→自上而下拆除柱箍或横楞→拆除竖楞",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},997995,"模板安装应按设计与施工说明书循序拼装。下列关于模板施工的技术要求中，说法错误的是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"竖向模板和支架支承部分安装在基土上时，可不加设垫板",{"key":24,"text":555,"correct":26},"模板安装时，上下应有人接应，随装随运，严禁抛掷",{"key":28,"text":557,"correct":26},"五级风及其以上应停止一切吊运作业",{"key":31,"text":559,"correct":26},"严禁将模板与井字架脚手架或操作平台连成一体",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":31,"analysis":33},998004,"模板工程的施工安全的重要性尤为突出，下列不属于模板分类的是（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":26},"定型组合模板",{"key":24,"text":567,"correct":26},"墙体大模板",{"key":28,"text":569,"correct":26},"飞模",{"key":31,"text":571,"correct":22},"自提升式钢模板",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},998013,"下列关于模板设计计算的要求中，正确的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":26},"钢模板及其支撑其界面塑性发展系数取2．0",{"key":24,"text":579,"correct":26},"受压立杆梢径不得小于20mm",{"key":28,"text":581,"correct":26},"钢杆件受拉构件长细比不应大于250",{"key":31,"text":583,"correct":22},"木杆件受拉构件长细比不应大于250",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},998023,"不属于城市轨道交通特点的是（ ）",[588,590,592,594],{"key":20,"text":589,"correct":26},"安全性好",{"key":24,"text":591,"correct":26},"防空好",{"key":28,"text":593,"correct":22},"运量小",{"key":31,"text":595,"correct":26},"速度快",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},998032,"目前地铁车站施工的主要工法有明挖法、暗挖法、盖挖法及这几种方法的组合与变化形式，如遇到浅埋车站，征占地较容易，可使用的空间比较大，周边环境简单的环境时，可采用（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"明挖法",{"key":24,"text":603,"correct":26},"盖挖法",{"key":28,"text":605,"correct":26},"暗挖法",{"key":31,"text":607,"correct":26},"盾构法",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":24,"analysis":33},998042,"目前地铁车站施工的主要工法有明挖法、暗挖法、盖挖法及盾构法。充分利用围岩的自承作用，要求初期支护具有一定刚度，以改造地质条件为前提，以控制地表沉降为重点，以格栅和喷锚作为初期支护手段，按照十八字原则进行设计和施工的施工方法，属于（ ）。",[612,613,614,615],{"key":20,"text":601,"correct":26},{"key":24,"text":605,"correct":22},{"key":28,"text":603,"correct":26},{"key":31,"text":607,"correct":26},[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]