[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-732-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},732,"安全生产专业实务(原案例)","建筑工程",0,22,50,1210,[13,34,46,58,70,82,94,106,117,126,138,150,162,174,186,198,206,218,230,242,254,266,278,290,302,314,326,338,349,358,366,378,390,402,414,426,438,450,462,474,486,498,510,522,530,542,554,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},997806,1,"单选题","搭设与拆除柱模板、悬挑式模板超出要求的高度时，应设置操作平台。设置操作平台的高度为（ ）以上。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2m",true,{"key":24,"text":25,"correct":26},"B","5m",false,{"key":28,"text":29,"correct":26},"C","8m",{"key":31,"text":32,"correct":26},"D","10m","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},997807,"进行交叉作业时，下层作业的位置，必须确定处于上层高度可能坠落范围半径之外。不符合此条件，中间应设置安全防护层，下方应设置警戒隔离区。下列有关说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"处于起重设备的起重机臂回转范围内的通道，顶部应搭设防护棚",{"key":24,"text":41,"correct":26},"操作平台内侧通道的上下方应设置阻挡物体坠落的隔离防护措施",{"key":28,"text":43,"correct":22},"防护棚的棚顶采用竹笆或胶合板搭设时，可采用单层搭设",{"key":31,"text":45,"correct":26},"当建筑物高度大于24m，并采用木板搭设时，应搭设双层防护棚，两层防护棚的间距不应小于700mm",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},997808,"悬挑式操作平台应采用型钢作主梁与次梁，满铺木板或同等强度的其他材料，并应采用螺栓与型钢固定。满铺木板的厚度不应小于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"20mm",{"key":24,"text":53,"correct":22},"50mm",{"key":28,"text":55,"correct":26},"100mm",{"key":31,"text":57,"correct":26},"200mm",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},997809,"建设工程施工现场悬挑式钢平台由于吊环节点设置不科学、不合理，导致悬挑式钢平台坠落的生产安全事故时有发生。下列关于悬挑式钢平台安全技术要求的说法中，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"悬挑式钢平台每次进场、组装、安装前，均应对安装作业有关人员实行书面安全技术交底",{"key":24,"text":65,"correct":26},"在使用前交底人应组织有关人员，依据专项施工方案与安全技术交底内容进行验收",{"key":28,"text":67,"correct":26},"遇有六级(含)以上大风或恶劣天气，必须停止悬挑式钢平台安装作业",{"key":31,"text":69,"correct":22},"平台上严禁2人同时作业",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},997810,"卸料平台属危险性较大的分部分项工程，施工单位应编制专项施工方案，严格按照方案进行施工。下列关于卸料平台的要求中，说法错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"槽钢、钢丝绳、钢管如有严重腐蚀、压扁或裂纹的，禁止使用",{"key":24,"text":77,"correct":26},"为防止卸料平台外倾，提高平台的整体稳定性，应设置备用的安全钢丝绳",{"key":28,"text":79,"correct":26},"地面上遇六级(含六级)以上大风时，卸料平台停止使用",{"key":31,"text":81,"correct":22},"建筑高度在300m以上的卸料平台底部应增加防风上吸的防护栏杆",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},997811,"下列关于剪力墙结构体系中悬挑式钢平台设置不符合要求的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"每侧上下各两个吊点(2根钢丝绳)须独立设置，不得采用钢丝绳从平台下兜底的方式",{"key":24,"text":89,"correct":22},"平台三面临边应设置围挡，栏杆防护高度为1．2m，且用硬质材料设置。严禁开孔",{"key":28,"text":91,"correct":26},"平台满铺50mm厚的木板且固定",{"key":31,"text":93,"correct":26},"严禁使用花篮螺栓调节钢丝绳松紧",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},997812,"安装平面垂直于水平面，主要用来防止人或物坠落的安全网称为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"平网",{"key":24,"text":101,"correct":26},"横网",{"key":28,"text":103,"correct":22},"立网",{"key":31,"text":105,"correct":26},"竖网",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},997813,"安装平网时，除按上述要求外，还要遵守支搭安全网的三要素，即负载高度、网的宽度和缓冲的距离。依据负载高度的要求，两层平网间距不得超过（ ）。",[110,112,114,115],{"key":20,"text":111,"correct":26},"3m",{"key":24,"text":113,"correct":26},"6m",{"key":28,"text":32,"correct":22},{"key":31,"text":116,"correct":26},"15m",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},997814,"安装平网三要是素负载高度、网的宽度和缓冲的距离，使用3m宽的安全平网时，网底距下方物体表面不得小于（ ）。",[121,123,124,125],{"key":20,"text":122,"correct":26},"1m",{"key":24,"text":21,"correct":26},{"key":28,"text":111,"correct":22},{"key":31,"text":25,"correct":26},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},997815,"安全网搭设应牢固、严密、完整有效、易于拆卸。安全网的支撑架应具有足够的强度和稳定性。下列关于安全网搭设的要求中，说法正确的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":26},"密目式安全立网搭设时，系绳应绑扎在支撑架上，间距不得大于200mm",{"key":24,"text":133,"correct":26},"当立网用于龙门架、物料提升架及井架的封闭防护时，系绳应绑在支架上．间距不得大于450mm",{"key":28,"text":135,"correct":26},"用于电梯、钢结构和框架结构及构筑物封闭防护的平网，系绳沿网边均匀分布，间距不得大于450mm",{"key":31,"text":137,"correct":22},"电梯井内平网网体与井壁的空隙不得大于25mm",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},997816,"密目式安全立网网体上不应有断纱、破洞、变形及有碍使用的编织缺陷。 下列关于安全立网的技术要求中，说法错误的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":26},"缝线不应有跳针、漏缝，缝边应均匀",{"key":24,"text":145,"correct":22},"每张密目网不应有缝接",{"key":28,"text":147,"correct":26},"开眼环扣孔径不应小于8mm",{"key":31,"text":149,"correct":26},"系绳断裂强力不应小于2000N",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},997817,"下列关于安全帽技术性能说法错误的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"帽壳与帽衬之间有15～25mm的间隙",{"key":24,"text":157,"correct":26},"普通安全帽不得超过430g；防寒安全帽不超过600g",{"key":28,"text":159,"correct":26},"当帽壳留有通气孔时，通气孔总面积为150～450mm2",{"key":31,"text":161,"correct":26},"在高温、低温等情况下，传递到头模上的力不超过4900N",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},997818,"安全带是防止高处作业人员发生坠落或发生坠落后将作业人员安全悬挂的个人防护装备，被广大建筑工人誉为“救命带”。如下图所示安全带，属于（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"单背带安全带",{"key":24,"text":169,"correct":26},"双背带安全带",{"key":28,"text":171,"correct":26},"环抱式安全带",{"key":31,"text":173,"correct":22},"五点式安全带",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},997819,"坠落悬挂安全带的伸展长度或坠落距离不应大于产品标识的数值。坠落停止后，织带或绳在调节扣内的滑移不应大于（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"15mm",{"key":24,"text":181,"correct":22},"25mm",{"key":28,"text":183,"correct":26},"35mm",{"key":31,"text":185,"correct":26},"45mm",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},997820,"安全带是高处作业人员预防坠落伤亡的防护用品，其作用在于通过束缚人的腰部，使高空坠落的惯性的到缓冲，减轻和消除高空坠落所引起的人身伤害。下列关于安全带使用注意事项的说法中，错误的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":26},"安全带严禁打结、续接",{"key":24,"text":193,"correct":22},"使用中，要可靠的挂在牢固的地方，低挂高用，避免明火和刺割",{"key":28,"text":195,"correct":26},"2m以上的悬空作业，必须使用安全带",{"key":31,"text":197,"correct":26},"在无法直接挂设安全带的地方，应设置安全带的安全拉绳、安全栏杆等",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},997821,"安装平面平行于水平面，主要用来接住坠落的人和物的安全网称为（ ）。",[202,203,204,205],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":26},{"key":28,"text":103,"correct":26},{"key":31,"text":105,"correct":26},{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},997822,"安全平网可采用棉纶、维纶、涤纶或其他材料，其物理性能、耐候性能应符合标准要求。关于安全平网的技术要求的说法中，错误的是（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"平网上所用的网绳、边绳、系绳、筋绳均应由不小于2股单绳制成",{"key":24,"text":213,"correct":26},"平网上的所有节点应固定",{"key":28,"text":215,"correct":26},"平网为3m×6m",{"key":31,"text":217,"correct":26},"相邻两系绳间距不应大于750mm，系绳长度不应小于800mm",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":20,"analysis":33},997823,"安全网材质、规格、物理性能、耐火性、阻燃性应满足标准。下列关于安全网的使用规则的说法中，错误的是（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"采用平网防护时，可使用密目式安全立网代替平网使用",{"key":24,"text":225,"correct":26},"安装时，系接点沿网边均匀分布，其距离不得大于75cm",{"key":28,"text":227,"correct":26},"有筋绳的网在安装时，必须把筋绳连接在支撑物上",{"key":31,"text":229,"correct":26},"多张网连接使用时，相邻部分应靠紧或重叠",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},997825,"土按其不同粒组的相对含量可划分为三类。当砾粒组质量大于总质量的50％的粗粒土称为砾类土，砾类土属于（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":26},"巨粒土",{"key":24,"text":237,"correct":22},"粗粒土",{"key":28,"text":239,"correct":26},"砂粒土",{"key":31,"text":241,"correct":26},"细粒土",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":31,"analysis":33},997827,"当出现基坑坍塌或人身伤亡事故时，应急响应必须由建设单位或工程总承包单位组织实施。当基坑变形超过报警值时应（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":26},"及时进行疏导、排泄，截断水源",{"key":24,"text":249,"correct":26},"立即停止基坑开挖，回填反压、基坑侧壁卸载，必要时及时疏散人员",{"key":28,"text":251,"correct":26},"立即关闭危险管道阀门，防止发生火灾、爆炸等安全事故",{"key":31,"text":253,"correct":22},"调整分层、分段土方开挖施工方案，加大预留土墩，坑内堆砂袋、回填土、增设锚杆、支撑等",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},997828,"土石方爆破作业常见的起爆方法有（ ）三种。",[258,260,262,264],{"key":20,"text":259,"correct":22},"电力起爆、导爆索起爆、导爆管起爆",{"key":24,"text":261,"correct":26},"火雷管起爆、导火索起爆、导爆管起爆",{"key":28,"text":263,"correct":26},"电力起爆、导火索起爆、导爆雷管起爆",{"key":31,"text":265,"correct":26},"火雷管起爆、导爆索起爆、导爆雷管起爆",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},997829,"浅孔爆破宜采用台阶爆破法，台阶高度不宜超过5m，在台阶形成之前进行爆破时应加大警戒范围。下列关于浅孔爆破的要求中，说法错误的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":26},"装药前应进行验孔",{"key":24,"text":273,"correct":26},"炮孔采用人工装药时，不应过度挤压或分散装药",{"key":28,"text":275,"correct":26},"使用机械装填炸药时，应防止静电引起早爆",{"key":31,"text":277,"correct":22},"起爆后。应至少2min后方可进入爆破区检查",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":28,"analysis":33},997830,"大规模深孔爆破应预先进行网路模拟实验。下列关于深孔爆破的要求中，说法错误的是（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":26},"深孔爆破应采用台阶爆破法．台阶高度宜为8～15m",{"key":24,"text":285,"correct":26},"深孔爆破宜采用电爆网路或导爆管网路起爆",{"key":28,"text":287,"correct":22},"当发生装药卡堵时，可用钻杆捣捅药包",{"key":31,"text":289,"correct":26},"起爆后，应至少15min后方可进入爆破区检查",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},997831,"爆破后应进行检查，需要由现场技术负责人、起爆组长和有经验的爆破员、安全员组成检查小组实施的爆破工程等级为（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":26},"A级",{"key":24,"text":297,"correct":26},"D级",{"key":28,"text":299,"correct":22},"A级和B级",{"key":31,"text":301,"correct":26},"C级和D级",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},997832,"下列关于施工安全作业的要求中，正确的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"在挖土机工作范围内，不允许进行其他作业",{"key":24,"text":309,"correct":26},"除基坑支护设计要求允许外，基坑边10m范围内不得堆土、推料、放置机具",{"key":28,"text":311,"correct":26},"多台机械开挖．挖土机间距应大于1m",{"key":31,"text":313,"correct":26},"逆作法挖土应由下而上，先挖坡脚。逐层进行",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},997833,"土石方开挖宜根据支护形式分为无围护结构的放坡开挖、有围护结构物内支撑的基坑开挖及有围护结构有内支撑的基坑开挖等方式。下列有关开挖方式的说法中正确的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":26},"深基坑工程中面积较大的基坑宜采用放坡挖土、逆作法挖土",{"key":24,"text":321,"correct":22},"有内支撑结构的深基坑土石方开挖，可以分为明挖法和暗挖法",{"key":28,"text":323,"correct":26},"多道内支撑基坑开挖遵循“分层支撑、分层开挖、限时支撑、先挖后撑”的原则，且分层厚度须满足设计工况要求",{"key":31,"text":325,"correct":26},"分层支撑和开挖的基坑上部可采用大型施工机械开挖，下部宜采用小型施工机械和人工挖土，在内支撑以下挖土时，每层开挖深度不得大于20m",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},997834,"采用放坡开挖的基坑，应验算基坑边坡的稳定性，边坡坡度应根据土层性质、开挖深度确定，各级边坡坡度不宜大于（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":26},"1：1．05",{"key":24,"text":333,"correct":26},"1：1．20",{"key":28,"text":335,"correct":26},"1：1．25",{"key":31,"text":337,"correct":22},"1：1．50",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":28,"analysis":33},997835,"采用复合土钉支护的基坑开挖施工，基坑开挖应与土钉施工分层交替进行，应缩短无支护暴露时间。采用分层方法进行土方开挖，每层土方开挖的底标高应低于相应土钉位置，且距离不宜大于200mm，每层分段长度不应大于（ ）。",[342,343,345,347],{"key":20,"text":32,"correct":26},{"key":24,"text":344,"correct":26},"20m",{"key":28,"text":346,"correct":22},"30m",{"key":31,"text":348,"correct":26},"40m",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},997836,"岛式土方开挖时，中部岛状土体的高度不宜大于6m。中部岛状土体高度大于规定值时，应采用二级放坡形式，每级边坡坡度不宜大于1：1．5，总边坡坡度不应大于1：2．0。应采用二级放坡形式的中部岛状土体高度大于（ ）。",[353,354,356,357],{"key":20,"text":21,"correct":26},{"key":24,"text":355,"correct":22},"4m",{"key":28,"text":25,"correct":26},{"key":31,"text":113,"correct":26},{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},997837,"盆式土方开挖时盆边土体的高度不宜大于6m，盆边上口宽度不宜小于8m。盆边土体的高度大于规定值时，应采用二级放坡形式，坡间放坡平台宽度不应小于3m。应采用二级放坡形式的盆边土体高度大于（ ）。",[362,363,364,365],{"key":20,"text":122,"correct":26},{"key":24,"text":21,"correct":26},{"key":28,"text":111,"correct":26},{"key":31,"text":355,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},997838,"下列关于土石方开挖的安全防护措施的说法中，错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"开挖深度超过3m的基坑周边必须安装防护栏杆，防护栏杆高度不应低于1m",{"key":24,"text":373,"correct":26},"基坑内的专用梯道应设扶手栏杆，专用梯道宽度不应小于1m",{"key":28,"text":375,"correct":26},"同一垂直作业面需要同时作业时，上下层之间应采取隔离防护措施",{"key":31,"text":377,"correct":26},"采用井点降水时，井口设置防护盖板或围栏，警示标志应明显",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},997839,"检查员发现盲炮或怀疑盲炮。应向爆破负责人报告后组织进一步及检查和处理；在上述情况下，不应发出解除警戒信号。电力起爆网路发生盲炮时，应立即切断电源，及时将盲炮电路（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"开路",{"key":24,"text":385,"correct":26},"断路",{"key":28,"text":387,"correct":22},"短路",{"key":31,"text":389,"correct":26},"通电",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},997840,"基坑支护机构的监测应根据结构类型和地下水控制方法选择基坑监测项目，其中根据支护结构的安全等级监测项目可分为“应测”“宜测”和“选测”三种。下列监测项目中，支护结构安全等级全部为“应测”的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"支护结构顶部水平位移",{"key":24,"text":397,"correct":26},"孔隙水压力",{"key":28,"text":399,"correct":26},"土压力",{"key":31,"text":401,"correct":26},"地下水位",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},997841,"当基坑支护结构监测数据出现异常情况时，必须及时进行危险报警，并对基坑支护结构和周边环境中的保护对象采取应急措施。下列情况中不属于应当采取应急措施的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":26},"监测数据达到检测报警值的累计值",{"key":24,"text":409,"correct":22},"基坑出现渗漏",{"key":28,"text":411,"correct":26},"基坑支护结构的支撑或锚杆体系出现过大变形、压屈、断裂、松弛或拔出的迹象",{"key":31,"text":413,"correct":26},"周边管线出现裂缝、泄漏等",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},997842,"基坑开挖作业一旦开始。施工过程将面临很多安全问题，下列关于基坑安全措施的说法中，正确的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"开挖深度超过3m的，必须在沿基坑边设置防护栏杆且在危险处设置警示",{"key":24,"text":421,"correct":26},"作业人员在作业施工时应有安全立足点，垂直交叉作业应有防护措施",{"key":28,"text":423,"correct":22},"基坑内及基坑周边应设置良好的排水系统，并满足施工、防汛要求",{"key":31,"text":425,"correct":26},"基坑周边距基坑边10m范围内可堆放土石方、料具等荷载较重的物料",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},997843,"下列关于基坑内的降水技术要求的说法中，错误的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"降水后基坑内的水位应低于坑底0．5m",{"key":24,"text":433,"correct":26},"当基坑侧壁出现渗水时，应采取有效疏排措施",{"key":28,"text":435,"correct":26},"采用管井时，井口宜高于地面200mm以上，并且应防止物体坠人井内",{"key":31,"text":437,"correct":22},"对坑底渗出的地下水，必须采用明沟排水",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},997844,"基坑开挖过程中，一旦出现了渗水或漏水，应根据水量大小，采用坑底设沟排水、引流修补、密实混凝土封堵、压密注浆、高压喷射注浆等方法及时进行处理。如果水泥土墙等重力式支护结构位移超过设计估计值，应做好监测，掌握发展趋势。若持续发展，则应采用（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"水泥土墙背后卸载、加快垫层施工及加大垫层厚度和架设支撑等方法及时处理",{"key":24,"text":445,"correct":26},"架设支撑或锚杆、支护墙背卸土等方法及时进行处理",{"key":28,"text":447,"correct":26},"及时浇筑垫层，必要时可以加厚垫层，形成下部水平支撑",{"key":31,"text":449,"correct":26},"设坑外回灌井、进行坑底加固、垫层随挖随浇、加厚垫层或采用配筋垫层、设置坑底支撑等方法及时进行处理",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},997845,"护结构或基坑周边环境出现下列规定的报警情况或其他险情时，应立即停止开挖，并应根据危险产生的原因和进一步可能发展的破坏形式。采取控制或加固措施。下列不属于报警情况的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"开挖面出现隆起现象",{"key":24,"text":457,"correct":22},"支护结构构件的内力接近其设计值",{"key":28,"text":459,"correct":26},"基坑周边建筑物、道路、地面出现裂缝，或其沉降、倾斜达到相关规范的变形允许值",{"key":31,"text":461,"correct":26},"基坑出现局部坍塌",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},997846,"当坑底以下存在连续分布、埋深较浅的隔水层时，应采用落底式帷幕。截水帷幕在平面布置上应沿基坑周边闭合。下列关于高压喷射注浆截水帷幕施工的要求中，错误的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"采用排桩咬合的高压喷射注浆截水帷幕时，应先进行高压喷射注浆施工，后进行排桩施工",{"key":24,"text":469,"correct":22},"高压喷射注浆的施工作业顺序应采用隔孔分序方式，相临孔喷射注浆的时间不宜小于12h",{"key":28,"text":471,"correct":26},"喷射注浆时，应由下而上均匀喷射，停止喷射的位置宜高于帷幕设计顶面标高1m",{"key":31,"text":473,"correct":26},"当喷射注浆因故障中途停喷后，继续注浆时应与停喷前的注浆体搭接，其搭接长度不应小于500mm",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},997847,"基坑发生坍塌前主要迹象不包括（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"周围地面出现细微裂缝",{"key":24,"text":481,"correct":26},"支撑系统发出挤压等异常响声",{"key":28,"text":483,"correct":26},"相当数量的锚杆螺母松动，甚至有槽钢松脱现象",{"key":31,"text":485,"correct":26},"支护系统出现局部失稳",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},997848,"基坑支护是指为保证地下主体结构施工和基坑周边环境的安全，对基坑采用的临时性支挡、加固、保护与地下水控制的措施。基坑工程按破坏后果严重程度分为三个安全等级，其中破坏后果最严重的安全等级为（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"一级",{"key":24,"text":493,"correct":26},"二级",{"key":28,"text":495,"correct":26},"三级",{"key":31,"text":497,"correct":26},"特级",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},997849,"下列不属于危险性较大的基坑工程的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"开挖深度未超过3m的基坑(槽)的土方开挖工程",{"key":24,"text":505,"correct":26},"开挖深度未超过3m，但地质条件和周边环境复杂的基坑(槽)支护、降水工程",{"key":28,"text":507,"correct":26},"开挖深度超过3m(含)的基坑(槽)的土方开挖工程",{"key":31,"text":509,"correct":26},"开挖深度超过5m(含)的基坑(槽)的土方开挖、支护、降水工程",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},997850,"下列属于浅基坑的支护方法的是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"锚拉支撑",{"key":24,"text":517,"correct":26},"排桩支护",{"key":28,"text":519,"correct":26},"逆作拱墙",{"key":31,"text":521,"correct":26},"水泥土桩墙",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":28,"analysis":33},997851,"基坑的安全等级分为3个级别，开挖深度为8m且周围环境无特别要求的基坑属于（ ）。",[526,527,528,529],{"key":20,"text":497,"correct":26},{"key":24,"text":491,"correct":26},{"key":28,"text":493,"correct":22},{"key":31,"text":495,"correct":26},{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":28,"analysis":33},997853,"下列关于土方开挖的要求错误的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":26},"土方开挖应遵循“开槽支撑，先撑后挖，分层开挖，严禁超挖”的原则",{"key":24,"text":537,"correct":26},"当开挖基坑土体含水量大而不稳定或基坑较深时，应采用临时性支撑加固",{"key":28,"text":539,"correct":22},"相邻基坑开挖时，应遵循先浅后深或同时进行的施工顺序",{"key":31,"text":541,"correct":26},"当基坑采用降水时，应在降水后开挖地下水位以下的土方。且地下水位应保持在开挖面50cm以下",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},997854,"支护的作业应按支护结构设计规定的施工顺序和开挖深度分层开挖。下列关于支护作业的要求中，说法错误的是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"当支护结构构件强度接近开挖阶段设计强度时，方可向下开挖",{"key":24,"text":549,"correct":26},"对土钉墙，应在土钉、喷射混凝土面层的养护时间大于2天后，方可开挖下层土方",{"key":28,"text":551,"correct":26},"开挖至锚杆、土钉施工作业面时，开挖面与锚杆、土钉的高差不宜大于500mm",{"key":31,"text":553,"correct":26},"采用锚杆或支撑的支护结构，在未达到设计规定的拆除条件时，严禁拆除锚杆或支撑",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},997856,"深基坑土方开挖，采用支护结构进行支挡时，错误的支护方法是（ ）。",[558,559,561,562],{"key":20,"text":517,"correct":26},{"key":24,"text":560,"correct":26},"地下连续墙",{"key":28,"text":521,"correct":26},{"key":31,"text":563,"correct":22},"临时模板支撑",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},997858,"下列关于钢质脚手架材料的说法中，错误的是（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"钢管的尺寸为50．3mm×6．6mm",{"key":24,"text":571,"correct":26},"扣件式钢管脚手架的扣件，应采用可锻铸铁制作的扣件",{"key":28,"text":573,"correct":26},"扣件的螺杆拧紧扭力矩达到65N?m时不得发生破坏，使用时扭力矩应在40～65N?m之间",{"key":31,"text":575,"correct":26},"冲压钢脚手板的钢板厚度不宜小于1．5mm，板面冲孔内切圆直径应小于25mm",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":31,"analysis":33},997860,"下列关于绑扎材料的说法中，错误的是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":26},"钢丝绑扎木脚手架一般采用8号或10号镀锌钢丝。不得有锈蚀或机械损伤",{"key":24,"text":583,"correct":26},"竹脚手架一般来说应采用竹篾绑扎。竹篾三个月要更换一次",{"key":28,"text":585,"correct":26},"竹竿的绑扎材料严禁重复使用",{"key":31,"text":587,"correct":22},"竹竿的绑扎材料可接长使用",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},997862,"关于杆件、构配件的外观质量的规定，下列说法中错误的是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":26},"不得使用带有裂纹、折痕、表面明显凹陷、严重锈蚀的钢管",{"key":24,"text":595,"correct":22},"铸件表面应粗糙，可有少量不影响性能的砂眼、气孔、裂纹、浇冒口残余等缺陷，表面粘砂应清除干净",{"key":28,"text":597,"correct":26},"冲压件不得有毛刺、裂纹、明显形变、氧化皮等缺陷",{"key":31,"text":599,"correct":26},"焊接件的焊缝应饱满，焊渣应清除干净，不得有未焊透、夹渣、咬肉、裂纹等缺陷",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]